05000336/FIN-2013003-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to implement Annunciator Response Procedure for a Loss of Ventilation during a Battery Charge |
Description | The inspectors identified an NCV of Technical Specification (TS) 6.8.1, Procedures and Programs, for failing to implement Annunciator Response Procedure (ARP) OP-3353VP1B1-4 (BATT ROOM 1, 3, 5, EXHAUST FAN FLOW LOW) and stop the equalizing battery charge that was occurring on three batteries to prevent the buildup of hydrogen gas in the Unit 3 east switchgear room when room ventilation was stopped. After a period of two hours, Dominion stopped the equalizing charge and entered the issue into their CAP as CR511856 and CR519744. The performance deficiency is more than minor because it affected the protection against external factors attribute of the mitigating systems cornerstone and affected the cornerstone objective to ensure the availability, reliability and capability of systems that respond to initiating events, such as fire, to prevent undesirable consequences (i.e. core damage). Specifically, Dominion failed to properly implement the ARP which allowed the potential build-up of hydrogen gas to occur in the east switchgear room. A hydrogen fire in the east switchgear room would have disabled numerous safety-related systems and potentially injured personnel during a time when the plant was in a yellow shutdown risk state based on RCS decay heat removal and power availability. The inspectors determined this finding to be of very low safety significance (Green) because train B was protected and RHR loop B was in operation providing core cooling. Train B components and systems were physically isolated in the west switchgear room. The finding has a cross-cutting aspect in the area of Human Performance, Work Practices, because Dominion did not effectively communicate expectations regarding personnel following procedures. |
Site: | Millstone |
---|---|
Report | IR 05000336/2013003 Section 1R13 |
Date counted | Jun 30, 2013 (2013Q2) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.13 |
Inspectors (proximate) | J Krafty J Laughlin F Bower R Rolph J Ambrosini C Newport E Burkett E Andrews P Kaufman B Haagensen |
Violation of: | Technical Specification - Procedures Technical Specification |
CCA | H.8, Procedure Adherence |
INPO aspect | WP.4 |
' | |
Finding - Millstone - IR 05000336/2013003 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Millstone) @ 2013Q2