| Q | CCA | Title |
---|
05000250/FIN-2013004-01 | 2013Q3 | H.7 | Inadequate Procedure to Vent 3B SGFP Results in AFW Actuation |
05000250/FIN-2013004-02 | 2013Q3 | H.2 | Failure to Follow Procedure to Switch Running SGFPs Results in AFW Actuation |
05000250/FIN-2013004-03 | 2013Q3 | H.5 | Failure to Provide Adequate Instructions during Maintenance on the Gland Seal Steam System |
05000250/FIN-2013004-04 | 2013Q3 | H.8 | Power Operated Relief Valve Inoperable for Greater Than Allowed Outage Time Due to Lifted Leads |
05000250/FIN-2013004-05 | 2013Q3 | H.7 | Safety Injection Flow Path Not Isolated Due to Manual Valve Out of Position |
05000250/FIN-2013201-01 | 2013Q3 | | Security |
05000251/FIN-2013005-01 | 2013Q4 | H.5 | Inadequate Test Precautions, Limitations, and Instructions for Performing Harmonic Testing on the Unit 4 Turbine Generator |
05000250/FIN-2014007-01 | 2014Q1 | H.8 | Failure to Properly Implement Time Critical Operator Action Program Procedure |
05000250/FIN-2014002-01 | 2014Q1 | P.2 | Failure to Take Adequate Corrective Actions to Correct Flow Induced Vibration Leads to CCW Piping Weld Failures |
05000250/FIN-2014002-02 | 2014Q1 | | TS Channel Calibration of ESF Steam Line Protection Channel III Not Performed |
05000250/FIN-2014008-01 | 2014Q1 | H.8 | Failure to Properly Program the Turbine Generator Digital Control System Load Drop Anticipatory Circuit Results in a Manual Reactor Trip |
05000250/FIN-2014002-03 | 2014Q1 | | Loose Breaker Control Power Fuse Holder Caused 3B ICW Pump to be Inoperable Longer than Allowed Outage Time |
05000250/FIN-2014002-04 | 2014Q1 | | Loose Breaker Control Power Fuse Holder Caused 3B ICW Pump to be Inoperable Longer than Allowed Outage Time |
05000251/FIN-2014003-01 | 2014Q2 | H.8 | Failure to Implement a Surveillance Procedure to Perform a RCS Unidentified Leak Rate Statistical Calculation |
05000250/FIN-2014003-02 | 2014Q2 | | Reactor Coolant System Pressure Boundary Leakage at Pressurizer Heater Sleeve Attachment Weld |