05000275/LER-1982-001, Forwards LER 82-001/03L-0

From kanterella
(Redirected from 05000275/LER-1982-001)
Jump to navigation Jump to search
Forwards LER 82-001/03L-0
ML20041E378
Person / Time
Site: Diablo Canyon Pacific Gas & Electric icon.png
Issue date: 03/01/1982
From: Shiffer J
PACIFIC GAS & ELECTRIC CO.
To: Engelken R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
Shared Package
ML20041E379 List:
References
NUDOCS 8203100447
Download: ML20041E378 (2)


LER-1982-001, Forwards LER 82-001/03L-0
Event date:
Report date:
2751982001R00 - NRC Website

text

.

o.

PAC I F'I C GAS AND E LE C T RIC COMP 1NY

=

IPOW)Es y

77 BE ALE STREET

  • SAN FRANCISCO. CALIFORNI A 94106 (415) 781-42

. TWX d372 658 b

$b $

JAMES D SHIFFER DEPARTMENT OF NUCLE AR PLANT OPERATONS

'P NUCLE AR POWER GENERATCN March 1,1982 g\\)-

h U

i-3 w

N'

..a g

1 WO Jggg,, I~-

fir. R. H. Engelken, Regional Administrator

--d to zw.

Office of Inspection and Enforcement m.y.,

.} -

Region V

-\\

31" b'

a U. S. Nuclear Regulatory Conmission

')

/gZT{4'M 1450 liaria Lane, Suite 210 Walnut Creek, CA 94596 Re:

Docket No. 50-275 License No. DPR-76 Licensee Event Report 82-001/03L-0

Dear fir. Engelken:

Pursuant to Section 6.9.1.13.c of Appendix A of the Technical Specifications to the Diablo Canyon Unit 1 Operating License, the enclosed Licensee Event Report is submitted.

A connunication phone unit was nounted on a Class 1 Hot Shutdown Panel without seismic analysis.

This problem was discovered during a routine audit.

This finding has in no way affected the public safety and health.

Very truly yours, Enclosure l

cc: Mr. Frank J. Miraglia, Jr., Chief Licensing Branch No. 3 Division of Licensing 4Q Office of Nuclear Reactor Regulation J

U. S. Nuclear Regulatory Commission f

i Washington, D. C.

20555 i

Director Office of Management Information and Program Control U. S. Nuclear Regulatory Commission Washington, D. C.

20555 l

Service List

(

8203100447 820301 PDR ADOCK 05000275 l

S PDR

6 i

Item 27 - Departmental procedures will be reviewed to assure proper interface for designs and installations.

=

i I

1