Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000285/202200315 June 2022NRC Inspection Report 05000285/2022003
LIC-20-0005, Independent Spent Fuel Storage Installation, Technical Specification Basis30 April 2020Independent Spent Fuel Storage Installation, Technical Specification Basis
ML19029A15417 December 2018Permanently Defueled Emergency Action Level Technical Bases
LIC-18-0003, License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool28 September 2018License Amendment Request (LAR) 18-01; Revised Fort Calhoun Station Permanently Defueled Technical Specifications to Align to Those Requirements for Permanent Removal of Spent Fuel from Spent Fuel Pool
LIC-18-0018, Independent Spent Fuel Storage Installation - Emergency Plan Update18 April 2018Independent Spent Fuel Storage Installation - Emergency Plan Update
ML18010A0876 March 2018Issuance of Amendment No. 297, Request for Technical Specification Changes to Align to Those Requirements for Decommissioning (CAC No. MF9567; EPID L-2017-LLA-0192)
LIC-17-0001, License Amendment Request (LAR) 17-01; Revised Technical Specifications to Align to Those Requirements for Decommissioning31 March 2017License Amendment Request (LAR) 17-01; Revised Technical Specifications to Align to Those Requirements for Decommissioning
LIC-16-0108, License Amendment Request 16-07, Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme16 December 2016License Amendment Request 16-07, Revise the Emergency Plan to the Permanently Defueled Emergency Plan and Permanently Defueled Emergency Action Level Scheme
ML15307A01323 February 2016Issuance of Amendment No. 286, Request to Make Administrative Changes to the Technical Specifications to Update Titles, Delete Obsolete Actions in Appendix B, and Relocate a Definition
LIC-15-0053, License Amendment Request (LAR) 15-04; Application to Revise Technical Specification for Administrative Changes20 August 2015License Amendment Request (LAR) 15-04; Application to Revise Technical Specification for Administrative Changes
IR 05000285/201500230 July 2015IR 05000285/2015002; 4/01/2015 - 6/30/2015; Fort Calhoun Station, Integrated, Inservice Inspection Activities, EAL and Emergency Plan Changes, Follow-up of Events
ML14316A16719 November 2014Relief Request RR-14, Proposed Alternative for Temporary Acceptance of a Pin Hole Leak in Raw Water System 20-Inch Elbow Located in Room 19 of Auxiliary Building
LIC-14-0077, CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (Usar)Revision17 June 2014CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (Usar)Revision
ML14078A66619 March 2014IR 05000285-14-002; 01/01/2014 - 02/15/2014; Fort Calhoun Station; Integrated Resident Inspection Report and Confirmatory Action Letter Closeout Items & Notice of Violations
IR 05000285/20130158 November 2013IR 05000285-13-015; 08/11/2013 - 09/30/2013; on Fort Calhoun Station, Integrated Resident and Regional Report; Emergency Action Level and Emergency Plan Changes
IR 05000285/201301423 September 2013IR 05000285-13-014; 07/01/2013 - 08/10/2013; Fort Calhoun Station, Integrated Resident and Regional Report; Emergency Preparedness Performance Indicators
IR 05000285/20130059 August 2013IR 05000285-13-005, on 05/19/2013 - 06/30/2013, Fort Calhoun Station, Integrated Resident and Regional Report, Radiological Hazard Assessment and Exposure Control, ALARA Planning and Controls, In-plant Airborne Radioactivity Control and Mit
IR 05000285/201300816 July 2013IR 05000285-13-008, on 01/14/2013 06/10/2013, Fort Calhoun Station, Supplemental Inspection for Repetitive Degraded Cornerstones, Multiple Degraded Cornerstones, Multiple Yellow Inputs or One Red Input
IR 05000285/201300413 June 2013IR 05000285-13-004; Omaha Public Power District; 04/01/2013 - 05/18/2013; Fort Calhoun Station, NRC Integrated Inspection Report
IR 05000285/201301224 May 2013IR 05000285-13-012; 01/29/2013 - 04/11/2013; Fort Calhoun Station; Special Inspection Report; IP 93812; Design Control and Corrective Action Violations
IR 05000285/201300310 May 2013IR 05000285-13-003, 02/17/2013 - 03/31/2013, Fort Calhoun Station, Integrated Resident and Regional Report
ML13043A66128 February 2013Issuance of Amendment No. 270 to Revise Technical Specification 2.15 to Establish Limiting Condition for Operation Requirements for Reactor Protective System Actuation Circuits
LIC-13-0001, License Amendment Request 13-01, Revision to Technical Specifications Sections 2.0.1 and 2.7 for Inoperable System, Subsystem or Component Due to Inoperable Power Source18 February 2013License Amendment Request 13-01, Revision to Technical Specifications Sections 2.0.1 and 2.7 for Inoperable System, Subsystem or Component Due to Inoperable Power Source
ML12132A39511 May 2012IR 05000285-12-002; 01/01/2012 - 03/31/2012; Fort Calhoun Station, Integrated Resident and Regional Report; Adverse Weather Protection, Emergency Plan Biennial Exercise, Mc 0350
LIC-12-0006, License Amendment Request (LAR) 12-01, Proposed Change to Establish the Reactor Protective System (RPS) Actuation Circuits Limiting Condition for Operation (LCO)10 February 2012License Amendment Request (LAR) 12-01, Proposed Change to Establish the Reactor Protective System (RPS) Actuation Circuits Limiting Condition for Operation (LCO)
IR 05000285/201100311 August 2011IR 05000285-11-003; 04/01/2011 06/30/2011; Fort Calhoun Station, Integrated Resident and Regional Report; Radiological Hazard Assessment and Exposure Controls, Surveillance Testing, Emergency Action Level and Emergency Plan Changes, Fire ..
ML0925405919 October 2009License Amendment, Issuance of Amendment No. 263 Modify Technical Specifications to Add Operability and Testing Requirements for Steam Generator Blowdown Isolation on a Reactor Trip
LIC-09-0068, Response to Revision to License Amendment Request (LAR) 09-01, Steam Generator Blowdown Isolation Operability and Testing Requirements.28 August 2009Response to Revision to License Amendment Request (LAR) 09-01, Steam Generator Blowdown Isolation Operability and Testing Requirements.
LIC-09-0043, Response to Request for Additional Information Concerning License Amendment Request (LAR) 09-01, Steam Generator Blowdown Isolation Operability and Testing Requirements30 June 2009Response to Request for Additional Information Concerning License Amendment Request (LAR) 09-01, Steam Generator Blowdown Isolation Operability and Testing Requirements
ML09168058917 June 2009Request for Additional Information, License Amendment Request, Modify Technical Specifications to Add Operability and Testing Requirements for Steam Generator Blowdown Isolation on a Reactor Trip
LIC-09-0036, License Amendment Request 09-03,Revision to Technical Specifications Sections 2.0.1 & 2.7 for Inoperable System, Subsystem or Component Due to Inoperable Power Source & Deletion of Diesel Generator Surveillance Requirements 3.7(1)e29 May 2009License Amendment Request 09-03,Revision to Technical Specifications Sections 2.0.1 & 2.7 for Inoperable System, Subsystem or Component Due to Inoperable Power Source & Deletion of Diesel Generator Surveillance Requirements 3.7(1)e
LIC-09-0004, License Amendment Request (LAR) 09-01, Steam Generator Blowdown Isolation Operability and Testing Requirements30 January 2009License Amendment Request (LAR) 09-01, Steam Generator Blowdown Isolation Operability and Testing Requirements
IR 05000285/200700511 February 2008IR 05000285-07-005, on 10/01/2007 - 12/31/2007, Fort Calhoun Station, Integrated Resident and Regional Report, Adverse Weather Protection, Flood Protection Measures, Maintenance Effectiveness, Operability Evaluations, Permanent Plant Modifi
ML07296017031 October 2007Public Meeting Summary on the Reactor Oversight Process
IR 05000285/200701026 October 2007IR 05000285-07-010; on 08/27/2007 - 09/14/2007; Omaha Public Power District; Fort Calhoun Station, Biennial Inspection of the Identification and Resolution of Problems
ML07253061421 September 2007Public Meeting Summary on the Reactor Oversight Process
ML07200042826 July 2007FAQ Log, Dated 6/13/07
ML0707100983 April 2007Technical Specifications, Editorial Changes to Apply Certain Limiting Conditions for Operation Requirements
ML0706401552 March 2007IR 05000285-06-018; on 10/10/2006 - 02/13/2007; for Fort Calhoun Station; Other Activities
LIC-06-0147, License Amendment Request for Administrative Revisions to Fort Calhoun Station, Unit No. 1 Technical Specifications20 December 2006License Amendment Request for Administrative Revisions to Fort Calhoun Station, Unit No. 1 Technical Specifications
ML0531104884 November 2003Current Facility Operating License DPR-40, Technical Specifications, Revised 04/02/2018
ML03196062511 July 2003Correction to Amd. 218 for the Fort Calhoun Station, Unit No. 1 (Tac. MB7498)
ML03022015316 January 2003Technical Specification Pages for Amendment 215 Missed Surveillances and Adoption of a Technical Specification Bases Control Program
LIC-02-0111, License Amendment Request, Technical Specification Change Regarding Missed Surveillances and Adoption of a Technical Specification Bases Control Program. Supplement8 October 2002License Amendment Request, Technical Specification Change Regarding Missed Surveillances and Adoption of a Technical Specification Bases Control Program. Supplement
LIC-02-0066, License Amendment Request Re Technical Specification Change Regarding Missed Surveillance and Adoption of a Technical Specification Bases Control Program for Fort Calhoun Unit 122 July 2002License Amendment Request Re Technical Specification Change Regarding Missed Surveillance and Adoption of a Technical Specification Bases Control Program for Fort Calhoun Unit 1
ML02119016225 April 2002Ft Calhoun, Amd 208, TS Pages Revising Technical Specifications 2.15(5) and 2.15(6), Instrumentation and Control System
LIC-02-0010, License Amendment Request Regarding Alternate Shutdown Panel and Auxiliary Feedwater Panel13 February 2002License Amendment Request Regarding Alternate Shutdown Panel and Auxiliary Feedwater Panel
IR 05000285/19980205 October 1998Insp Rept 50-285/98-20 on 980816-0926.No Violations Noted. Major Areas Inspected:Operations,Maint & Engineering
ML20199H86128 January 1998Insp Rept 50-285/97-20 on 971207-980117.Violations Noted. Major Areas Inspected:Operation,Maint,Engineering & Plant Support
ML20203G43111 December 1997Proposed Tech Specs,Adding New LCO to TS 2.15 Pertaining to Inoperable ESF Logic Subsystem