| Q | CCA | Title |
---|
05000285/FIN-2009005-01 | 2009Q4 | H.7 | Failure to Provide Adequate Instruction to Pregnant Workers |
05000285/FIN-2009006-02 | 2009Q4 | | Inadequate Flood Protection for the Intake Structure |
05000285/FIN-2009006-01 | 2009Q4 | | Inadequate Assessment of Seismic Qualification of Raw Water Pumps |
05000285/FIN-2009006-05 | 2009Q4 | | Failure to Maintain Quality Records of the Intake Structure Design |
05000285/FIN-2009006-06 | 2009Q4 | | Failure to Update Intake Structure Design |
05000285/FIN-2009006-03 | 2009Q4 | | Failure to Update Flood Protection for Safety Related Buildings |
05000285/FIN-2009006-04 | 2009Q4 | H.14 | Inadequate Corrective Actions to Ensure the Reliability of the Raw Water Pump Power Cables |
05000285/FIN-2010002-01 | 2010Q1 | | Inadequate Reportability Guidance |
05000285/FIN-2010006-01 | 2010Q2 | P.4 | Failure to Correct Repeated Tripping of the Turbine-driven Auxiliary Feedwater Pump FW-10 |
05000285/FIN-2010201-02 | 2010Q2 | H.7 | Security |
05000285/FIN-2010201-01 | 2010Q2 | H.7 | Security |
05000285/FIN-2010003-04 | 2010Q2 | P.5 P.2(a) | Protective Action Recommendation processes allow for the unnecessary evacuation of the Public |
05000285/FIN-2010003-03 | 2010Q2 | H.7 | Failure to Conduct Drills to Maintain Environmental Monitoring Skills |
05000285/FIN-2010003-02 | 2010Q2 | H.9 H.2(b) | Failure to conduct an adequate audit of emergency preparedness interfaces with offiste authorities |
05000285/FIN-2010003-06 | 2010Q2 | | Failure to Perform a Proper 50.59 Evaluation |
05000285/FIN-2010003-01 | 2010Q2 | | Failure to Provide Adequate Limiting Condition for Operation for High River Level |
05000285/FIN-2010003-05 | 2010Q2 | | Failure to Submit a Required Licensee Event Report |
05000285/FIN-2010006-04 | 2010Q2 | H.14 | Turbine-driven Auxiliary Feedwater Pump Trip Due to Inadequate Design Margin |
05000285/FIN-2010006-03 | 2010Q2 | H.14 | Failure to Vent Control Oil Following Maintenance Results in Failure of the Turbine-driven Auxiliary Feedwater Pump to Start |
05000285/FIN-2010006-02 | 2010Q2 | P.5 | Failure to Verify that the Turbine-driven Auxiliary Feedwater Pump Exhaust Backpressure Trip Lever was Fully Latched |
05000285/FIN-2010007-01 | 2010Q2 | P.3 | Failure to Maintain External Flood Procedures |
05000285/FIN-2010004-09 | 2010Q3 | P.5 P.2(b) | Failure To Perform Vendor And Industry Recommended Testing On Safety-Related And Risk Significant 4160 V And 480 V Circuit Breakers |
05000285/FIN-2010004-10 | 2010Q3 | | Inadequate Maintenance Procedure Results in Plant Shutdown |
05000285/FIN-2010004-01 | 2010Q3 | | Inadequate Documentation of the Adequacy of Design for the Pumps that Transfer Fuel Oil from Storage Tank FO-10 to FO-1 |
05000285/FIN-2010004-08 | 2010Q3 | P.2 | Inadequate Maintenance Procedure Results in Water in East Switchgear Room and Room 19 |
05000285/FIN-2010004-07 | 2010Q3 | H.2 | Failure to Properly Plan a Maintenance Activity |
05000285/FIN-2010004-02 | 2010Q3 | | Failure to Submit a Required Licensee Event Report |
05000285/FIN-2010004-06 | 2010Q3 | H.11 H.12 | Failure to Follow Radiation Work Permit Requirements |
05000285/FIN-2010004-04 | 2010Q3 | H.8 | Failure to Translate Calculation into Calibration Procedure |
05000285/FIN-2010004-05 | 2010Q3 | | Failure to Perform a 10 CFR 50.59 Evaluation |
05000285/FIN-2010004-03 | 2010Q3 | | Failure to Update the Updated Safety Analysis Report Solid Waste |