05000311/LER-1981-014, Forwards LER 81-014/01T-0.Detailed Event Analysis Encl

From kanterella
Jump to navigation Jump to search
Forwards LER 81-014/01T-0.Detailed Event Analysis Encl
ML18086A548
Person / Time
Site: Salem PSEG icon.png
Issue date: 05/18/1981
From: Uderitz R
Public Service Enterprise Group
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML18086A549 List:
References
NUDOCS 8105270333
Download: ML18086A548 (3)


LER-1981-014, Forwards LER 81-014/01T-0.Detailed Event Analysis Encl
Event date:
Report date:
3111981014R00 - NRC Website

text

PS~G Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 Phone 201/430-7000 Mr. Boyce H. Grier Director of USNRC May 18, 1981 Off ice of Inspection and Enforcement Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

LICENSE NO. DPR-75 DOCKET NO. 50-311 REPORTABLE OCCURRENCE 81-14/0lT Pursuant to the requirements of Salem Generating Station Unit No. 2 Technical Specifications, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 81-14/0lT.

This report is required within fourteen (14) days of the occurrence.

Sincerely yours,

/1'&24-~

R. A. Uderit'.z General Manager -

Nuclear Production CC:

Director, Office of Inspection and Enforcement (40 copies)

Director, Office of Management Information and Program Control (3 copies)

The Energy People 95-2001 1350Ml 4-80*

e e

OPS~G

~

Public Service Electric and Gas Company 80 Park Plaza Newark, N.J. 07101 Phone 201/430-7000 Mr. Boyce H. Grier Director of USNRC May 18, 1981 Off ice of Inspection and Enforcement Region 1 631.Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Grier:

LICENSE NO. DPR-75 DOCKET NO. 50-311 REPORTABLE OCCURRENCE 81-14/0lT

~

Pursuant to the requirements of Salem Generating Station Unit No. 2 Technical Specifications, Section 6.9.1, we are submitting Licensee Event Report for Reportable Occurrence 81-14/0lT.

This report is required within fourteen (14) days of the occurrence.

Sincerely yours,

  1. .~

~- A. Uderit:?

General Manager -

Nuclear Production j~

CC:

Director, Office of Inspection and.Enforcement (40 copies)

Director, Office of Management Information and Program Control (3 copies)

The Energy People

~--

95-2001 1350Ml 4-8

Report Numb~r:

Report Date:

Occurrence Date:

Facility:

81-14/0lT May 18, 1981.

5/05/81 Salem Generating Station, Unit 2 Public Service Electric & Gas Company Hancocks Bridge, New Jersey 08038 IDENTIFICATION OF OCCURRENCE:

Incorrect Cable Routing (Fire Protection)

CONDITIONS PRIOR TO OCCURRENCE:

Mode 5 -

Rx Power 0% - Unit Load O MW DESCRIPTION OF OCCURRENCE:

Verification of Fire Protection Cable Interaction Analysis dis-covered a power supply cable to the alternate shutdown instrument process rack routed on Elevation 84'.should be on Elevation 64'.

This constituted a reportable incident IAW Technical Specification 6.9.1.8.i.

DESIGNATION OF APPARENT CAUSE OF OCCURRENCE:

Personnel Error -

Design Change Request 2EC-0664, revision 1, incorrectly indicated cable 2ASDAC2-CT to be installed on Elevation 84'

  • ANALYSIS OF OCCURRENCE:

Incorrect routing was not discovered by Public Service Electric and Gas Company during final review of Design Change Package (DCP) 2EC-0664.

This incorrect routing required immediate corrective action to prevent *operation in a manner less conservative than assumed in the safety analysis report.

CORRECTIVE ACTION

DCP lEC-1144 changed the routing of cable 1ASDAC2-CT to comply with the Fire Protection Interaction*Analysis on Unit No. 1.

.2EC-1145 has been revised to*change the cable routing on Unit No. 2.

This rerouting will be completed prior to June 5~ 1981 and a 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> fire watch is being maintained until the work is completed.

FAILURE DATA:

Not Applicable Prepared by:

J. J. Espey SORC Meeting No.

81-39