05000275/FIN-2013201-01

From kanterella
Jump to navigation Jump to search
01
Site: Diablo Canyon Pacific Gas & Electric icon.png
Report IR 05000275/2013201 Section 3S01
Date counted Dec 31, 2013 (2013Q4)
Type: NCV: Green
cornerstone Physical Protection
Identified by: NRC identified
Inspection Procedure: IP 71130.01
Violation of: 10 CFR 73, PHYSICAL PROTECTION OF PLANTS AND MATERIALS
CCA H.12, Avoid Complacency
INPO aspect QA.4
'