Title | Partial Loss of Unit 1 and Unit 2 Offsite Power Due to Unit 2 6.9 kV Non-Segregated Bus Fault |
Description | The inspectors identified an unresolved item associated with the partial loss of offsite power as a result of a fault on the 2A1 6.9 kV non-safety bus. On September 17, 2015, a fault of the 2A1 6.9 kV bus connected to the 2A SUT resulted in the loss of power to both the 1A and 2A SUTs. 1A SUT was impacted since it shared a common power supply from the switchyard with the 2A SUT. The 2A1 6.9kV bus is of a bus bar design. The bus is made up of flat copper bars that are bolted together with all three phases contained in a metal enclosure. The phases are supported within the enclosure and insulated from each other using ceramic insulator plates that maintain the spacing between the phases and with the enclosure. Each bar is insulated between the bolted connections with Noryl insulation. Rubber insulating boots cover the bolted connections. The licensees inspection of the 6.9 kV bus determined that the fault occurred at a location where the bus transitions from a vertical to a horizontal orientation. The three insulating boots for this bolted transition were found lying on top of the ceramic insulators between the phases below in the vertical run. The boots had a coating of dust and corrosion products that had flaked off the enclosure. At the close of this inspection period, the licensees root cause evaluation and complete inspection of the 2A1 6.9 kV bus was in progress. The licensee entered this issue in the CAP as AR 2074774. This is an unresolved item pending review of the licensees root cause evaluation to determine whether or not a performance deficiency exists. The NRC will track this issue as an URI. |
Site: | Saint Lucie |
---|---|
Report | IR 05000335/2015003 Section 4OA3 |
Date counted | Sep 30, 2015 (2015Q3) |
Type: | URI: |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | A Goldau A Sengupta B Collins D Bacon J Reyes J Rivera-Ortiz L Suggs P Capehart T Morrisseya Vargasc Thomas J Munday J Reyes S Sanchez T Hoeg T Morrissey |
INPO aspect | |
' | |