| | Q | CCA | Title |
|---|
| 05000261/FIN-2013004-01 | 2013Q3 | P.5 | Lack of Preventive Maintenance Results in B EDG Recirculation Damper Failure |
| 05000261/FIN-2013005-01 | 2013Q4 | H.5 | Inadequate Preparation for Cold Weather Conditions |
| 05000261/FIN-2013005-02 | 2013Q4 | H.2 | Transient Materials Not Removed from Containment Prior to Reactor Startup |
| 05000261/FIN-2013005-03 | 2013Q4 | | Unauthorized Entry Into a HRA |
| 05000261/FIN-2014002-02 | 2014Q1 | | Steam Generator Tube Leak Resulting from Foreign Material |
| 05000261/FIN-2014002-03 | 2014Q1 | P.3 | Inadequate Preventive Maintenance on 4 KV Breaker 52/7 Results in an Automatic Reactor Trip |
| 05000261/FIN-2014002-01 | 2014Q1 | H.13 | Failure to Adequately Critique Fire Brigade Drills |
| 05000261/FIN-2014002-04 | 2014Q1 | H.6 | Failure to Provide Adequate Design Control Measures for Diesel Fuel Oil Cloud Point |
| 05000261/FIN-2014002-05 | 2014Q1 | | Defective Motor Operated Potentiometer causes failure of the DSDG during surveillance testing |