Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML22236A647 | 31 August 2022 | Documentation of the Completion of Required Actions Taken in Response to the Lessons Learned from the Fukushima Dai-ichi Accident |
IR 05000321/2018002 | 10 August 2018 | Nuclear Regulatory Commission Integrated Inspection Report 05000321/2018002 and 05000366/2018002 |
05000321/LER-2017-004 | 24 August 2017 | Tornado Missile Vulnerabilities Result in Condition Prohibited by Technical Specifications LER 17-004-00 for Edwin I. Hatch Regarding Safety Relief Valves' as Found Settings Resulted in Not Meeting Tech Spec Surveillance Criteria |
IR 05000321/2017002 | 3 August 2017 | Edwin I. Hatch Nuclear Plant - NRC Integrated Inspection Report and Exercise of Discretion 2017-002 |
ML17215A709 | 3 August 2017 | NRC Integrated Inspection Report and Exercise of Discretion 2017-002 |
IR 05000321/2016007 | 3 June 2016 | NRC Triennial Fire Protection Inspection Report 05000321/2016007 and 05000366/2016007 and Exercise of Enforcement Discretion (EA-16-119) |
IR 05000321/2015003 | 2 November 2015 | IR 05000321/2015003; and 05000366/2015003, on July 1, 2015, Through September 30, 2015; Edwin I. Hatch, Units 1 and 2, Follow-up of Events and Notices of Enforcement Discretion |
IR 05000321/2015001 | 4 May 2015 | IR 05000321/2015001 and 05000366/2015001; on January 1, 2015, Through March 31, 2015; Edwin I. Hatch, Units 1 and 2, Problem Identification and Resolution, Radiological Hazard Assessment and Exposure Control |
NL-13-1773, Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent with TSTF-419-A (NL-13-1773) | 2 April 2015 | Application for Amendment to Technical Specifications Regarding Relocation of Pressure and Temperature (P-T) Curves to the Pressure and Temperature Limits Report (PTLR) Consistent with TSTF-419-A (NL-13-1773) |
IR 05000321/2014005 | 26 January 2015 | IR 05000321/2014005 and 05000366/2014005, on October 1, 2014, Through December 31, 2014; Edwin I. Hatch, Units 1 and 2, Fire Protection, Problem Identification and Resolution |
ML14324A425 | 22 July 2014 | Revision 34 to Emergency Plan. ML14252A291 |
ML14155A405 | 30 June 2014 | Staff Assessment of the Flooding Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident (TAC MF0234-35) |
ML14079A355 | 6 June 2014 | Edwin I Hatch, Unit 2 - Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident |
ML14155A361 | 6 June 2014 | Staff Assessment of the Seismic Walkdown Report Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Dai-Ichi Nuclear Power Plant Accident |
IR 05000321/2014002 | 18 April 2014 | IR 05000321-14-002, 05000366-14-002; on 01/01/2014-03/31/2014; Edwin I. Hatch Nuclear Plant, Units 1 and 2, Operability Evaluations and Functionality Assessments, Problem Identification and Resolution, Follow-up of Events and Notices of Enf |
IR 05000321/2013009 | 16 January 2014 | IR 05000321-13-009, 05000366-13-009; 11/18-22/2013 and 12/2-6/2013; E.I. Hatch Nuclear Plant, Units 1 and 2; Fire Protection (Triennial) |
ML13325A891 | 23 December 2013 | Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns |
ML13324A261 | 18 November 2013 | Initial Exam 2013-301 Draft SRO Written Exams |
ML13324A228 | 18 November 2013 | Initial Exam 2013-301 Draft RO Written Exams |
NL-12-2269, Edwin I. Hatch, Unit 2, Seismic Recommendation 2.3 Walkdown Report in Response to Request for Information Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident | 27 November 2012 | Edwin I. Hatch, Unit 2, Seismic Recommendation 2.3 Walkdown Report in Response to Request for Information Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident |
ML12355A048 | 27 November 2012 | Seismic Recommendation 2.3 Walkdown Report Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident |
ML12355A636 | 27 November 2012 | Seismic Recommendation 2.3 Walkdown Report in Response to Request for Information Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Daiichi Accident |
NL-12-2268, Edwin I. Hatch, Unit 1, SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 | 26 November 2012 | Edwin I. Hatch, Unit 1, SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 |
NL-12-2269, SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch, Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 11 | 26 November 2012 | SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch, Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 11 |
NL-12-2269, SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 | 26 November 2012 | SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 |
NL-12-2268, SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 | 26 November 2012 | SNCH082-RPT-01, Ver. 1.0, Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 |
ML12355A631 | 26 November 2012 | SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch, Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 2 of 11 |
ML12355A637 | 26 November 2012 | SNCH082-RPT-02, Ver. 1.0, Edwin I. Hatch Unit 2 Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Part 1 of 11 |
ML12053A340 | 12 March 2012 | Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f) Regarding Recommendations 2.1, 2.3, and 9.3, of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident |
ML12056A049 | 12 March 2012 | Enclosure 3 - Recommendation 2.3: Seismic |
ML12056A050 | 12 March 2012 | Enclosure 4 - Recommendation 2.3: Flooding |
ML11308A668 | 28 September 2011 | Georgia Power Company - Reactor Plant Event Notification Worksheet |
NL-11-0703, SNC Comments on NRC Response to Region III, Technical Assistance Request Dated February 25.2011 | 8 April 2011 | SNC Comments on NRC Response to Region III, Technical Assistance Request Dated February 25.2011 |
IR 05000321/2007004 | 30 October 2007 | |
ML050380472 | 11 March 2004 | E-mail from I. F. Luker to C. Smith; Re; Unanalyzed Condition Involving Spurious Opening of SRVs |
ML050540476 | 31 October 2003 | Portions of Draft Edwin I. Hatch Nuclear Power Plant - NRC Triennial Fire Protection Inspection IR 05000321-03-006 and 05000366-03-006 |
ML050540475 | 31 October 2003 | Draft Version of Edwin I. Hatch Nuclear Power Plant - NRC Triennial Fire Protection IR 05000321-03-006 and 05000366-03-006 |
ML032591209 | 1 September 2003 | IR 05000321-03-006, IR 05000366-03-006, on 07/07-11/2003 & 07/21-25/2003, E. I. Hatch Nuclear Plant, Units 1 and 2; Triennial Fire Protection |
ML050540508 | 31 August 2003 | Draft Version of Edwin I. Hatch Nuclear Power Plant - NRC Triennial Fire Protection IR 05000321-03-006 and 05000366-03-006 |
ML050540514 | 31 August 2003 | Draft Version of Edwin I. Hatch Nuclear Power Plant - NRC Triennial Fire Protection IR 05000321-03-006 and 05000366-03-006 |
ML050540462 | 31 August 2003 | Draft Version of Edwin I. Hatch Nuclear Power Plant - NRC Triennial Fire Protection IR 05000321-03-006 and 05000366-03-006 |
ML050540305 | 31 August 2003 | Draft Version of Edwin I. Hatch Nuclear Power Plant - NRC Triennial Fire Protection IR 05000321-03-006 and 05000366-03-006 |
ML050560347 | 31 August 2003 | Draft Version of Edwin I. Hatch Nuclear Power Plant - NRC Triennial Fire Protection IR 05000321-03-006 and 05000366-03-006 |
ML050380480 | 13 August 2003 | E-mail from K. Sullivan to C. Smith; Hatch Tfpi Draft Report |
ML050380477 | 31 July 2003 | E-mail from K. Sullivan to C. Smith; BNL Inspection Report Input- Hatch |
Information Notice 1997-48, Inadequate or Inappropriate Interim Fire Protection Compensatory Measures | 9 July 1997 | Inadequate or Inappropriate Interim Fire Protection Compensatory Measures |
ML20137C426 | 18 March 1997 | Director'S Decision Under 10CFR2.206 Re Petition Re Allegation of Illegal Transfer of OLs to Southern Nuclear Operating Co.Petitions Filed by Mb Hobby & AL Mosbaugh Denied |
ML20137C258 | 18 March 1997 | Summary of Director'S Decision Under 10CFR2.206 of Mb Hobby & AL Mosbaugh, |
HL-5248, Requests Temporary Relief from Making ASME Code Repair on Unit 2 Plant Svc Water Valve 2P41-F332D.Addl Details Pertinent to This Request Encl | 4 October 1996 | Requests Temporary Relief from Making ASME Code Repair on Unit 2 Plant Svc Water Valve 2P41-F332D.Addl Details Pertinent to This Request Encl |
ML20113F554 | 19 September 1996 | Proposed Tech Specs,Clarifying Applicability of Certain Surveillances Addressing Rvp & Temp Limits & Replacing Vessel Pressure & Temp Limit Curves W/New Curves |