PRECURSOR DESCRIPTION AND DATA NSIC Accession Number:

104379 Date:

July 3, 1975

Title:

Earthquake Occurs at Humboldt Bay The failure sequence was:

1. Humboldt Bay was shutdown for refueling.
2. An earthquake of.36 g occurred at the plant.
3. The plant was inspected and no damage was identified.

Corrective action:

None Design purpose of failed systemn or component:

N.A.

Unavilailiy ofsysem er WSH 400 Unavailability of systoemt per WASH 1400:-

Unavailabilities are in units of per demand D-1.

Failure rates are in units of per hour HR-1.

IThe Plant Was A.36 g.Earthquake Plant Safety Shutdown For Occurs At The Systems Refueling Plant Site Damaged Potential Severe Core Da mag e No plant shutdown No No NSIC 104379 -

Actual Occurrence of Earthquake Occurs at Humboldt Bay

Earthquake Design Bases Transients Engineered Safety Potential or Greater Initiated Systems Success Severe Core Damage No Yes till 411111114No No NSIC 104379 -

Sequence of Interest.for Earthquake occurrence at Humboldt Bay

CATEGORIZATION OF ACCIDENT SEQUENCE PRECURSORS NSIC ACCESSION NUMBER:

104379 DATE OF LER:

July 3, 1975 DATE OF EVENT: June 7, 1975 SYSTEM INVOLVED:

N.A.

COMPONENT INVOLVED:

N.A.

CAUSE:

Earthquake SEQUENCE OF INTEREST:

Unique ACTUAL OCCURRENCE:

Earthquake occurs at Humboldt Bay REACTOR NAME:

Humboldt Bay DOCK<ET NUMBER:

50-133 REACTOR TYPE: BWR DESIGN ELECTRICAL RATING:

50 MWe REACTOR ACE:

12.4 yr VENDOR:

General Electric ARCHITECT-ENGINEERS:

Bechtel OPERATORS:

Pacific Gas & Electric LOCATION:

Four miles South of Eureka DURATION:

N/A PLANT OPERATING CONDITION:

shutdown SAFETY FEATURE TYPE OF FAILURE:

(a) inadequate performance; (b) failed to start; (c) made inoperable; (d)____________

DISCOVERY METHOD:

plant transient COMMENT:

Operating basis is.25 g, the acceleration of experiment by the plant was.36 g.