05000311/LER-1981-098, Forwards LER 81-098/03L-0.Detailed Event Analysis Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 81-098/03L-0.Detailed Event Analysis Encl
ML20031D554
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/30/1981
From: Midura H
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20031D558 List:
References
NUDOCS 8110130432
Download: ML20031D554 (3)


LER-1981-098, Forwards LER 81-098/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3111981098R00 - NRC Website

text

. -..

l&

- O PSEG Public Service Electric and Gas Company P.O. Box 168 Hancocks Bridge, New Jerse/ 08038 Salem Generating Ste br, September 30, 1981 Mr.

R.

C. Haynes Q\\

N 7"

4 Director of USNRC Office of Inspection and Enforcement

[

j{

Region 1 631 Park Avenue 00{ 9 1981 > L King of Prussia, Pennsylvania 19406 u.s. wxun naAA" a D y/

cowusson

Dear Mr. Haynes:

'/r p

LICENSE NO. DPR-75 m

DOCKET NO. 50-311 REPORTABLE OCCURRENCE 81-98/03L Pursuant to the requirements of Salem Generating Station Unit No.

2, Technical Speci#2 cations, Section 6.9.1.9.b, we are submitting Licensee Event Report for Aeportable Occurrence 81-98/03L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours, l

f d. J. Midura Manager - Salem Generating Station CC:

R. A. Uderitz General Manager - Nuclear Production Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and Program Control (3 copies) fh

/ l E110130432 810930 L

PDR ADOCK 05000311 S

PDR The Energy People 9s2is9 02.sw uso

i Report Number:

81-98/03L Report Date:

9-30-81 4

Occurrence Date:

9-1-81 Facility:

Salem Generating Station, Unit 2 Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Individual Rod Position Indications - 1D4, 1D3, 2D2, and 2D3 - Inoperable.

This report was initiated by incident report 81-355.

CONDITIONS PRIOR TO OCCURRENCE:

Mode 1 - Rx Power 99% - Unit Load 1020 MWe DESCRIPTION OF OCCURRENCE:

On September 1, 1981, the control operator noticed that the individual rod position indicator (IRPI) and the control rod bank demand indicator for rods 1D4, 1D3, 2D2, and 2D3 were in disagreement by greater than 12 steps.

The IRPIs were declared inoperable at 1635 hours0.0189 days <br />0.454 hours <br />0.0027 weeks <br />6.221175e-4 months <br /> and action statement 3.1.3.1.b was entered.

This occurrence constituted operation in a degraded mcde in accordance with technical specification 6.9.1.9.b.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

The IRPIs had drifted out of calibration.

ANALYSIS _Or' OCCURRENCE:

Technical specification 3.1.3.1.b requires:

l With more than one full length rod inoperable or misaligned from the group step counter demand within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

be in hot standby position by more than + 12 steps, CORRECTIVE ACTIOE:

The IRPIs for control rods 1D4, 1D3, 2D2, and 2D3 were recalibrated, tested satisfactorily and returned to service.

At 1715 hours0.0198 days <br />0.476 hours <br />0.00284 weeks <br />6.525575e-4 months <br /> September 1, 1981 action statement 3.1.3.1.b was terminated.

F 4 --'-

Y-

+

- vg-y'

~

w y

w w-v-&we7ew-Tw%v

-=r

- y-
- s%-

y-


e

- w-N-* T 9e+'-

--'---p

LER 81-98/03L.

FAILURE DATA:

Bailey Instrument Co.,

Inc.

Bailey Edgewise Indicator Model RY2 Prepared By F.

Dickey

/e AsO.--

Manqger - Salem ' Generating Station SORC "9eting No.

81-99 l