05000311/LER-1981-022, Forwards LER 81-022/03L-0.Detailed Event Analysis Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 81-022/03L-0.Detailed Event Analysis Encl
ML20005B116
Person / Time
Site: Salem PSEG icon.png
Issue date: 06/19/1981
From: Uderitz R
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20005B117 List:
References
NUDOCS 8107060328
Download: ML20005B116 (2)


LER-1981-022, Forwards LER 81-022/03L-0.Detailed Event Analysis Encl
Event date:
Report date:
3111981022R00 - NRC Website

text

-

PSEG PutSc Serwce E!cctric and ras Company 80 Park Plaza Newar k, N.J. 07101 Phone 201/430-7000 i

June 19, 1981 Mr. Boyce H. Grier Director of USNRC Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

LICENSE NO. DPR-75 DOCKET NO. 50-311 REPORTABLE OCCURRENCE 81-22/03L Pursuant to the requirements of Salem Generating Station Unit No. 2 Technical Specifications, Section 6.9.1.9.b, we are submitting Licensee Event Report for Reportable Occurrence 81-22/03L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours, b b dfh' R.

A. Uderlt General Manager -

Nuclear Production CC:

Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and Program Control (3 copies) e 8107060328 810619 PDR ADOCK 05000311 S

!PDR

(

3

- n

PSIEG

=

Public Serv'ce Eleuric and Gas Company 80 Park Plaza Newark, N.J. 07101 Phone 201/430 7000 June 19, 1961 Mr. Boyce H. Grier Director of USNRC Office of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

LICENSE NO. DPR-75 DOCKET NO. 50-311 REPORTABLE OCCURRENCE 81-22/03L Pursuant to the requirements of Salem Generating Station Unit No. 2 Technical Specifications, Section 6.9.1.9.b, we are submitting Licensec Event Report for Reportable Occurrence 81-22/03L.

This report is required within thirty (30) days of the occurrence.

Sincerely yours, khd Y

R. A. Uderitt General Manager -

Nuclear Production Mr CC:

Director, Office of Inspection and Enforcement (30 copies)

Director, Office of Management Information and Program Control (3 copies)

Tne Enercp People s w.w ae

Report Number 81-22/03L Report Da*.e:

June 19, 1981 Occurrence Date:

5-20-81 Facility:

Salem Generating Station, Unit 2 Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Movable Control Assemblies - Rod 2D4 Dropped CONDITIONS PRIOR TO OCCURRENCE:

Mode 2 - Rx Power 0% - Unit Load 0 MW DESCRIPTION OF OCCURRENCE:

Action Statement 3.1.3.lc was entered at 0840 on May 20, 1981 when Rod 2D4 dropped.

Emergency Instruction I.4.8 - Rod Control System Malfunction Part IV DropDed Rod - was performed unsuccessfully.

At 0940 a manual Reactor Trip was initiated.

This occurrence constituted operation in a degraded mode IAW Technical Specification 6.9.1.9.b.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

Equipment failure.

Subsequent investigation disclosed an open circuit in the CRDM connector at the reactor vessel head.

The connector pin failed due to corrosion within the connector.

A random sampling of ceveral other connectors disclosed no other cases of corrosion.

ANALYSIS OF OCCURRENCE:

Technical Specification 3.1.3.lc requires that with one full length rod inopetable or misaligned from the group step counter demand height by more than i 12 steps (indicated position), power operation may continue provided that within one hour the rod is restored to operable status Uithin the alignment requirements.

CORRECTIVE ACTION

The connector pin that had failed was replaced in kind and a functional test was performed satisfactorily.

Action Statement 3.1.3.lc was terminated at 0940 hours0.0109 days <br />0.261 hours <br />0.00155 weeks <br />3.5767e-4 months <br /> on May 20, 1981.

FAILURE DATA:

Crouse - Hinds Connector pin was replaced in kind.

Prepared By J. J.

Espey

)I/ h

<w Manager - S61em' Generating Station SORC Meeting No.

81-50 l