05000348/LER-1981-022, Forwards LER 81-022/03L-0

From kanterella
Jump to navigation Jump to search
Forwards LER 81-022/03L-0
ML20004B000
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 05/21/1981
From: Clayton F
ALABAMA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20004B001 List:
References
NUDOCS 8105270093
Download: ML20004B000 (1)


LER-1981-022, Forwards LER 81-022/03L-0
Event date:
Report date:
3481981022R00 - NRC Website

text

At:bams Power Company 600 North 18th street e

Post Offco Box 2641 Birmingnim. Alabama 35291 Telephone 205 250-1000 F. L CLAYToN, JR.

senior Vice President Alabama Power the sotthem e:ectrc sys:em May 21, 1981 Docket No. 50-348 o7 cJA vp

., = Y\\

=

~

Q k

'V J

U. S. Nuclear Regulatory Commission M

y Office of Inspection and Enforcement j

MAY 2 61981 m. ' ~g u ri tta Street, N.W.

f Suite 3100

- r Atlanta, Georgia 30303 s

,e

Dear Sir:

Jcseph M. Farley Nuclear Plant, Unit 1, Licensee Event Report No.

LER 81-022/03L-0 is forwarded herewith with three (3) copies, in accor-dance with FNP Technical Specification 6,9 to provide thirty (30) days written notification of the occurrence.

If you have any questions, please advise.

Yours very +

y, gg1;v %

F. L. Clayton, Jr.

FLCJr/JRC:nac 1-Enclosure 1

xc: N (30 copies) l Director, MIPC (3 copies) l i

N 64

.t 8.105270093 p