Automatic Reactor Scram Due to Main Generator Load Reject
ML080600166
Person / Time
Site: Browns Ferry Tennessee Valley Authority icon.png
Issue date: 02/27/2008
From: Douglas S
Tennessee Valley Authority
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
LER 07-005-00
Download: ML080600166 (8)


LER-2007-005, Automatic Reactor Scram Due to Main Generator Load Reject
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications

10 CFR 50.73(a)(2)(i)

10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded

10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition

10 CFR 50.73(a)(2)(iii)

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(viii)(A)

10 CFR 50.73(a)(2)(viii)(B)

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(x)
2962007005R00 - NRC Website

text

February 27, 2008 U.S. Nuclear Regulatory Commission 10 CFR 50.73 ATTN: Document Control Desk Mail Stop: OWFN, P1-35 Washington, D. C. 20555-0001

Dear Sir:

TENNESSEE VALLEY AUTHORITY - BROWNS FERRY NUCLEAR PLANT (BFN) - UNIT 3 - DOCKET 50-296 - FACILITY OPERATING LICENSE DPR LICENSEE EVENT REPORT (LER) 50-296/2007-005-00 The enclosed report provides details of an automatic reactor scram due to a generator load reject. TVA is submitting this report in accordance with 10 CFR 50.73(a)(2)(iv)(A), as an event that resulted in an automatic actuation of the systems listed in paragraph (a)(2)(iv)(B) (i.e., Reactor Protection System including: reactor scram or reactor trip. There are no commitments contained in this letter.

Sincerely, Original signed by:

S. M. Douglas, Interim Site Vice President, BFN cc: See page 2

U.S. Nuclear Regulatory Commission Page 2 February 27, 2008 Enclosure cc (Enclosure):

Ms. Eva A. Brown, Project Manager U.S. Nuclear Regulatory Commission (MS 08G9)

One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 Branch Chief U.S. Nuclear Regulatory Commission Region II Sam Nunn Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303-8931 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road Athens, Alabama 35611-6970

U.S. Nuclear Regulatory Commission Page 3 February 27, 2008 DTL:JEE:SWA:BAB Enclosure cc (Enclosure):

G. P. Arent, EQB 1B-WBN W. R. Campbell, LP 3R-C S. M. Douglas, POB 2C-BFN D. C. Matherly, Jr., BFT 2A-BFN R. F. Marks, Jr., PAB 1C-BFN L. E. Nicholson, BR 4X-C B. A. Wetzel, BR 4X-C S. A. Vance, WT 6A-K E. J. Vigluicci, ET 11A-K INPO:LEREvents@inpo.org EDMS WT CA - K S:lic/submit/LERs/296-2007-005 Reactor Scram.doc

NRC FORM 366 (9-2007)

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION (9-2007)

LICENSEE EVENT REPORT (LER)

(See reverse for required number of digits/characters for each block)

APPROVED BY OMB NO. 3150-0104 EXPIRES 08/31/2010

, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

1. FACILITY NAME Browns Ferry Unit 1
2. DOCKET NUMBER 05000296
3. PAGE 1 of 5
4. TITLE:

Automatic Reactor Scram Due To Main Generator Load Reject

5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED MONTH DAY YEAR YEAR SEQUENTIAL NUMBER REV NO.

MONTH DAY YEAR FACILITY NAME None DOCKET NUMBER N/A 12 31 2007 2007 - 005 - 00 02 27 2008 FACILITY NAME None DOCKET NUMBER N/A

9. OPERATING MODE
11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) 1
10. POWER LEVEL 100 20.2201(b) 20.2201(d) 20.2203(a)(1) 20.2203(a)(2)(i) 20.2203(a)(2)(ii) 20.2203(a)(2)(iii) 20.2203(a)(2)(iv) 20.2203(a)(2)(v) 20.2203(a)(2)(vi) 20.2203(a)(3)(i) 20.2203(a)(3)(ii) 20.2203(a)(4) 50.36(c)(1)(i)(A) 50.36(c)(1)(ii)(A) 50.36(c)(2) 50.46(a)(3)(ii) 50.73(a)(2)(i)(A) 50.73(a)(2)(i)(B) 50.73(a)(2)(i)(C) 50.73(a)(2)(ii)(A) 50.73(a)(2)(ii)(B) 50.73(a)(2)(iii) 50.73(a)(2)(iv)(A) 50.73(a)(2)(v)(A) 50.73(a)(2)(v)(B) 50.73(a)(2)(v)(C) 50.73(a)(2)(v)(D) 50.73(a)(2)(vii) 50.73(a)(2)(viii)(A) 50.73(a)(2)(viii)(B) 50.73(a)(2)(ix)(A) 50.73(a)(2)(x) 73.71(a)(4) 73.71(a)(5)

OTHER Specify in Abstract below or in (If more space is required, use additional copies of (If more space is required, use additional copies of (If more space is required, use additional copies of NRC Form 366A) (17) (1) TVA does not consider the corrective actions regulatory requirements. The completion of the actions will be tracked in TVA's Corrective Action Program.

C.

Additional Information

Corrective action document for this report is PER 135878.

D.

Safety System Functional Failure Consideration:

This event did not involve a safety system functional failure according to NEI 99-02.

E.

Scram With Complications Consideration:

This event was not a complicated scram according to NEI 99-02.

VIII. COMMITMENTS

None.