| Q | CCA | Title |
---|
05000293/FIN-2009004-03 | 2009Q3 | | Failure of the A Standby Liquid Control Train |
05000293/FIN-2009004-01 | 2009Q3 | | Failure to Include Security Diesel Generator into the Maintenance Rule Scoping Document |
05000293/FIN-2009004-02 | 2009Q3 | H.7 | Inadequate Procedures Result in the Failure to Evaluate Operability of the B RBCCW/SSW Heat Exchanger |
05000293/FIN-2009004-04 | 2009Q3 | H.11 H.12 | Human Error Resulting in Unplanned High Pressure Coolant Injection (HPCI) Isolation |
05000293/FIN-2009005-01 | 2009Q4 | | Incomplete licensed operator medical examinations |
05000293/FIN-2009007-01 | 2009Q4 | | Failure to establish adequate procedures to prevent adverse impact due to spurious valve closure casued by fire damage |
05000293/FIN-2009005-03 | 2009Q4 | H.7 | Inadequate Surveillance Procedure Resulting in Failed Standby Liquid Control Train |
05000293/FIN-2009005-02 | 2009Q4 | | Procedure change to allow disabling HPCI during transients |
05000293/FIN-2009403-01 | 2009Q4 | H.5 | Security |
05000293/FIN-2009403-02 | 2009Q4 | P.2 | Security |
05000293/FIN-2010002-01 | 2010Q1 | H.8 | Failure to Implement Operability Determination Process and Temporary Modification Process for Compensatory Measures Required to Maintain Operability of Secondary Containment |
05000293/FIN-2010002-02 | 2010Q1 | P.3 | Inadequate Corrective Actions to Promptly Correct Leaking Snubber Valves on the A Emergency Diesel Generator |
05000293/FIN-2010003-01 | 2010Q2 | P.2 | Submerged Medium Voltage Cables |
05000293/FIN-2010402-01 | 2010Q2 | H.7 | Security |
05000293/FIN-2010402-02 | 2010Q2 | P.5 | Security |