Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23135A04115 May 20232022 Annual Radioactive Effluent Release Report and 2022 Annual Radiological Environmental Operating Report
ML22133A00913 May 2022Independent Spent Fuel Storage Installation (Isfsi), 2021 Annual Radioactive Effluent Release Report and 2021 Annual Radiological Environmental Operating Report
IR 05000244/20210034 November 2021Integrated Inspection Report 05000244/2021003
ML21133A14011 May 2021and Independent Spent Fuel Storage Installation (ISFSI) - 2020 Annual Radioactive Effluent Release Report and 2020 Annual Radiological Environmental Operating Report
ML20339A22120 November 2020Technical Specifications Bases, Rev 101
ML20339A05520 November 20209 to Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Section 3.8, Design of Seismic Category I Structures
ML20339A04520 November 20209 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management, Sections 11.1 Through 11.5
ML20339A02520 November 20209 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Sections 9.1 Through 9.5
ML20339A01820 November 20209 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection, Sections 12.1 Thru 12.5
ML20322A35017 September 2020Final Operating Test (Sections a, B, and C) (Folder 3)
ML20329A23922 July 2020Draft Operating Test (Section a, Section B, Section C) (Folder 2)
ML20136A43915 May 20202019 Annual Radioactive Effluent Release Report and 2019 Annual Radiological Environmental Operating Report
ML19162A1756 June 201910 CFR 50.54(q)(5) Procedure Change Summary Analysis
ML19137A09515 May 2019Annual Radiological Environmental Operating Report, January 1, 2018 - December 31, 2018.
ML19137A09415 May 2019CY-GI-170-300, Revision 36, Offsite Dose Calculation Manual (ODCM) R. E. Ginna Nuclear Power Plant.
ML19150A51110 May 2019Revision 90 to Technical Specification Bases
ML19150A48810 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 12, Sections 12.1 Thru 12.5
ML19150A48410 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 11, Sections 11.1 Thru 11.5
ML19150A47810 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 09, Sections 9.1 Thru 9.5
ML19150A44510 May 2019Revision 28 to Updated Final Safety Analysis Report, Chapter 3, Section 3.8, Design of Seismic Category I Structures
ML18137A21631 May 2018Annual Radiological Environmental Operating Report: January 1, 2017 - December 31, 2017
ML18117A01019 April 2018Attachment 1 - 10 CFR 50.54(q)(5) Change Summary Analysis
ML18024A47611 January 2018Attachments 1-4: 10CFR50.54(q)(5) Procedure Change Summary Analysis, EP-AA-1007, Rev. 33, EP-AA-1008, Rev 30 and EP-AA-1012, Rev. 4
ML18137A21531 December 2017Appendix B - R.E. Ginna Nuclear Power Plant - Offsite Dose Calculation Manual Revision 33
ML17143A01231 May 2017Attachment 2 - Annual Radiological Environmental Operating Report: January 1, 2016 - December 31, 2016
ML16207A11314 July 2016Radiological Emergency Plan Annex Revisions
ML16145A50612 May 2016Annual Radioactive Effluent Release Report and Annual Radiological Environment Operating Report
ML16180A1705 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 12, Radiation Protection
ML16180A1685 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management
ML16180A1415 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 3, Design of Structures, Components, Equipment, and Systems, Section 3.8, Design of Seismic Category I Structures
ML16180A1645 May 2016Revision 26 to the Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML15146A17014 May 2015Annual Radioactive Effluent Release Report, January 1, 2014 - December 31, 2014
ML15146A17314 May 2015Annual Radiological Environmental Operating Report, January 1, 2014 - December 31, 2014
IR 05000244/201500112 May 2015IR 05000244-15-001; 01/01/2015 - 03/31/2015; R.E. Ginna Nuclear Power Plant, LLC (Ginna); Maintenance Effectiveness, Emergency Action Level and Emergency Plan Changes
ML15146A1715 February 2015Offsite Dose Calculation Manual (Odcm), Revision 28
ML15012A4605 January 2015Revised Nuclear Emergency Response Plan
ML15043A6781 December 2014Final Outlines (Folder 3
ML15146A17227 June 2014Offsite Dose Calculation Manual (Odcm), Revision 29
ML14140A07713 May 2014Annual Radioactive Effluent Release Report, Offsite Dose Calculation Manual, and Annual Radiological Environmental Operating Report
ML13141A47714 May 20132012 Annual Radioactive Effluent Release Report Including Revision 27 of the Offsite Dose Calculation Manual
ML13141A47814 May 2013Annual Radiological Environmental Operating Report: January 1, 2012 - December 31, 2012
ML13149A41926 April 2013Final Operating Exam (Sections a, B, and C) (Folder 3)
ML13184A1865 April 2013Draft Operating Exam (Sections a Abd B) (Folder 2)
ML12142A29731 May 2012Annual Radiological Environmental Operating Report: January 1, 2011 - December 31, 2011
NRC-2011-0205, FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/1125 August 2011FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11
ML11237A00725 August 2011FRN: General Notice. Biweekly Sholly Report - Applications and Amendments to Facility Operating Licenses Involving No Significant Hazards Considerations; Fr Publication Date: 9/6/11
ML11139A34731 May 2011Annual Radiological Environmental Operating Report: January 1, 2010 - December 31, 2010, Enclosure 2
ML12142A29625 April 2011R. E. Ginna Nuclear Power Plant Offsite Dose Calculation Manual (Odcm), Revision 27
ML10232040825 May 2010Final Operating Exam (Sections a, B, and C) (Folder 3)
ML10141010231 December 2009Annual Radioactive Effluent Release Report