05000263/LER-2011-009, Regarding Automatic Reactor Scram While Performing Turbine-Generator Testing

From kanterella
Jump to navigation Jump to search
Regarding Automatic Reactor Scram While Performing Turbine-Generator Testing
ML12018A043
Person / Time
Site: Monticello Xcel Energy icon.png
Issue date: 01/17/2012
From: O'Connor T
Xcel Energy, Northern States Power Co
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
L-MT-12-006 LER 11-009-00
Download: ML12018A043 (4)


LER-2011-009, Regarding Automatic Reactor Scram While Performing Turbine-Generator Testing
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(i)

10 CFR 50.73(a)(2)(vii), Common Cause Inoperability

10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded

10 CFR 50.73(a)(2)(viii)(A)

10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition

10 CFR 50.73(a)(2)(viii)(B)

10 CFR 50.73(a)(2)(iii)

10 CFR 50.73(a)(2)(ix)(A)

10 CFR 50.73(a)(2)(iv)(A), System Actuation

10 CFR 50.73(a)(2)(x)

10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor

10 CFR 50.73(a)(2)(v)(B), Loss of Safety Function - Remove Residual Heat

10 CFR 50.73(a)(2)(i)(A), Completion of TS Shutdown

10 CFR 50.73(a)(2)(v), Loss of Safety Function

10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications
2632011009R00 - NRC Website

text

Xcel Energy January 17, 2012 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Monticello Nuclear Generating Plant Docket 50-263 Renewed Facility Operating License No. DPR-22 Monticello Nuclear Generating Plant 2807 W County Road 75 Monticello, MN 55362 L-MT-12-006 10 CFR 50.73 LER 2011-009 "Automatic Reactor Scram While Performing Turbine - Generator Testing" A Licensee Event Report (LER) for this occurrence is attached.

Summary of Commitments This letter contains no new commitments and no revisions to existing commitments.

Enclosure cc:

Regional Administrator, Region III, USNRC Project Manager, Monticello Nuclear Generating Plant, USNRC Resident Inspector, Monticello Nuclear Generating Plant, USNRC

NRC FORM 366 U.S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB NO. 3150-0104 EXPIRES 10/31/2013 (10-2010)

, the NRC may not conduct or sponsor, and a person is no required to respond to, the information collection.

3. PAGE Monticello Nuclear Generating Plant 05000 - 263 1 OF 3
4. III Lt:

Automatic Reactor Scram While Performing Turbine - Generator Testing

5. EVENT DATE
6. LER NUMBER
7. REPORT DATE
8. OTHER FACILITIES INVOLVED YEAR I SEQUENTIAL I REV FACILITY NAME DOCKET NUMBER MONTH DAY YEAR NUMBER NO MONTH DAY YEAR 05000 FACILITY NAME DOCKET NUMBER 11 19 2011 2011 - 009 - 00 01 17 2012 05000
9. OPERATING MODE
11. THIS REPORT IS SUBMITTED PURSUANT TO THE REQUIREMENTS OF 10 CFR §: (Check all that apply) o 20.2201(b) o 20.2203(a)(3)(i) o 50.73(a)(2)(i)(C) o 50.73(a)(2)(vii) 1 o 20.2201(d) o 20.2203(a)(3)(ii) o 50.73(a)(2)(ii)(A) o 50.73(a)(2)(viii)(A) o 20.2203(a)(1) o 20.2203(a)(4) o 50.73(a)(2)(ii)(B) o 50.73(a)(2)(viii)(B) o 20.2203(a)(2)(i) o 50.36(c)(1)(i)(A) o 50.73(a)(2)(iii) o 50.73(a)(2)(ix)(A)
10. POWER LEVEL o 20.2203(a)(2)(ii) o 50.36(c)(1)(ii)(A)

IZI 50.73(a)(2)(iv)(A) o 50.73(a)(2)(x) o 20.2203(a)(2)(iii) o 50.36(c)(2) o 50.73(a)(2)(v)(A) o 73.71(a)(4) 90%

o 20.2203(a)(2)(iv) o 50.46(a)(3)(ii) o 50.73(a)(2)(v)(B) o 73.71(a)(5) o 20.2203(a)(2)(v) o 50.73(a)(2)(i)(A) o 50.73(a)(2)(v)(C) o OTHER S~eCifY in Abstract below or in o 20.2203(a)(2)(vi) o 50.73(a)(2)(i)(B) o 50.73(a)(2)(v)(D)

N C

CORRECTIVE ACTIONS

3. PAGE 3 OF 3 The root cause investigation is in progress. A supplement to the Licensee Event Report will be submitted upon completion of the investigation and will outline corrective actions to address the root cause.

PREVIOUS SIMILAR EVENTS

There have been no similar licensee event reports in the past three years.