Finding | |
---|---|
Title | Unit 2 Shutdown Due to Through Wall Crack and Leak in the 2B2 Safety Injection Tank Discharge Pipe |
Description | On March 30, 2015 the operators reviewed the Unit 2 control room logs and identified increased leakage from the 2B2 SIT. On April 11, 2015, the 2B2 SIT was declared inoperable due to a through wall leak identified on the 12-inch diameter Class 2 piping of the discharge header. The licensee determined that the pipe failed due to a legacy support design from construction, which led to higher levels of stress in the supports weld. The licensee concluded through metallurgical analysis that the pipe flaw propagated through wall due to high cycle fatigue. Prior to the through-wall leak being identified, there were no indications that a flaw existed within the pipe support weld. Additionally, there were no examinations required to be performed on the support that would have recognized a flaw within the support weld. As a result, the inspectors concluded that there was no performance deficiency associated with the pipe failure. The inspectors utilized available risk-informed tools to assess the safety significance of the 2B2 SIT inoperability. Based on the fact that the through-wall leak did not preclude the 2B2 SIT from performing its design basis function while inoperable, the inspectors concluded this event was of very low safety significance. St. Lucie Unit 2 TS limiting condition for operation 3.5.1, Safety Injection Tanks (SIT), requires each RCS safety injection tank to be operable in plant operating Mode 1 through Mode 3. With one SIT inoperable, the inoperable SIT must be returned to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or Unit 2 placed in hot standby within the next six hours and hot shutdown within the following six hours. Contrary to the above, Unit 2 operated for approximately 13 days from March 30, 2015 to April 12, 2015, with the 2B2 SIT inoperable due to a through-wall leak identified on the 12-inch diameter class 2 piping of the discharge header. Although a violation of the TS occurred, the violation was not attributable to an equipment failure that was avoidable by reasonable licensee quality assurance measures or management controls. Therefore, the TS 3.5.1 violation was not associated with a licensee performance deficiency. The inspectors concluded that the violation would normally be characterized as a Severity Level IV violation based on its very low safety significance. The NRC exercised enforcement discretion in Enforcement Action (EA)-14-047, in accordance with Section 2.2.4.d and 3.5 of the Enforcement Policy because the violation was not associated with a licensee performance deficiency; therefore, it will not be considered in the assessment process or the NRCs Action Matrix. This issue was documented in the licensees corrective action program as AR 2039830. Licensee corrective actions included: replacing the leaking pipe spool piece with the through wall flaw (line I-12-SI-459), modifying the supports for line SI- 459, removing support SI-4203-44, revising procedure STD-C-010, Piping and Support Analysis Requirements St. Lucie Units 1 and 2, to include more detail related to weld attachments to specifically address avoiding extended lugs which develop a bending movement, and incorporating considerations associated with using weld attachments in an environment which involves cyclic loading. This LER is closed. |
Site: | Saint Lucie |
---|---|
Report | IR 05000335/2015003 Section 4OA3 |
Date counted | Sep 30, 2015 (2015Q3) |
Type: | Violation: Severity level Enforcement Discretion |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71153 |
Inspectors (proximate) | A Vargas C Thomas J Munday J Reyes S Sanchez T Hoeg T Morrissey |
Violation of: | Technical Specification - Procedures Technical Specification |
INPO aspect | |
' | |
Finding - Saint Lucie - IR 05000335/2015003 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Saint Lucie) @ 2015Q3