05000311/LER-1981-083, Forwards LER 81-083/03L-0.Detailed Event Analysis Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 81-083/03L-0.Detailed Event Analysis Encl
ML20010F282
Person / Time
Site: Salem PSEG icon.png
Issue date: 08/28/1981
From: Midura H
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20010F283 List:
References
NUDOCS 8109090561
Download: ML20010F282 (3)


LER-1981-083, Forwards LER 81-083/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3111981083R00 - NRC Website

text

_

j L

O P S E G l

Public Service Electric and Gas Company P.O. Box 168 Hancocks Bridge, New Jersey 08038 Salem Generating Station August 28, 1981 k

Mr. Boyce II. Grier

[/'

Director of USNRC

  1. u/

Office of Inspection and Enforcement

'E f*

o c, O s yg *,A -

Region 1

- i g,

c 631 Park Avenuc d'

/

hc

'* b King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

\\.<ullI N

LICENSE NO. DPR-75 DOCKET NO.30-311 REPORTABLE OCCURRENCE 81-83/03L Pursuant to the requirements of Salem Generating Station Unit No. 2 Technical Specifications, Section 6.9.1.9.b, we are submitting Licensec Event Report for Reportable Occurrence 81-82/03L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours,

[

tt 4 dud H.

J. Midura Manager -

Salem Generating Station CC:

R. A.

Uderitz General Manager - Nuclear Production Director, Office of Inspection and Enforcement (30 copies)

' Director, Office of Management Informat* ion and Program Control (3 copies) f hl 810909 %I g

The Energy People 1

9s 2no n2 sw u so 1

Report Number:

'81-83/03L Report Date:

8-28-81 Occurrence Date:

8-8-81 and 8-9-81 Facility:

Salem Generating Station, Unit 2 Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

100' Elevation Containment Air Lock - Inoperable.

This report was initiated by Incident Reports81-318 and 81-321.

CONDITIONS PRIOR TO OCCURRENCE:

8-8-81 Mode 1 - Rx Power 77% - Unit Load 840 MWe 8-9-81 Mode 1 - Rx Power 75% - Unit Load 810 MWe DESCRIPTION OF OCCURRENCE:

On August 8 and August 9, 1981, while performing surveillance l

procedure SP (O) 4.6.1.3 on the 100 ' elevation containment air lock, i

it was determined that the leakage rate exceeded the limit of 0.05 La l

at the design pressure of 47.0 psig as required by technical specifi-cation 3.6.1.3.b.

At 2015 and 1230 hours0.0142 days <br />0.342 hours <br />0.00203 weeks <br />4.68015e-4 months <br />, on August 8 and August 9, respectively, the air lock was declared inoperable and action state-ment 3.6.1.3 was entered.

l l

These occurrences constituted operation in a degraded mode in accordance l

with technical specification 6.9.1.9.b.

l l

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

On August 8, it was determined that the outer door seal had come out of its channel, and was leaking.

On August 9, it was discovered that-a door cam roller had moved off its l

track, prever. ting a proper seal.

l ANALYSIS OF OCCURRENCE:

Technical specification 3.6.1.3 requires:

With an air lock inoperable, restore the air lock to operable status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, or be in at leesh hot standby within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and in cold shutdown within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

~

r

LER-83/03L -

CORRECTIVE ACTION

On-August 8, the door seal was repaired and tested' satisfactorily.

JOn August 9, the door. cam roller was realigned.

The leak rate test was then performed satisfactorily.

At 2030'and 1836 hours0.0213 days <br />0.51 hours <br />0.00304 weeks <br />6.98598e-4 months <br /> on August 8 and: August 9, respectively, action

. statement 3.6.1.3 was terminated.

FAILURE DATA:-

. Containment Air Lock-Chicago Bridge And Iron Company-Cam Rollers Smith Bearing Division-PN:.CR-lX Prepared By-F.-Dickey

/

M

(

Manager - Sdlem Generating Station SORC: Meeting No.