05000250/FIN-2014002-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Take Adequate Corrective Actions to Correct Flow Induced Vibration Leads to CCW Piping Weld Failures |
Description | A self-revealing non-cited violation (NCV) of 10 CFR 50, Appendix B, Criterion XVI, Corrective Action, was identified when the licensee failed to implement corrective actions that addressed the low stress high cycle fatigue of component cooling water (CCW) relief valve (RV) 4-747B piping caused by flow induced vibration. As a result, CCW system flow induced vibration resulted in weld cracks and system pressure boundary leakage in January 2014. This issue was placed in the licensees corrective action program (CAP) as action request (AR) 1931761. Corrective actions included performing a root cause evaluation, implementing special instructions to minimize the time that split header operation is performed, and developing a plan to replace the existing relief valve with an orifice or alternate relief valve. The performance deficiency was more than minor because it was associated with the equipment performance attribute of the mitigating systems cornerstone and affected the cornerstone objective to ensure availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. Specifically, the failure to implement adequate corrective actions to address CCW system flow induced vibration resulted in weld cracks and CCW system pressure boundary leakage in January 2014. The finding was screened using Exhibit 1, Mitigating Systems Screening Questions, found in Inspection Manual Chapter 0609, Significance Determination Process, Appendix A, Significance Determination Process (SDP) for Findings At-Power (June 19, 2012). The inspectors determined the finding was of very low safety significance (Green) because the finding did not affect design or qualification, did not represent a loss of system function, and did not represent an actual loss of function of a TS train of equipment. The finding was associated with a cross-cutting aspect in the evaluation component of the problem identification and resolution area because the licensee did not thoroughly evaluate issues and corrective actions from previous weld failures on CCW system RV-4-747B piping caused by flow induced vibration (P.2). |
Site: | Turkey Point |
---|---|
Report | IR 05000250/2014002 Section 4OA2 |
Date counted | Mar 31, 2014 (2014Q1) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71152 |
Inspectors (proximate) | C Fontana D Rich M Endress M Speck R Carrion S Sanchez T Hoeg |
Violation of: | 10 CFR 50 Appendix B Criterion XVI Technical Specification |
CCA | P.2, Evaluation |
INPO aspect | PI.2 |
' | |
Finding - Turkey Point - IR 05000250/2014002 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Turkey Point) @ 2014Q1
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||