05000321/FIN-2012008-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Report a Degraded Primary Safety Barrier per 10 CFR 50.72(b)(3)(ii)(A) |
Description | The team identified a non-cited violation of 10 CFR 50.72(b)(3)(ii)(A), for the licensees failure to provide an 8-hour event notification to the NRC for the plant being in a condition that caused a principal safety barrier to be seriously degraded. The licensee generated condition report 489079 to document the failure to provide the required 8-hour notification. The team determined that the failure to report a seriously degraded principal safety barrier as required by 10 CFR 50.72(b)(3)(ii)(A) was a performance deficiency. Using the guidance of Inspection Manual Chapter 0612, Appendix B, Issue Screening, the team determined the performance deficiency involved a violation that could have impacted the regulatory process, therefore, it was dispositioned using the traditional enforcement process. In accordance with Section 6.9.d.9 of the NRC Enforcement Policy, a failure to make a report required by 10 CFR 50.72 is a Severity Level IV violation. Cross-cutting aspects are not assigned to traditional enforcement violations. |
Site: | Hatch |
---|---|
Report | IR 05000321/2012008 Section 1R21 |
Date counted | Sep 30, 2012 (2012Q3) |
Type: | TEV: Severity level IV |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.21 |
Inspectors (proximate) | J Rivera-Ortiz G Ottenberg M Yeminy S Sandal R Nease J Heath N Childs M Riley P Wagner |
INPO aspect | |
' | |
Finding - Hatch - IR 05000321/2012008 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Hatch) @ 2012Q3
Self-Identified List (Hatch)
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||