Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
Information Notice 1995-28, Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites | 5 June 1995 | Emplacement of Support Pads for Spent Fuel Dry Storage Installations at Reactor Sites |
ML20206N000 | 3 November 1988 | Affidavit of Ej Gleason,Director of Planning,State of Ny Energy Ofc.* Provides Data on Whether Supply of Electric Power to Long Island Would Be Adversely Impacted If Plant Did Not Operate.W/Related Info & Certificate of Svc |
ML20151T479 | 21 April 1988 | Affidavit of Gc Minor & Sc Sholly Re Validity of Analyses & Conclusions Ref in Youngling Affidavit.W/Certificate of Svc |
ML20150F889 | 1 April 1988 | Lilco Brief on Substantive Relevance of Remaining Emergency Planning Contentions to Lilco Motion to Operate at 25% Power.* Affidavit of Ej Youngling Encl.W/Certificate of Svc |
ML20236F892 | 21 July 1987 | Transcript of 870721 Meeting in Bethesda,Md Re Supplemental Containment Sys.Pp 1-107.Supporting Documentation Encl |
NRC Generic Letter 1987-11 | 19 June 1987 | NRC Generic Letter 1987-011: Relaxation in Arbitrary Intermediate Pipe Rupture Requirements |
ML20206H443 | 14 April 1987 | Request for Authorization to Increase Power to 25% & Motion for Expedited Commission Consideration.* Apps 1-11 & Certificate of Svc Encl.Related Correspondence |
NRC Generic Letter 1986-10 | 24 April 1986 | NRC Generic Letter 1986-010: Implementation of Fire Protection Requirements |
ML20096H055 | 7 September 1984 | Reply Opposing Suffolk County & State of Ny Proposed Findings of Fact.Findings Represent Unbalanced & Inaccurate Treatment of Facts |
ML20096C020 | 31 August 1984 | Proposed Findings of Fact Re Relative Safety of Low Power Operation W/Alternate Configuration & W/Qualified Power Sources.Certificate of Svc Encl |
ML20096C462 | 31 August 1984 | Proposed Finding of Fact Based on Evidence Presented on 840424-25 & 840730-0808 & ASLB 840724 Order Granting in Part & Denying in Part Util Motion for Summary Disposition on Phases I & II of Low Power Testing |
ML20096C471 | 31 August 1984 | Post-hearing Brief in Support of Application for Exemption Re Phases I-IV of Low Power Testing |
ML20093F348 | 16 July 1984 | Testimony of Jt Christian,Ae Meligi & Rc Wiesel Re Operating Procedures for Ac Power Sources |
ML20093F443 | 16 July 1984 | Testimony of Gd Eley,Cj Smith,Gc Minor & DG Bridenbaugh Re General Motors Electro-Motive Div (EMD) Diesel Generators & 20 MW Gas Turbine.Prof Qualification Statements Encl.Related Correspondence |
SNRC-1057, Forwards Seismic Survivability Study for MP-45 Diesel Generators | 15 June 1984 | Forwards Seismic Survivability Study for MP-45 Diesel Generators |
ML20128Q388 | 31 May 1984 | Draft PRA Shoreham Nuclear Power Station,Low Power Operation Up to 5% of Full Power |
ML20083R057 | 20 April 1984 | Testimony of Wj Museler Re Util Commitments & Procedures During Phases II-IV of Low Power Testing Program.Certificate of Svc Encl |
NRC Generic Letter 1984-01 | 5 January 1984 | NRC Generic Letter 1984-001: NRC Use of the Terms, Important to Safety and Safety Related |
ML20072G577 | 20 June 1983 | Forwards Revised Table 3.9.2B-3 of Fsar,Per SER Item 10, Denoting Fuel Lift Under Combined SSE & LOCA Loadings as Zero.Value Based on 84% Nonexceedence Probability at 50% Confidence Level,Consistent w/NEDE-21175-3-P |
ML20023B413 | 2 May 1983 | Revised Proposed Opinion,Findings of Fact & Conclusions of Law in Form of Partial Initial Decision |
ML20063A645 | 18 August 1982 | Closes SER Item 10 Re Seismic & LOCA Loadings.Ge Topical Rept NEDE-21175-3-P, BWR Fuel Assembly Evaluation of Combined SSE & LOCA Loadings, Demonstrates Util Fuel Response within Acceptable Limits |
ML20054L542 | 1 July 1982 | Rebuttal Testimony of Jh Conran Re Applicant Testimony on Safety Classification & Analysis of Structures,Sys & Components.Certificate of Svc Encl.Related Correspondence |
ML20054G662 | 18 June 1982 | Transcript of 820618 Hearing in Hauppauge,Ny.Pp 4,776-4,991 |
ML20054E640 | 9 June 1982 | Transcript of 820609 OL Hearing in Hauppauge,Ny. Pp 3,818-4,037 |
ML20052G364 | 13 May 1982 | Motion to Strike Portions of Util Testimony on Shoreham Opponents Coalition Contention 19(e).Questions 11-16 Irrelevant to Contention as Stated.Certificate of Svc Encl. Related Correspondence |
ML20008E681 | 5 March 1981 | Forwards Addl Info Re Seismic Qualification Review,Per NRC 810228 Request.Info Suppls 810130 Info |
ML20003E747 | 28 February 1981 | Plant Design Assessment for Safety Relief Valve & LOCA Loads, Vol 2,Revision 4 |
NRC Generic Letter 1980-11 | 22 December 1980 | NRC Generic Letter 1980-113, Control of Heavy Loads. |
ML19274D809 | 5 February 1979 | Applicant'S Motion for Summary Disposition of Suffolk County Contentions 17a(i)-(ii).W/affidavits & Qualifications of WE Kilker & F Boorboor |
ML19259B394 | 5 February 1979 | Submits Addl Info Re SER Open Items.Forwards Draft Copy of Pending FSAR Figure Change to Reflect Improvement in Intake Canal Slope Stability.Addl Submittals Re Remaining SER Open Items Will Be Made 790228 |
ML20062G011 | 18 December 1978 | Rev 3 to Plant Design Assessment Rept for SRV & LOCA Loads. Provides Info on Load Definition,Load Combination Methods, Acceptance Criteria & Plant Capability to Accept Hydrodynamic Loads |
ML20062F922 | 30 November 1978 | Reviews Status of All Contentions Raised by Intervenor Suffolk County in Proceedings Re Subj Facils.Tech Bases & Supporting Documentation for Each Contention Are Provided. Cert of Svc Encl |
ML20067A292 | 25 November 1975 | Discusses Schedule for Submitting Five Items for Assessment of BWR Mark II Containment Structures |
ML20214G603 | 26 August 1975 | Summary of 750821 Meeting W/Mark II Owners,Sargent & Lundy, Bechtel,S&W & B&R in Bethesda,Md Re Load Factors & Load Combinations for Assessing Capability of Mark II Containments to Accommodate Safety/Relief Valve Loads |
ML17037B849 | 23 August 1975 | 08/21/1975 Summary of Meeting with Mark II Owners, Sargent & Lundy, Bechtel, Stone & Webster, Burns & Roe, and the NRC Staff to Discuss Load Factors and Load Combinations Proposed by the Mark II Owners and Their Architect ... |