Finding | |
|---|---|
| Title | Interaction of Non-safety Related Power System with Safety Systems during Bus Transfers |
| Description | An NRC indentified NCV of 10 CFR 50, Appendix B, Criterion III, Design Control, was identified for the failure to properly analyze electrical bus transfers that could adversely affect redundant safety buses. Specifically, the licensee failed to analyze the effects of severe voltage dips on the 4.160 kV safety buses that could occur if a loss of coolant accident occurred coincident with bus transfers that occur during a unit trip. The licensee entered this issue into their corrective action program as CR 2009105775. The licensees failure to properly analyze the effects of severe voltage dips during bus transfers was a performance deficiency. The finding was more than minor because it was associated with the Design Control attribute of the Mitigating System Cornerstone and affected the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the licensee failed to properly analyze the effects of voltage dips that could occur following the transfer of the non-safety bus to the transformer supplying power to redundant safety-related buses during LOCA block loading. The finding was assessed for significance in accordance with NRC Manual Chapter 0609, a Phase III analysis was required since this finding represented a potential loss of safety system function for multiple trains which was not addressed by the Phase II pre-solved tables/worksheets. The regional SRA performed a Phase III analysis for the deficiency. Because the failure of the onsite power system (such as including the turbine/generator tripping scheme) would have to occur concurrent with the loading of large ECCS motors onto safety-related buses in response to an accident the event, the period of vulnerability for the trip is was assumed to be a few seconds. Therefore the likelihood of the event results in a risk very much below the threshold for a colored finding. Because this finding is not related to current licensee performance, no cross cutting aspect was identified. |
| Site: | Hatch |
|---|---|
| Report | IR 05000321/2011002 Section 4OA5 |
| Date counted | Mar 31, 2011 (2011Q1) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | NRC identified |
| Inspection Procedure: | |
| Inspectors (proximate) | S Shaeffer D Jones E Morris D Hardage |
| INPO aspect | |
| ' | |
Finding - Hatch - IR 05000321/2011002 | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Hatch) @ 2011Q1