Text

Pacifc Gas and

.1Ps Electric Company Lawrence F.Womack Diablo Canyon Power Plant Vice President P0. Box 56 Nuclear Services Avila Beach, CA 93424 805.545.4600 December 15, 2003 Fax: B05.545.4234 PG&E Letter HIL-03-003 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Docket No. 72-27 Humboldt Bay Independent Spent Fuel Storage Installation Submittal of Geotechnical and Probability Risk Assessment Calculation Packages

Dear Commissioners and Staff:

By Pacific Gas and Electric Company (PG&E) Letter HIL-03-001, dated December 15, 2003, PG&E submitted an application to the Nuclear Regulatory Commission (NRC) requesting a site-specific license for an Independent Spent Fuel Storage Installation at the Humboldt Bay Power Plant. The application included a Safety Analysis Report, Environmental Report, and other required documents in accordance with 10 CFR 72.

Pertinent geotechnical and probabilistic risk assessment calculations performed in support of the Humboldt Bay ISFSI license application are enclosed as 12 attachments. These calculation packages are intended for use by the NRC staff in their review of the application.

If you have any questions regarding the enclosed information, please contact Mr. Terence Grebel at (805) 545-4160.

Sincerely, Lawrence F. Womack gwh Enclosure cc: Humboldt Distribution cc:/enc James R. Hall (8) t ,;,SSC I

Enclosure PG&E Letter HIL-03-003 Sheet 1 of 1 LIST OF ATTACHED GEOTECHNICAL AND PROBABILISTIC RISK ASSESSMENT CALCULATION PACKAGES

1. Development of Maximum Credible Earthquake Magnitudes and Distances for the HBIP Calculation GEO HBIP 02.03, Revision 0
2. Development of Response Spectra for the HBPP ISFSI Calculation GEO HBIP 02.04, Revision 0
3. Development of HBIP ISFSI Spectrum Compatible Time Histories Calculation GEO HBIP 02.05, Revision 0
4. Site Amplification Factors for HBIP Calculation GEO HBIP 02.06, Revision 0
5. Determination of Potential Earthquake Induced Displacements of Critical Slides at HBIP ISFSI Site Calculation GEO HBIP 02.07, Revision 1
6. Determination of Potential Earthquake Induced Displacements of Critical Slides Along HBIP ISFSI Transport Route Calculation GEO HBIP 02.08, Revision 1
7. Development of HBIP ISFSI Refueling Building Spectrum Compatible Time Histories Calculation GEO HBIP 03.01, Revision 0
8. Amplification Factors for Probabilistic Seismic Hazard Analysis at the HBIP ISFSI Site Calculation GEO HBIP 03.02, Revision 0
9. Development of Probabilistically Based Spectra for HBIP ISFSI Site Calculation GEO HBIP 03.04, Revision 0
10. Risk Assessment of Turbine Missiles While Transporting Loaded Casks on the Humboldt Bay Transport Route Calculation PRA03-12, Revision 0
11. Risk Assessment of Explosive Hazards to the Dry Cask/Spent Fuel Transportation and Storage at the Humboldt Bay ISFS Calculation PRA03-13, Revision 0
12. Risk Assessment of Aircraft Hazard for Dry Cask/Spent Fuel Transportation and Storage for Humboldt Bay ISFSI Calculation PRA03-14, Revision 0