05000237/FIN-2015002-01
From kanterella
Jump to navigation
Jump to search
Finding | |
---|---|
Title | Failure to Meet Technical Specification Surveillance Requirements Due to Foreign Material Left in the Unit 2 EDG Starting Circuit |
Description | A finding of very-low safety significance (Green) was self-revealed on April 21, 2015 while performing TS Surveillance DOS 6600-12, Diesel Generator Tests: Endurance and Margin/Full Load Rejection/ECCS [Emergency Core Cooling System]/Hot Restart, in support of Surveillance Requirement 3.8.1.16 which requires the EDG to achieve rated frequency and voltage conditions within 13 seconds when started less than or equal to five minutes from a previously loaded run, the Unit 2 Emergency Diesel Generator (EDG) failed to complete a hot restart. Licensee troubleshooting identified a degraded pressure switch associated with main bearing lube oil pressure in the start circuit which was taking several minutes to return to a low-pressure condition upon shutting down the EDG. This resulted in a failure of the start circuit relay to be energized upon initiating a start of the EDG, until the pressure switch returned to its appropriate low-pressure state. An internal investigation of the pressure switch identified strips of Teflon tape in the bellows of the pressure switch, which resulted in the pressure switchs sluggish response to lowering lube oil pressure, and a failure to meet the TS hot restart criteria. The inspectors determined that the failure to implement Procedure MAAA716-008, Foreign Material Exclusion Program, and therefore the inability to perform TS Surveillance Requirement 3.8.1.16 was a performance deficiency, and was considered more than minor because it was associated with the equipment performance attribute of the Mitigating Systems cornerstone, and impacted the cornerstone objective to ensure the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The inspectors utilized Attachment 0609.04, Initial Characterization of Findings, and determined that this issue was of very-low safety significance because each question provided in Inspection Manual Chapter (IMC) 0609, Appendix A, Exhibit 2, Mitigating Systems Screening Questions, was answered No. The inspectors concluded that this finding was cross-cutting in the Human Performance, Documentation area, because licensee procedure MA-AA716-008, Foreign Material Exclusion Program, work instructions associated with Work Order 01410972-01, and previous calibrations of pressure switch 2-6641-526 did not include specific instructions and warnings regarding the proper use of Teflon tape with regards to preventing it from becoming foreign material. Other Dresden maintenance procedures, specifically MA-DR-0300-001, Preventive Maintenance of Hydraulic Control Unit, and DEP 0300-16, Rebuilding the Unit 2 (3) ASCO Scram Solenoid Pilot Valves, have specific warnings regarding the proper use and potential for Teflon tape to become foreign material. [H.7] |
Site: | Dresden ![]() |
---|---|
Report | IR 05000237/2015002 Section 1R13 |
Date counted | Jun 30, 2015 (2015Q2) |
Type: | Finding: Green |
cornerstone | Mitigating Systems |
Identified by: | Self-revealing |
Inspection Procedure: | IP 71111.13 |
Inspectors (proximate) | A Boland D Lords G Roach M Bielby M Learn M Porfirio M Ziolkowski T Go |
CCA | H.7, Documentation |
INPO aspect | WP.3 |
' | |
Finding - Dresden - IR 05000237/2015002 | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Finding List (Dresden) @ 2015Q2
Self-Identified List (Dresden)
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||