05000311/LER-1981-085, Forwards LER 81-085/01T-0.Detailed Event Analysis Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 81-085/01T-0.Detailed Event Analysis Encl
ML20010G887
Person / Time
Site: Salem PSEG icon.png
Issue date: 09/14/1981
From: Midura H
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20010G888 List:
References
NUDOCS 8109220628
Download: ML20010G887 (3)


LER-1981-085, Forwards LER 81-085/01T-0.Detailed Event Analysis Encl
Event date:
Report date:
3111981085R00 - NRC Website

text

3 Lt~ f' O PSEG Public Service Electric and Gas Company P.O. Box 168 Hancocks Bridge, New Jersey 08038 Salem Generating Station September 14, 1981

$MQf g

ePg, 'VRN i

(,

m& -,

(

<P, Mr.

R.

C. Haynes W//wh/. gf Director of USNRC Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Haynes:

LICENSE NO. DPR-75 DOCKET NO. 50-311 REPORTABLE OCCURRENCE 81-85/0lT Pursuant to the requirements of Salem Generating Station Unit No.

2, Facility Operating License DPR-75, we are submitting Licensee Event Report for Reportable Occurrence 81-85/0lT.

This report is required within fourteen (14) days of the occurrence.

Sincerely yours, Y.

y H. J. Midura Manager - Salem Generating Station CC:

R. A.

Uderitz General Manager - Nuclear Production Director, Office of Inspection and Enforcement (40 copies)

Director, Office of Management hN Information and Program Control g

(3 copies)

/ /

81092:Id'6'28' 8iO[1T'le n2189 n2m um PDR ADOCK 05000311 S

PDR

f.

Report Number:

81-85/OlT EReport Date:

'-14-81 Occurrence Date:

9-1-81 Facility:

Salem Generating Station, Unit 2 Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCEt Noncompliance With Facility Operating License DPR-75 This report was initiated by Incident Report 81-354.

CONDITIONS PRIOR TO OCCURRENCE:

Mode 1 - Rx Power 90% - Unit Load 980 MWe DESCRIPTION OF OCCURRENCE:

As a result of the NRC's review of our " Cable Interaction, Study",

Conduit 2BDD-B(5") was identified as requiring fire wrap protection.

This item was listed in the NRC's report, tendered May 11, 1981, as table 2, item 4, category 4, criterion 14b, paragraph (a).

- The detailed wrapping was added to DCR 2EC-ll46, revision 15 on July 11, 1981, by the Site Engineer.

The revised document package 6

was forwarded to the Station Planning Engineer the same day via transmittal 359E.

Subsequently, the design information was incorporated into Catalytic work package OP-933.256-2201-3.

The package included wrapping the conduit in question at three different locations.

The diesel fuel oil storage tank room location was inadvertently overlooked.

This occurrence constituted operation in violation of Facility OperatingELicense DPR-75.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

The cause of the noncompliance was that onefout of the three conduit

~

locations designated to be wrapped was[ inadvertently overlooked, and presumed completed.

ANALYSIS OF OCCURRENCE:

Without the required wrapping, a fire in the diesel fuel oil storage tank room could have resulted in the loss of ability to provide electrical power from two of the diesel generators if the redundant Automatic Suppression Systems failed to operate.

[

LER 81-85/0lT. CORRECTIVE ACTION:

A fire watch was immediately established.

At 2100 hours0.0243 days <br />0.583 hours <br />0.00347 weeks <br />7.9905e-4 months <br />, September 1, 1981, the wrapping of Conduit 2BDD-B(5") in the diesel fuel oil storage tank rconi, elevation 84', was completed and signed off to work package specifications.

Subsequently, a complete review of the cable wrapping design change package and other fire protection requirements of the Facility Operating License was conducted, and all required to date license commitments have been met.

FAILURE DATA:

Not Applicable Prepared By F.

Dickey

>__ra-SORC Meeting No.

81-90 I

i i

i l