05000335/FIN-2015003-04 | 2015Q3 | H.12 | Failure to Follow Reactor Protection System Surveillance Procedure Resulting in Reactor Plant Trip |
05000335/FIN-2015003-05 | 2015Q3 | | Unit 2 Shutdown Due to Through Wall Crack and Leak in the 2B2 Safety Injection Tank Discharge Pipe |
05000335/FIN-2015003-02 | 2015Q3 | | Partial Loss of Unit 1 and Unit 2 Offsite Power Due to Unit 2 6.9 kV Non-Segregated Bus Fault |
05000389/FIN-2015003-03 | 2015Q3 | | Untimely 10 CFR50.72 Notification |
05000335/FIN-2015003-01 | 2015Q3 | H.9 | Unsecured Utility Cart With An Unrestrained Operating Pedestal Fan Near Safety-related ECCS Equipment |
05000335/FIN-2015405-01 | 2015Q3 | H.8 | Security |
05000335/FIN-2015004-01 | 2015Q4 | H.8 | NRC Biennial Written Examinations Did Not Meet Qualitative Standards |
05000335/FIN-2015004-02 | 2015Q4 | | Non-willful Compromise of a Remedial Examination Required by 10 CFR 55.59 Affected the Equitable and Consistent Administration of the Exam |
05000335/FIN-2015004-03 | 2015Q4 | P.3 | Inadequate Corrective Actions to Prevent Fouling of the CCW HXs |
05000335/FIN-2015004-04 | 2015Q4 | P.3 | Procedural Non-compliances Relating to Installed Scaffold Located Near Safety-related SSCs |
05000335/FIN-2015004-05 | 2015Q4 | | Failure to Verify the Adequacy of the Unit 1 and Unit 2 Steam Generator Tube-to-Tubesheet Welds Design |
05000335/FIN-2015010-01 | 2015Q4 | | Implementation of Commitments and Aging Management Programs |
05000335/FIN-2016008-01 | 2016Q1 | P.2 | Failure to Consider Elevated Temperature Effects on MOV Actuator Output Capability |
05000389/FIN-2016001-03 | 2016Q1 | P.2 | Inadequate Corrective Actions to Prevent Failure of the 2C ICW Pump Motor |
05000389/FIN-2016001-02 | 2016Q1 | H.11 | Failure to Provide Detailed Work Instructions Resulted in a Unit Transient |
05000389/FIN-2016001-01 | 2016Q1 | H.8 | Unauthorized Entry into a High Radiation Area |
05000335/FIN-2016008-03 | 2016Q1 | | Inadequate Testing of 125VDC MCCBs |
05000335/FIN-2016008-06 | 2016Q1 | | Failure to Provide a Missile-Protected Intertie |
05000335/FIN-2016008-02 | 2016Q1 | | Failure to Update UFSAR to Reflect Station Blackout Coping Time Basis |
05000335/FIN-2016008-05 | 2016Q1 | | Failure to Verify the Adequacy of Design of Unit 1 Electrical Equipment Room Ventilation System |
05000335/FIN-2016008-04 | 2016Q1 | | Failure to Identify Degraded Condition of Unit 1 Electrical Equipment Room Supply Fan Gravity Dampers |