| | Q | CCA | Title |
|---|
| 05000266/FIN-2010010-01 | 2010Q1 | | Inaccurate Information Relating to Signatures on Ignition Control Procedures |
| 05000266/FIN-2010002-04 | 2010Q1 | | Potential Failure to Adequately Assess Risk During CST Modifications |
| 05000266/FIN-2010002-01 | 2010Q1 | H.2(a) H.6 | Untimely Corrective Actions to Address Longstanding Issue of Submerged Cables |
| 05000266/FIN-2010002-07 | 2010Q1 | | Failure to Evaluate Seismic Piping Interactions |
| 05000266/FIN-2010002-06 | 2010Q1 | H.7 | Failure to Establish Required Fire Watches |
| 05000266/FIN-2010002-05 | 2010Q1 | H.10 H.1(c) | Inadequate Communications, Incomplete ALARA Job Planning and Ineffective Implementation of Radiological Work Controls |
| 05000266/FIN-2010002-02 | 2010Q1 | H.13 | Inappropriate Application of A Dedicated Operator During A System Venting Surveillance |
| 05000266/FIN-2010002-03 | 2010Q1 | H.13 H.14 | Failure to Follow Temporary Modification Procedure |
| 05000266/FIN-2010003-02 | 2010Q2 | P.3 | Failure to Control the Design of Partially Installed Modifications for Seismic Requirements |
| 05000266/FIN-2010003-01 | 2010Q2 | H.7 | Failure to Enter Abnormal Operating Procedure During Tornado Warning |
| 05000266/FIN-2010003-06 | 2010Q2 | P.6 P.3(a) | Procedures Were Not Appropriate to Adequately Verify and Document the Design of New or Modified SSCs With Respect to Seismic II/I Interactions |
| 05000266/FIN-2010003-04 | 2010Q2 | | Potential Degradation of Reactor Protection System P-9 Permissive Operability |
| 05000266/FIN-2010003-05 | 2010Q2 | | Unit 2 Battery Inverter Transfers to Nonsafety-Related Power During Unit 1 Testing |
| 05000266/FIN-2010008-02 | 2010Q2 | | Failure to Correctly Install Component Cooling Water Area Sprinkler System |
| 05000266/FIN-2010003-03 | 2010Q2 | H.11 H.12 | Failure to Follow Procedures Needed to Maintain Equipment Operability with Hazard Barriers Out-Of-Service |
| 05000266/FIN-2010008-03 | 2010Q2 | | Appendix R Fire Scenario Resulting in Safe-Shutdown Required Capability Not Maintained |
| 05000266/FIN-2010004-02 | 2010Q3 | H.8 | Inadequate Acceptance Criteria for Fire Door Surveillance Procedure |
| 05000266/FIN-2010004-03 | 2010Q3 | | Failure to Ensure That RHR Would Be Capable to Respond to a LOCA in Mode 4 |
| 05000266/FIN-2010004-01 | 2010Q3 | | Failure to Identify Hydrogen Fire Hazards on Pre-Fire Plan |
| 05000266/FIN-2010005-03 | 2010Q4 | | Failure to Submit LER per 10 CFR 50.73(a)(2)(v)(A) and (D) |
| 05000266/FIN-2010005-08 | 2010Q4 | H.12 | Failure to Follow Power Operation to Hot Standby Procedure |
| 05000266/FIN-2010005-07 | 2010Q4 | P.2 | Failure to Document a 10 CFR 50.59 Evaluation For Changes Made to Procedure OI-38, Circulating Water System Operation |
| 05000266/FIN-2010005-05 | 2010Q4 | | Multiple ESFAS Steam Line Pressure Channel Modules Inoperable Due to Inadequate Calibration Instructions |
| 05000301/FIN-2010005-02 | 2010Q4 | H.2 | Failure to Perform Ultrasonic Assessment of Safety System Voids as Required by Procedure |
| 05000266/FIN-2010005-01 | 2010Q4 | H.13 | Inadequate Safety System Venting Procedure Void Assessment Requirements |
| 05000301/FIN-2010005-04 | 2010Q4 | | High Energy Line Break Barrier Controls |
| 05000266/FIN-2010005-06 | 2010Q4 | P.2 | Failure to Document a 10 CFR 50.59 Evaluation For Changes Made to Procedure OI-38, Circulating Water System Operation |