05000293/FIN-2010008-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Maintain a Reliable Method for Transporting the SFP External Make-up Strategy Portable Fire Pump and Support Equipment. |
Description | This finding, affecting the Barrier Integrity Cornerstone, is related to mitigative measures developed to cope with losses of large areas of the plant; in response to Section B.5.b. of the February 25, 2002, Interim Compensatory Measures (ICM) Order (EA-02-026) and related NRC guidance. This finding has been designated as \\\"Official Use Only - Security-Related Information;\\\" therefore, the details of this finding are being withheld from public disclosure. This finding has a cross-cutting aspect in the area of Human Performance (Resources). H.2(d). See inspection report for more details. |
Site: | Pilgrim |
---|---|
Report | IR 05000293/2010008 Section 3S01 |
Date counted | Sep 30, 2010 (2010Q3) |
Type: | NCV: Green |
cornerstone | Barrier Integrity |
Identified by: | NRC identified |
Inspection Procedure: | IP 71130.01 |
CCA | H.1, Resources |
INPO aspect | LA.1 |
' | |