Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
L-21-005, Independent Spent Fuel Storage Installation, Final Safety Analysis Report Update, Revision 11, November 2021 | 4 November 2021 | Independent Spent Fuel Storage Installation, Final Safety Analysis Report Update, Revision 11, November 2021 |
L-20-005, ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Figures 2.6-1 to 2.6-20 | 3 September 2020 | ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Figures 2.6-1 to 2.6-20 |
ML20281A411 | 3 September 2020 | ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Figures 2.6-47 to 2.6-85 |
ML20281A409 | 3 September 2020 | ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Figures 2.6-86 to 2.6-120 |
ML20281A407 | 3 September 2020 | ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Figures 2.6-21 to 2.6-44 |
ML20281A412 | 3 September 2020 | ISFSI, Revision 10 to the Updated Final Safety Analysis Report, Except 2.6 Figures |
ML20168A559 | 16 June 2020 | Final ASP Analysis - Humboldt Bay (LER 133-75-LTR) |
ML19211B777 | 31 July 2019 | Draft Environmental Assessment for the Proposed Renewal of the Us Nuclear Regulatory Commission License Number SNM-2514 for the Humboldt Bay Independent Spent Fuel Storage Installation in Humboldt County, CA |
ML18215A213 | 31 July 2018 | Humboldt Bay ISFSI - Site-Specific License Renewal Application, Revision 0, July 2018 |
ML16106A054 | 30 April 2016 | Final Environmental Assessment for Humboldt Bay License Termination |
ML15007A433 | 14 January 2015 | Emergency Plan RAI Ltr |
HBL-14-015, License Termination Plan, Revision 1. Part 3 of 3 | 13 August 2014 | License Termination Plan, Revision 1. Part 3 of 3 |
HBL-14-016, Humboldt, Unit 3 and ISFSI - License Amendment Request for Proposed Revision to Humboldt Bay Site Emergency Plan | 30 June 2014 | Humboldt, Unit 3 and ISFSI - License Amendment Request for Proposed Revision to Humboldt Bay Site Emergency Plan |
ML13274A050 | 20 August 2013 | Transcript of Meeting on Humboldt Bay Decommissioning Process License Termination Plan, August 20, 2013, Pages 1-45 |
HBL-13-003, Decommissioning Funding Report, Page 86 of 120 Through End | 1 April 2013 | Decommissioning Funding Report, Page 86 of 120 Through End |
ML13130A010 | 2 March 2013 | ENG-HB-006, Rev 0, Area Factors for Use with Humboldt Bay Building Surface Dcgls. |
IR 05000133/2012011 | 11 October 2012 | IR 05000133-12-011, 9/11-14/2012, Pacific Gas and Electric Company, Humboldt Bay Power Plant, Unit 3 |
ML14128A369 | 1 October 2012 | Caisson Removal Feasibility Study Hundred Percent Draft Feasibility Report |
ML14128A113 | 28 June 2012 | Report - Decommissioning Capstone Document |
IR 05000133/2012007 | 13 March 2012 | IR 05000133-12-007, February 13-17, 2012, Pacific Gas and Electric Company |
ML12037A032 | 31 August 2011 | E-mail from R. Bernardo, NRR to R. Sigmon, NRR, Et Al; Subject: Info Request: Exceeding Obe/Sse |
IR 05000133/2011001 | 18 April 2011 | IR 05000133-11-001, on March 21-24, 2011, Pacific Gas and Electric Company, Humboldt Bay Power Plant, Unit 3, Inspection Report |
Press Release-11-043, NRC Continues to Track Earthquake and Tsunami Issues | 11 March 2011 | Press Release-11-043: NRC Continues to Track Earthquake and Tsunami Issues |
IR 05000133/2010004 | 28 September 2010 | IR 05000133-10-004, on 08/30/2010 - 09/02/2010 for Pacific Gas and Electric Company, Humboldt Bay, Unit 3 |
IR 05000133/2010002 | 13 April 2010 | IR 05000133-10-002, Pacific Gas and Electric Company, Humboldt Bay Power Plant, Dated 04/13/2010 |
HBL-10-003, Request for 10 CFR 20.2002 Alternate Disposal Approval and 10 CFR 30.11 Exemption of Waste for Disposal at Us Ecology Idaho | 1 April 2010 | Request for 10 CFR 20.2002 Alternate Disposal Approval and 10 CFR 30.11 Exemption of Waste for Disposal at Us Ecology Idaho |
IR 05000133/2010001 | 9 February 2010 | IR 05000133-10-001; 07200027-10-001, on January 11-14, 2010, Humboldt Bay Power Plant, Unit 3 |
PNO-IV-10-001, A: Earthquake Near Humboldt Bay Power Plant (Update) | 19 January 2010 | PNO-IV-10-001A: Earthquake Near Humboldt Bay Power Plant (Update) |
ML100110532 | 11 January 2010 | PNO-IV-10-001, Humboldt Bay Power Plant, Earthquake Near Humboldt Bay Power Plant |
IR 05000133/2007004 | 16 September 2008 | IR 05000133-07-004, IR 0720270-07-002, Pacific Gas and Electric Company Dated 09/16/2008 |
IR 05000133/2007002 | 4 September 2007 | IR 05000133-07-002 & 07200027-07-001, on 06/18/2007 - 08/16/2007. Pacific Gas and Electric Company; Humboldt Bay Power Plant Unit 3 Facility Inspection |
ML070160090 | 22 January 2007 | Notice of Consideration, Modification of Physical Security Plan (PSP) |
ML060660576 | 10 July 2006 | Issuance of Amendment Regarding Technical Specification Section 3.1.2, Spent Fuel Pool Load Restrictions and Section 5.2.2, Facility Staff, (TAC No. L52673) |
ML061570267 | 22 June 2006 | Fr Notice of EA and Finding of No Significant Impact Related Issuance of a License Amendment for Humboldt Bay Power Plant Unit 3 (TAC L52673) |
IR 05000133/2006001 | 3 February 2006 | IR 05000133-06-001, from 01/09-12/2006 Facility of Humboldt Bay Power Plant Unit 3, Pacific Gas and Electric Company, in San Francisco, CA |
HBL-06-002, Revision of Technical Specification Section 3.1.2. Spent Fuel Pool Load Restrictions, and Section 5.2.2., Facility Staff | 19 January 2006 | Revision of Technical Specification Section 3.1.2. Spent Fuel Pool Load Restrictions, and Section 5.2.2., Facility Staff |
Press Release-05-156, NRC Issues License for Humboldt Bay Independent Spent Nuclear Fuel Storage Installation | 18 November 2005 | Press Release-05-156: NRC Issues License for Humboldt Bay Independent Spent Nuclear Fuel Storage Installation |
ML061600379 | 3 October 2005 | Electronic Mail from James Park (NRC) to Barbara Byron (CEC) Re Cec'S Comments on Pre-Decisional EA for Proposed Humboldt Bay ISFSI |
DCL-05-027, PG&E Corporation 2004 Annual Report | 22 March 2005 | PG&E Corporation 2004 Annual Report |
ML042050310 | 22 July 2004 | Request for Additional Information on License Application and Safety Analyses Report |
ML041190142 | 29 April 2004 | Slides from Meeting with Pacific Gas & Electric and Holtec Regarding Plans Related to the Installation of a Single-Failure-Proof Crane at Humboldt Bay |
ML040860722 | 31 March 2004 | Defueled Safety Analysis Report, Revision 5 |
ML033640453 | 15 December 2003 | Independent Spent Fuel Storage Installation License Application, Environmental Report, Cover Page Through Figure 2.2-10 |
ML033640444 | 15 December 2003 | Independent Spent Fuel Storage Installation License Application, Table of Contents Through Attachment a - PG&E Corp Year in Review & Financial Statistical Report |
L-03-003, ISFSI - Submittal of Geotechnical and Probability Risk Assessment Calculation Packages | 15 December 2003 | ISFSI - Submittal of Geotechnical and Probability Risk Assessment Calculation Packages |
ML033640677 | 15 December 2003 | Independent Spent Fuel Storage Installation License Application, Environmental Report, Figure 2.3-1 - Appendix a |
ML033650247 | 29 September 2003 | to GEO.HBIP.03.02, Amplification Factors for Probabilistic Seismic Hazard Analysis at the Hbip ISFSI Site. |
ML033650248 | 29 September 2003 | to GEO.HBIP.03.04, Development of Probabilistically Based Spectra for the Hbip ISFSI Site. |
ML033650198 | 1 August 2003 | to GEO.HBIP.02.07, Determination of Potential Earthquake-Induced Displacements of Critical Slides at Hbip ISFSI Site. |
ML033650201 | 30 July 2003 | to GEO.HBIP.02.08, Determination of Potential Earthquake-Induced Displacements of Critical Slide Along Hbip ISFSI Transport Route. |