| | | Reporting criterion |
|---|
| 05000296/LER-1982-001, Forwards LER 82-001/03L-0 | Forwards LER 82-001/03L-0 | |
| 05000259/LER-1982-001, Forwards LER 82-001/03L-0 | Forwards LER 82-001/03L-0 | |
| 05000259/LER-1982-001-03, /03L-0:on 820103,meteorological Instrumentation O-Tdr-90-103 Air Temp Delta T & O-XR-90-102-1 (30 Ft Air Speed) Failed.Caused by Lightning Damage to Transistors Q3 & Q4 & Blown Fuses in Panel 9-34 & at Meterological Station | /03L-0:on 820103,meteorological Instrumentation O-Tdr-90-103 Air Temp Delta T & O-XR-90-102-1 (30 Ft Air Speed) Failed.Caused by Lightning Damage to Transistors Q3 & Q4 & Blown Fuses in Panel 9-34 & at Meterological Station | |
| 05000260/LER-1982-001, Forwards LER 82-001/01T-0 | Forwards LER 82-001/01T-0 | |
| 05000260/LER-1982-001-01, /01T-0:on 820115,during Offsite Verification of Process Computer Programming Changes Involving Data in Tech Spec Tables 3.5.I-3 & 3.5.I-4,discovered Input Error.Caused by Personnel Error.Personnel Will Be Reinstructed | /01T-0:on 820115,during Offsite Verification of Process Computer Programming Changes Involving Data in Tech Spec Tables 3.5.I-3 & 3.5.I-4,discovered Input Error.Caused by Personnel Error.Personnel Will Be Reinstructed | |
| 05000296/LER-1982-001-03, /03L-0:on 820114,fixed Spray Fire Protection Valve Accidentally Initiated,Causing Smoke Detector to Be Wetted & Emit False Smoke Alarm.Caused by Personnel Hanging Coats on Valve Station.Valve Reset & Smoke Detector Replaced | /03L-0:on 820114,fixed Spray Fire Protection Valve Accidentally Initiated,Causing Smoke Detector to Be Wetted & Emit False Smoke Alarm.Caused by Personnel Hanging Coats on Valve Station.Valve Reset & Smoke Detector Replaced | |
| 05000259/LER-1982-002, Forwards LER 82-002/03L-0 | Forwards LER 82-002/03L-0 | |
| 05000259/LER-1982-002-03, /03L-0:on 820106,drywell High Pressure Switch 1-PS-64-58C Found Isolated.Apparently Caused by Performance of Surveillance Instruction 4.2.B.5.Switch Returned to Normal & All Other Valving Involved Verified Correct | /03L-0:on 820106,drywell High Pressure Switch 1-PS-64-58C Found Isolated.Apparently Caused by Performance of Surveillance Instruction 4.2.B.5.Switch Returned to Normal & All Other Valving Involved Verified Correct | |
| 05000296/LER-1982-002, Forwards LER 82-002/03L-0 | Forwards LER 82-002/03L-0 | |
| 05000296/LER-1982-002-03, /03L-0:on 820121,during Surveillance Test SI 4.11.C.1 & 5 Smoke Detector in Auxiliary Instrument Room 3 Would Not Alarm.Caused by Loose Annunciator Point Card Due to Incorrect Installation of Retainer Bar | /03L-0:on 820121,during Surveillance Test SI 4.11.C.1 & 5 Smoke Detector in Auxiliary Instrument Room 3 Would Not Alarm.Caused by Loose Annunciator Point Card Due to Incorrect Installation of Retainer Bar | |
| 05000260/LER-1982-002-03, /03L-0:on 820116,during Reduced Load While Performing MSIV Closure Si,Scram Trip Logic Az Annunciation Failed to Alarm.Caused by Failure of Limit Switch 4 of FCV-1-52 to Open.Switch Will Be Replaced | /03L-0:on 820116,during Reduced Load While Performing MSIV Closure Si,Scram Trip Logic Az Annunciation Failed to Alarm.Caused by Failure of Limit Switch 4 of FCV-1-52 to Open.Switch Will Be Replaced | |
| 05000260/LER-1982-002, Forwards LER 82-002/03L-0 | Forwards LER 82-002/03L-0 | |
| 05000260/LER-1982-003-03, /03L-0:on 820116,during Normal Operation,While Performing Surveillance test,PS-3-74A Switch 1 & PS-68-96 Switch 1,low Pressure Switches,Were Out of Tolerance by 4% & 6%.Caused by Instrument Drift.Switches Recalibr | /03L-0:on 820116,during Normal Operation,While Performing Surveillance test,PS-3-74A Switch 1 & PS-68-96 Switch 1,low Pressure Switches,Were Out of Tolerance by 4% & 6%.Caused by Instrument Drift.Switches Recalibr | |
| 05000260/LER-1982-003, Forwards LER 82-003/03L-0 | Forwards LER 82-003/03L-0 | |
| 05000296/LER-1982-003-03, /03L-0:on 820123,during Refueling Outage,While Performing SI 4.2.A-39,temp Switches TS-69-30A,B,C & E on Reactor Cleanup Sys Floor Drain High Temp,Operated at Less than 160 F.Caused by Improper Calibr or Instrument Drift | /03L-0:on 820123,during Refueling Outage,While Performing SI 4.2.A-39,temp Switches TS-69-30A,B,C & E on Reactor Cleanup Sys Floor Drain High Temp,Operated at Less than 160 F.Caused by Improper Calibr or Instrument Drift | |
| 05000296/LER-1982-003, Forwards LER 82-003/03L-0 | Forwards LER 82-003/03L-0 | |
| 05000296/LER-1982-004, Forwards LER 82-004/03L-0 | Forwards LER 82-004/03L-0 | |
| 05000296/LER-1982-004-03, /03L-0:on 820207,while Performing Surveillance Instruction,Temp Switches 3S-TS-73-2A & 3-TS-73-2B Operated Above Tech Specs Limit.Caused by Switches Being Out of Calibr.Switches Calibr | /03L-0:on 820207,while Performing Surveillance Instruction,Temp Switches 3S-TS-73-2A & 3-TS-73-2B Operated Above Tech Specs Limit.Caused by Switches Being Out of Calibr.Switches Calibr | |
| 05000296/LER-1982-005, Forwards LER 82-005/03L-0 | Forwards LER 82-005/03L-0 | |
| 05000259/LER-1982-005, Forwards Updated LER 82-005/03X-1 | Forwards Updated LER 82-005/03X-1 | |
| 05000260/LER-1982-006, Forwards LER 82-006/03L-0 | Forwards LER 82-006/03L-0 | |
| 05000260/LER-1982-006-03, /03L-0:on 820125,while Performing SI 4.1.A-7,low Water Level Switch LIS-3-203B,switch 1 Found 3% Out of Tolerance.Caused by Setpoint Drift.Switch Recalibr | /03L-0:on 820125,while Performing SI 4.1.A-7,low Water Level Switch LIS-3-203B,switch 1 Found 3% Out of Tolerance.Caused by Setpoint Drift.Switch Recalibr | |
| 05000259/LER-1982-006, Forwards LER 82-006/03L-0 | Forwards LER 82-006/03L-0 | |
| 05000259/LER-1982-006-03, /03L-0:on 820112,1-PS-3-74B Switch Number 1 Found Operating Below Tech Spec Limit.Caused by Instrument Drift. Barton Model 288 Pressure Switch Recalibr.Action Plan Re Design Change Will Be Forwarded | /03L-0:on 820112,1-PS-3-74B Switch Number 1 Found Operating Below Tech Spec Limit.Caused by Instrument Drift. Barton Model 288 Pressure Switch Recalibr.Action Plan Re Design Change Will Be Forwarded | |
| 05000296/LER-1982-007-03, /03X-1:on 820318,ice Storm Caused Loss of Offsite Power to 4-kV bus-tie Board.Caused by Interruption of Power to Cooling Tower Transformers & 4-kV Switchgear Feeding bus-tie Board Due to Loss of 161-kV Lines | /03X-1:on 820318,ice Storm Caused Loss of Offsite Power to 4-kV bus-tie Board.Caused by Interruption of Power to Cooling Tower Transformers & 4-kV Switchgear Feeding bus-tie Board Due to Loss of 161-kV Lines | |
| 05000260/LER-1982-007-03, /03L-0:on 820126,while Performing SI 4.2.A-3, Reactor low-water Level Switch Lis-3-56A Switch Number 2 Was Found 8% Out of Tolerance.Caused by Setpoint Drift.Yarway Model 4418c Switch Recalibr & Functionally Tested | /03L-0:on 820126,while Performing SI 4.2.A-3, Reactor low-water Level Switch Lis-3-56A Switch Number 2 Was Found 8% Out of Tolerance.Caused by Setpoint Drift.Yarway Model 4418c Switch Recalibr & Functionally Tested | |
| 05000260/LER-1982-007, Forwards LER 82-007/03L-0 | Forwards LER 82-007/03L-0 | |
| 05000296/LER-1982-007, Forwards LER 82-007/03X-1 | Forwards LER 82-007/03X-1 | |
| 05000259/LER-1982-007, Forwards LER 82-007/03L-0 | Forwards LER 82-007/03L-0 | |
| 05000259/LER-1982-007-03, /03L-0:on 820113,XR-90-104 Lost Indication for Wind Direction & Wind Speed Channel C,Elevation 887 Msl. Caused by Anemometer & Vane Icing Due to Inclement Weather. Anemometer & Vane Allowed to Thaw | /03L-0:on 820113,XR-90-104 Lost Indication for Wind Direction & Wind Speed Channel C,Elevation 887 Msl. Caused by Anemometer & Vane Icing Due to Inclement Weather. Anemometer & Vane Allowed to Thaw | |
| 05000259/LER-1982-008, Forwards LER 82-008/03L-0 | Forwards LER 82-008/03L-0 | |
| 05000296/LER-1982-008, Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | Forwards LER 82-008/03L-0.Detailed Event Analysis Encl | |
| 05000259/LER-1982-008-03, /03L-0:on 820116,CAM 1-90-250 (Refuel Floor) Rendered Inoperable Due to Broken Drive Belt.Caused by Normal Wear Due to Continuous Operation.Std V-belt for Schwitzer Model 325 Series Air Pump Replaced | /03L-0:on 820116,CAM 1-90-250 (Refuel Floor) Rendered Inoperable Due to Broken Drive Belt.Caused by Normal Wear Due to Continuous Operation.Std V-belt for Schwitzer Model 325 Series Air Pump Replaced | |
| 05000296/LER-1982-008-03, /03L-0:on 820331,while Performing Daily Source & Background Check of CAM-390-250,reactor & Turbine Bldg Vent Monitor,Inlet Sample Line Discovered Disconnected.Caused by Personnel Error.Sample Lines Reconnected | /03L-0:on 820331,while Performing Daily Source & Background Check of CAM-390-250,reactor & Turbine Bldg Vent Monitor,Inlet Sample Line Discovered Disconnected.Caused by Personnel Error.Sample Lines Reconnected | |
| 05000260/LER-1982-008-03, /03L-0:on 820127,after Calibr,Rod Block Monitor Channel B Failed to Pass Functional Test of SI 4.2.C-2. Caused by Electronic IC Failure Possibly Due to Voltage Spike During Calibr.Ge 136B1333G1 Gain Change Card Replaced | /03L-0:on 820127,after Calibr,Rod Block Monitor Channel B Failed to Pass Functional Test of SI 4.2.C-2. Caused by Electronic IC Failure Possibly Due to Voltage Spike During Calibr.Ge 136B1333G1 Gain Change Card Replaced | |
| 05000260/LER-1982-008, Forwards LER 82-008/03L-0 | Forwards LER 82-008/03L-0 | |
| 05000259/LER-1982-009-03, /03L-0:on 820117,during Normal Operation,Smoke Detector in Relay Room Alarmed & Would Not Clear.Caused by Increased Detector Sensitivity Due to Natural Aging.Kidde FT-200 Ionization Smoke Detector Replaced | /03L-0:on 820117,during Normal Operation,Smoke Detector in Relay Room Alarmed & Would Not Clear.Caused by Increased Detector Sensitivity Due to Natural Aging.Kidde FT-200 Ionization Smoke Detector Replaced | |
| 05000259/LER-1982-009, Forwards LER 82-009/03L-0 | Forwards LER 82-009/03L-0 | |
| 05000296/LER-1982-009-03, /03L-0:on 820407,during Refueling Outage,While Performing SI 4.2.A.6,pressure Switches 3-PS-1-76 & 3-PS-1-82 Had as-found Setpoints of 815.7 Psig & 813.7 Psig, Respectively.Caused by Setpoint Drift.Switches Recalibr | /03L-0:on 820407,during Refueling Outage,While Performing SI 4.2.A.6,pressure Switches 3-PS-1-76 & 3-PS-1-82 Had as-found Setpoints of 815.7 Psig & 813.7 Psig, Respectively.Caused by Setpoint Drift.Switches Recalibr | |
| 05000296/LER-1982-009, Forwards LER 82-009/03L-0 | Forwards LER 82-009/03L-0 | |
| 05000259/LER-1982-010-03, /03L-0:on 820112,stack Monitor Was Declared Inoperable After Low Flow Alarm.Caused by 6 Ft Segment of Sample Line Freezing,Inhibiting Sampling Flow to Monitor | /03L-0:on 820112,stack Monitor Was Declared Inoperable After Low Flow Alarm.Caused by 6 Ft Segment of Sample Line Freezing,Inhibiting Sampling Flow to Monitor | |
| 05000259/LER-1982-010, Forwards LER 82-010/03L-0 | Forwards LER 82-010/03L-0 | |
| 05000296/LER-1982-010-03, /03L-0:on 820406,during Refueling & Routine Performance of SI 4.2.F-10,pressure Switch 3-PS-64-67 Had as-found Calibr of 35.5 Psig.Caused by Setpoint Drift.Model 50-560-111AAAC1 Alarm Recalibr | /03L-0:on 820406,during Refueling & Routine Performance of SI 4.2.F-10,pressure Switch 3-PS-64-67 Had as-found Calibr of 35.5 Psig.Caused by Setpoint Drift.Model 50-560-111AAAC1 Alarm Recalibr | |
| 05000296/LER-1982-010, Forwards LER 82-010/03L-0 | Forwards LER 82-010/03L-0 | |
| 05000260/LER-1982-010, Corrected LER 82-010/03L-0 on 811021,during Full Power,Avg Power Range Monitor Output Signal Calibr Was Not Performed within Required Frequency During 811014-28.Caused by Personnel Error.Personnel Instructed to Be More Careful | Corrected LER 82-010/03L-0 on 811021,during Full Power,Avg Power Range Monitor Output Signal Calibr Was Not Performed within Required Frequency During 811014-28.Caused by Personnel Error.Personnel Instructed to Be More Careful | |
| 05000260/LER-1982-010-03, /03L-0:on 820121,during Full Power Operation SI 4.1.B.2 (APRM Output Signal Calibr) Not Performed within Required Frequency During 811014-28.Caused by Personnel Error | /03L-0:on 820121,during Full Power Operation SI 4.1.B.2 (APRM Output Signal Calibr) Not Performed within Required Frequency During 811014-28.Caused by Personnel Error | |
| 05000260/LER-1982-011, Forwards LER 82-011/03L-0 | Forwards LER 82-011/03L-0 | |
| 05000259/LER-1982-011, Forwards LER 82-011/03L-0 | Forwards LER 82-011/03L-0 | |
| 05000296/LER-1982-011, Forwards LER 82-011/01T-0 | Forwards LER 82-011/01T-0 | |
| 05000296/LER-1982-011-01, /01T-0:on 820414,while Performing SI 4.1.A-7 Reactor Protection Sys Water Level Switches 3-LIS-3-203A, 203B & 203D Operated Out of Tech Spec Allowance.Caused by Setpoint Drift | /01T-0:on 820414,while Performing SI 4.1.A-7 Reactor Protection Sys Water Level Switches 3-LIS-3-203A, 203B & 203D Operated Out of Tech Spec Allowance.Caused by Setpoint Drift | |