05000312/LER-1982-009, Forwards LER 82-009/01T-0.Detailed Event Analysis Submitted

From kanterella
Jump to navigation Jump to search
Forwards LER 82-009/01T-0.Detailed Event Analysis Submitted
ML20054D258
Person / Time
Site: Rancho Seco
Issue date: 04/13/1982
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20054D259 List:
References
NUDOCS 8204220485
Download: ML20054D258 (4)


LER-1982-009, Forwards LER 82-009/01T-0.Detailed Event Analysis Submitted
Event date:
Report date:
3121982009R00 - NRC Website

text

.

' $SMUD SACRAMENTO MUNICIPAL UTILITY DISTRICT O 6201 S street, Box 15830, Sacramento, California 95813; (916) 452-3211 April 13,1982

<T;/j4; n

C - 4 qqy

9

+

c, R H ENGELKEft, RECIONAL ADf1INISTRATOR

/

'[

REGION V 0FFICE OF INSPECTION & ENF0PCEf1EilT

/4 P

H(

$~

U S flUCLEAR REGULATORY C0f" MISSION

/x]!/

1450 MARIA LANE SUITE 210 j;

WALNUT CREEK CA 95638

\\

< 3,/

-[g $

/ JD(

DOCKET NO. 50-312 LICENSE NO. PPP-54 REPORT /,BLE OCCl!RRE!!CE NO 82-09 In accordance with Rancho Seco Nuclear Generatina Station Technical Specifications sections 6.9.4.1.c and 6.9.4.1.i and Regulatory Guide 1.16 section C.2.a.3 and C.2.a.9, the Sacramento f1unicipal litility District hereby submits the followine 14-day fol'owup to Licentee Event Report number 82-09.

On April 5, 1982, results of radiographic and ultrasonic inspections revealed unacceptable conditions on Hich Pressure Injection Nozzles for the "A" and "B" injection lines. These results are presented in Attachment I (which is a duplicate of the attachment included in our 24-hour notification letter to your office dated Anril 6,1982).

Two Nonconformance Peports were cenerated, one for each nozzle. These reports were then reviewed by the SMUD engineering staff and dispositioned for corrective actions. Attachments II and III provide the corrective actions for the "A" and "B" nozzles, respectively, and give the current status of the repair vork. A followup to this report will be generated at the completion of the repairs.

There were no transients associated with this event nor was plant or public safety affected.

1A v

Johti J. Mattimoe

~,;:7:j Assistant General Manager and Chief Engineer 4 j _,,

' ' ' ' G I i.' l qi cc:

I&E Washington (30)

MIPC (3) fi C4!ilan INPO egagWSE413BJ jp cu,,o m y g

.m

--oc m m um o,

a mc-