| Q | CCA | Title |
---|
05000317/FIN-2010005-02 | 2010Q3 | H.12 | Failure to Follow Written Procedures During Calibration of the 1A DG SR Ventilation Temperature Controller |
05000317/FIN-2010004-01 | 2010Q3 | H.13 | Untimely Declaration of Notice of Unusual Event |
05000317/FIN-2010004-02 | 2010Q3 | | RCS Pressure Boundary Leakage in Valve Leakoff Line Weld |
05000317/FIN-2010202-01 | 2010Q3 | H.2 | Security |
05000317/FIN-2010005-04 | 2010Q3 | P.3 | Inadequate Corrective Action to Address Equipment Repairs in the Material Processing Facility |
05000317/FIN-2010005-01 | 2010Q3 | P.5 | Inadequate Corrective Actions Associated with Submerged SR Cables |
05000317/FIN-2010005-03 | 2010Q3 | H.7 | Inadequate Functionality Review of 0C Diesel Degraded Condition |
05000317/FIN-2010005-05 | 2010Q3 | | Failure to Perform Testing of PORVs in Accordance with ASME OM Code |
05000317/FIN-2010007-02 | 2010Q4 | | Postulated Sinqle Spurious Operation Results in Both Pressurizer Pilot Operated Relief Valves Openino and Loss of Subcoolinq Marqin for Several Hours |
05000317/FIN-2010007-01 | 2010Q4 | | Postulated Sourious Closure of Volume Control Tank Outlet Valve Results in Loss of Charoinq Pumps |
05000317/FIN-2010007-03 | 2010Q4 | | Postulated Sinole Spurious Operation Adverselv Affects Credited Onsite Power Source for a Control Room Fire Scenario |
05000317/FIN-2011003-01 | 2011Q2 | | Pressure Boundary Leakage Caused by Primary Water Stress Corrosion Cracking |
05000317/FIN-2011404-01 | 2011Q2 | H.5 | Security |