Finding | |
|---|---|
| Title | Inadvertent Isolation of Service Water to All Edgs in Mode 6 |
| Description | A self-revealing NCV of Technical Specification (TS) 6.8.1, Procedures and Programs, was identified because PSEG personnel did not use the documentation required by site procedures to verify component position during removal of a clearance tagout. As a result, on November 4, 2012, PSEG personnel isolated SW to all emergency diesel generators (EDGs) at Unit 2 while in Mode 6 with fuel movement in progress. As corrective actions, PSEG conducted valve line-up training for field operators and initiated additional field oversight of in-plant activities. The performance deficiency was determined to be more than minor because it affected the configuration control attribute of the Mitigating Systems cornerstone to ensure the availability, reliability and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, a SW valve was incorrectly positioned, isolating all cooling water to the EDGs. The inspectors evaluated the finding using IMC 0609.04, Initial Characterization of Findings, Attachment 1 of IMC 0609, and Appendix G, Shutdown Operations Significance Determination Process Phase 1 Operational Checklists for Both PWRs and BWRs Attachment 4 PWR Refueling Operation: RCS level >23 or PWR Shutdown Operation with Time to Boil >2 hours and Inventory in the Pressurizer. Because no loss of control occurred and all mitigating capabilities were available, a Phase 2 quantitative assessment was not required. Therefore, the inspectors determined the finding to be of very low safety significance (Green). This finding had a cross-cutting aspect in the area of Human Performance, Work Practices, in that PSEG did not effectively communicate human error prevention techniques commensurate with the risk of the assigned task. Specifically, the pre-job brief did not enforce the expectation to contact supervision when an unexpected condition was identified, personnel did not perform self checking prior to component manipulation, and personnel proceeded in the face of uncertainty. |
| Site: | Salem |
|---|---|
| Report | IR 05000272/2013002 Section 4OA3 |
| Date counted | Mar 31, 2013 (2013Q1) |
| Type: | NCV: Green |
| cornerstone | Mitigating Systems |
| Identified by: | Self-revealing |
| Inspection Procedure: | IP 71153 |
| Inspectors (proximate) | S Barr G Dentel J Laughlin R Rolph E Burket P Mckenna E Bonney |
| Violation of: | Technical Specification - Procedures Technical Specification |
| CCA | H.12, Avoid Complacency |
| INPO aspect | QA.4 |
| ' | |