05000327/FIN-2013007-06
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Adequately Translate Design Basis Into Procedure Acceptance Criteria Time to Perform Operator Action |
Description | The team identified an Apparent Violation of 10 CFR 50, Appendix B, Criterion III, Design Control, for the licensees failure to correctly translate design basis requirements into emergency sub-procedure, ES- 1.3, Transfer to Residual Heat Removal Containment Sump, Rev. 19. Specifically, the time allotted for operators to perform time critical actions to swap emergency core cooling system (ECCS) pump suction from the refueling water storage tank (RWST) to the containment sump during a small break loss of coolant accident (SBLOCA) did not properly account for the instrument uncertainty and the design basis requirement in Updated Final Safety Analysis Report 15.3.1, to ensure the recovery of the core was demonstrated and to ensure continuous operation of the ECCS. This was a performance deficiency. As immediate corrective action, the licensee performed an operability review and documented the results in the corrective action program as PERs 760336 and 758761. The licensee concluded that there were no current operability concerns, and created Standing Order SO-13-025 to reinforce operator time performance requirements. The performance deficiency was determined to be more than minor because it affected the Design Control attribute of the Mitigating Systems cornerstone, and adversely affected objective of ensuring the availability, reliability, and capability of containment spray pumps, safety injection pumps, and charging pumps during a SBLOCA. Specifically, the licensee failed to demonstrate that operators would be able to successfully complete the time critical actions prior to reaching 8% RWST tank level, which required operators to secure all pumps taking suction from the RWST, because they did not consider the worst case allowable RWST level instrument uncertainty acceptance criteria along with the design pump flow rates. This action would result in the momentary loss of all ECCS high pressure injection during a SBLOCA and did not ensure the availability, reliability, and capability of the ECCS to respond to initiating events. The team used Inspection Manual Chapter 0609, Significance Determination Process, Attachment 4, Initial Characterization of Findings, and Appendix A, The Significance Determination Process for Findings At-Power. The safety significance is to be determined pending review and analysis of additional information from the licensee to determine if this finding is representative of an actual loss of the ECCS safety function. As a result, this finding is characterized as TBD. The finding did not represent an immediate safety concern because a review of past results indicated that operators were consistently performing the actions in times less than required, as documented by simulator testing. This finding was not assigned a cross-cutting aspect because the underlying cause was not indicative of present licensee performance. |
Site: | Sequoyah |
---|---|
Report | IR 05000327/2013007 Section 1R21 |
Date counted | Sep 30, 2013 (2013Q3) |
Type: | AV: |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21 |
Inspectors (proximate) | J Bartley N Coovert R Nease T Fanellid Masg Skinner N Coovert R Nease R Patterson S Walker V Ferrarini |
INPO aspect | |
' | |
Finding - Sequoyah - IR 05000327/2013007 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|