05000293/FIN-2009004-03
Jump to navigation
Jump to search
Site: | Pilgrim |
---|---|
Report | IR 05000293/2009004 Section 1R22 |
Date counted | Sep 30, 2009 (2009Q3) |
Type: | URI: |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.22 |
Inspectors (proximate) | G Johnson D Jackson S Barr B Smith M Schneider D Everhart M Halter S Rich D Moltenie Huangw Raymond R Rolph B Smith M Schneider G Newman S Rich D Jackson |
INPO aspect | |
' | |