05000298/LER-2011-004, For Cooper Nuclear Station, Regarding Technical Specification Prohibited Condition for Non-Compliance with LCO 3.0.4
| ML11224A035 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 08/09/2011 |
| From: | Dori Willis Nebraska Public Power District (NPPD) |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NLS2011079 LER 11-004-00 | |
| Download: ML11224A035 (5) | |
| Event date: | |
|---|---|
| Report date: | |
| Reporting criterion: | 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(ix)(A) 10 CFR 50.73(a)(2)(iv)(A), System Actuation 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor 10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat 10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 2982011004R00 - NRC Website | |
text
H Nebraska Public Power District Always there when you need us NLS2011079 August 9, 2011 U.S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555-0001
Subject:
Licensee Event Report No. 2011-004-00 Cooper Nuclear Station, Docket No. 50-298, DPR-46
Dear Sir or Madam:
The purpose of this correspondence is to forward Licensee Event Report 2011-004-00.
Demetrius L. Willis T F General Manager of Plant Operations
/jo Attachment cc:
Regional Administrator w/attachment USNRC - Region IV Cooper Project Manager w/attachment USNRC - NRR Project Directorate IV-1 Senior Resident Inspector w/attachment USNRC - CNS SRAB Administrator w/attachment NPG Distribution w/attachment INPO Records Center w/attachment SORC Chairman w/attachment CNS Records w/attachment COOPER NUCLEAR STATION P.O. Box 98 / Brownville, NE 68321-0098 Telephone: (402) 825-3811 / Fax: (402) 825-5211 www.nppd.com
NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0104 EXPIRES 10/31/2013 (10-2010)
Estimated burden per response to comply with this mandatory information collection request: 80 hrs. Reported lessons learned are incorporated into the licensing process and fed back to industry.
Send comments regarding burden estimate to the FOIA/Privacy Service Branch (T-5 F53), U.S. Nuclear Regulatory Commission, LICENSEE EVENT REPORT (LER)
Washington. DC 20555-0001, or by internet e-mail to infocollects.resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs NEOB-10202, (See reverse for required number of (3150-0104), Office of Management and Budget, Washington, DC 20503. If a means digits/characters for each block) used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
- 3. PAGE Cooper Nuclear Station 05000298 1 of 3
- 4. TITLE Technical Specification Prohibited Condition for Non-Compliance with LCO 3.0.4
- 5. EVENT DATE
- 6. LER NUMBER
- 7. REPORT DATE
- 8. OTHER FACILITIES INVOLVED I
IFACILITY NAME DOCKET NUMBER MONTHI DAY YEAR YEAR SEQUENTIAL REV MONTH DAY YEAR I
NUMBER NO.
05000 06 13i 2011 2011
- - 04 00 08 09 2011 FACILITY NAME DOCKET NUMBER t_
_05000
- 9. OPERATING MODE
- 11. THIS REPORT IS SUBMITTED PURSUANT TO THE REOUIREMENTS OF 10 CFR 6: (,heck all that anniv) 1 El 20.2201(b)
[E 20.2203(a)(3)(i)
[E 50.73(a)(2)(i)(C)
El 50.73(a)(2)(vii) 0l 20.2201(d)
[E 20.2203(a)(3)(ii)
[E 50.73(a)(2)(ii)(A)
El 50.73(a)(2)(viii)(A)
El 20.2203(a)(1)
[] 20.2203(a)(4)
[] 50.73(a)(2)(ii)(B)
El 50.73(a)(2)(viii)(B)
El 20.2203(a)(2)(i)
El 50.36(c)(1)(i)(A)
El 50.73(a)(2)(iii)
[j 50.73(a)(2)(ix)(A)
El 20.2203(a)(2)(ii)
El 50.36(c)(1)(ii)(A)
El 50.73(a)(2)(iv)(A)
E3 50.73(a)(2)(x)
- 10. POWER LEVEL El 20.2203(a)(2)(iii)
El 50.36(c)(2)
El 50.73(a)(2)(v)(A)
El 73.71(a)(4) 100 [C 20.2203(a)(2)(iv)
Cl 50.46(a)(3)(ii)
El 50.73(a)(2)(v)(B)
El 73.71(a)(5)
[] 20.2203(a)(2)(v)
[E 50.73(a)(2)(i)(A)
El 50.73(a)(2)(v)(C)
El OTHER El 20.2203(a)(2)(vi)
Z 50.73(a)(2)(i)(B)
El 50.73(a)(2)(v)(D)
Specify in Abstract below or in PLANT STATUS Cooper Nuclear Station (CNS) was in Mode 1, Power Operation, 100% power, at the time of discovery.
BACKGROUND Emergency Core Cooling Systems (ECCS) [EIIS:BJ, BM, BO] are designed to limit fuel clad temperature over the complete spectrum of possible break sizes in the reactor coolant pressure boundary including the design basis break which is defined as the complete and instantaneous circumferential rupture of the largest pipe connected to the reactor vessel with displacement of the ends so that blowdown occurs from both ends.
The Low Pressure Coolant Injection (LPCI) [EIIS:BO] system is one of four systems that make up the ECCS. LPCI provides protection to the core for the case of a large break in the reactor coolant pressure boundary when level cannot be maintained and reactor vessel rapidly depressurizes. Protection extends to a small break in which the High Pressure Coolant Injection [EIIS:BJ] system is unable to maintain reactor water level and the Automatic Depressurization System [EIIS:RV] has operated to lower reactor vessel pressure. LPCI is one operational Mode of the Residual Heat Removal (RHR) [EIIS:BO] system.
The RHR system provides core cooling, in conjunction with other ECCS sub-systems and also provides containment cooling as required during abnormal operational transients and postulated accidents.
EVENT DESCRIPTION
During Refueling Outage 26 (RE26), at 20:42 Central Daylight Time (CDT) on May 7, 2011, RHR LPCI "B" was declared inoperable for Suppression Pool Cooling and torus water transfer.
As a result, Technical Specification (TS) Limiting Condition for Operation (LCO) 3.5.1, ECCS -
Operating, Condition A, was entered.
On May 8, 2011, the reactor mode switch was placed in "RUN" and Mode 1 was entered at 12:30 CDT.
On May 9, 2011, RHR LPCI "B" was declared operable at 00:33 CDT, and TS LCO 3.5.1, Condition A, was exited.
On June 13, 2011, while reviewing a post Refueling Outage 26 (RE26) report, it was discovered that TS LCO 3.0.4.b was not complied with during startup from RE26, in that a risk assessment was not performed prior to entering Mode 1.
TS LCO 3.0.4.b states, in part, "When an LCO is not met, entry into a MODE or other specified condition in the Applicability shall only be made:..... b. After performance of a risk assessment addressing inoperable systems and components, consideration of the results,
determination of the acceptability of entering the MODE or other specified condition in the Applicability, and establishment of risk management actions, if appropriate;......
After identifying the condition, verification was made that RHR LPCI "B" subsystem was operating in Suppression Pool Cooling Mode at the time of Mode change.
As an interim action, a standing order was created that directs reviewing tracking systems to ensure that no conditions preventing entry into the desired Mode or condition exists.
An extent of condition review was performed of startups from previous outages for similar events. One event was discovered during startup from RE23, on November 22, 2006, in which Mode 1 was entered while RHR LPCI "B" was inoperable and aligned with Suppression Pool Cooling. Although the current risk evaluation requirement did not exist at that time, TS LCO 3.0.4 did not allow transitioning into a Mode or other specified condition without meeting the applicable LCOs.
BASIS FOR REPORT This event is being reported as an operation or condition prohibited by plant TS per 10 CFR 50.73(a)(2)(i)(B).
SAFETY SIGNIFICANCE
The overall risk significance of this event is low. The RHR "B" system was operating in Suppression Pool Cooling Mode and capable of being realigned to LPCI Mode if required.
Although the LPCI Mode of RHR was considered inoperable, components aligned for Suppression Pool Cooling automatically re-align to LPCI upon receipt of a LPCI initiation signal.
In addition, the RHR "A" system was available to perform its design function. Consequently, the safety significance is negligible.
CAUSE
CNS determined the root cause to be a deficient procedure that does not prompt operations to review all methods of LCO tracking to ensure that LPCI system LCOs related to Suppression Pool Cooling activities are closed prior to changing from Mode 2 to Mode 1.
CORRECTIVE ACTION
To prevent recurrence of this event, CNS will revise the applicable procedure to prompt operations to check all LCO tracking methods for open LCOs prior to transitioning from Mode 2 to Mode 1.
PREVIOUS EVENTS There have been no events reported in the last 3 years related to non-compliance with TS LCO 3.0.4 during plant startups from outages.
ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS ATTACHMENT 3 LIST OF REGULATORY COMMITMENTS©4 Correspondence Number: NLS2011079 The following table identifies those actions committed to by Nebraska Public Power District (NPPD) in this document. Any other actions discussed in the submittal represent intended or planned actions by NPPD. They are described for information only and are not regulatory
commitments
Please notify the Licensing Manager at Cooper Nuclear Station of any questions regarding this document or any associated regulatory commitments.
COMMITMENT
COMMITTED DATE
COMMITMENT
NUMBER OR OUTAGE None 4
4 I
4 I
4 I
4 1
4 v
L _____________________
.1.
I PROCEDURE 0.42 REVISION 27 PAGE 18 OF 25 1