05000336/FIN-2015007-03
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Inadequate Evaluation of Circuit Breaker Interrupting Capability |
Description | The team identified a finding of very low safety significance (Green) involving a non-cited violation (NCV) of Title 10 of the Code of Federal Regulations (10 CFR) Part 50, Appendix B, Criterion III, Design Control, in that Dominion did not correctly evaluate the capability of 4.16 kV breakers to function properly during 3-phase bolted fault design condition. The team reviewed Millstone Unit 2 electrical distribution system analysis calculation (MP2- ENG-ETAP-04014E2), which evaluated adequacy of the circuit breakers for their interrupting rating in accordance with the Institute of Electrical and Electronics Engineers/American National Standards Institute (IEEE/ANSI) C37 series standards, and determined that Dominions shortcircuit fault current calculation did not assume the maximum plant operating voltage as a prefault voltage at the 4.16 kV bus and did not evaluate the plant configuration when emergency diesel generators (EDG) are operating in parallel with offsite power on the associated 4.16 kV emergency bus. The team determined this short-circuit fault current calculation was not in accordance with IEEE/ANSI C37 series standards and was non-conservative in some cases. Dominion entered the issue into their corrective action program and performed additional analysis to determine if the inability of the breaker to interrupt the fault current would result in the fault current affecting the other safety related bus. Dominion concluded that the other bus would not be affected. The team reviewed the analysis and determined it to be acceptable. The finding was determined to be more than minor because it was associated with the Mitigating Systems cornerstone Design Control attribute and adversely affected the cornerstones objective and was similar to Example 3.j in Appendix E of the NRC IMC 0612. Using the NRC IMC 0609, Significance Determination Process, Appendix A, The Significance Determination Process (SDP) for Findings At-Power, Exhibit 2, Mitigating Systems Screening Questions, the finding was determined to be of very low safety significance (Green). There was no crosscutting aspect assigned to the finding because it was not an indicative of current performance. |
Site: | Millstone |
---|---|
Report | IR 05000336/2015007 Section 1R21 |
Date counted | Jun 30, 2015 (2015Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21 |
Inspectors (proximate) | G Morris J Ayala J Patel K Mangan L Mckown P Krohn S Pindale W Sherbin |
Violation of: | 10 CFR 50 Appendix B Criterion III, Design Control |
INPO aspect | |
' | |
Finding - Millstone - IR 05000336/2015007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Millstone) @ 2015Q2