Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML23278A0462 October 2023General Atomics, Request to Terminate Certificate of Compliance No. 9226 for the GA-4 Shipping Package; Package Identification No. USA/9226/B(U)F-85
ML21302A10715 October 2021Enclosure 4 - Affidavit for Proprietary Information
ML21246A27018 May 2021Email from P. Pater, Ga, to M. Doell, NRC - Ga Triga Fssr Clarification Items
ML21246A26418 May 2021Triga Pipe Filled Cyl Surface External Dose Case Summary of Case 1
ML21246A2655 May 2021Triga Sr-90/Cs-137 Ratio Tables
ML21246A2584 May 2021Resrad Triga Buried Pipe Surface Soil - Scenario 2 New Sr-90 Ratio
ML21316A03727 April 2021Enclosure 4 - Affidavit for Proprietary Information
ML21246A27126 February 2021Email from P. Pater, Ga, to M. Doell, NRC - Preliminary NRC Musings on the Ga Fssr
ML21246A26825 February 2021Attachment L Page 1 Su 1 and Su 12 Volumetric Sample Results
ML21056A09119 February 2021General Atomics, Request for Renewal of Certificate of Compliance for the TRIGA-1 Shipping Casks
ML21036A3014 February 2021Enclosure 4: General Atomics - Affidavit
ML21246A2563 February 2021GA-12-CONC-33-2 - General Atomics Spectrum Analysis Report
ML21012A27631 December 2020Attachment G - General Atomics Triga Reactor Fssr Gamma Spectroscopy Results
ML21012A27531 December 2020Attachment a - General Atomics Triga Reactor Fssr Survey Unit Map
ML21012A27431 December 2020Final Status Survey Report (Fssr) for the General Atomics Triga Reactor Facility
ML21012A27314 December 2020General Atomics Triga Reactor Facility Final Status Survey Report -Cover Letter
ML20318A34910 November 2020Enclosure 5 - Affidavit for Proprietary Information
ML21246A26623 September 2020Triga Buried Pipe Surface Soil - Scenario 2 Final 9-23-20
ML21246A26323 September 2020Triga Final Buried Pipe Scenario 1
ML21246A25923 September 2020Case Summary of Scenario 3 Worker External Exposure
ML20049A0395 February 2020Submittal of General Atomics Triga Reactor Facility Final Status Survey Plan (Fssp), Revision 2, Dated February 5, 2020
ML20035F64031 January 2020E-mails Providing Clarification Related to Withholding from Public Disclosure of Documents Submitted by General Atomics Related to the University of Massachusetts Lowell
ML20017A1558 January 2020Request by General Atomics to Withhold Certain Information from Public Disclosure Under 10CFR2.390
ML20017A1516 January 2020E117-1017, Rev 1, Operations and Maintenance Manual NMP-1000 Linear Power Channel - Redacted
ML20017A1476 January 2020T9S900D970-SWP-2, Rev a, Triga Inl Channels Software Development Plan - Redacted
ML20017A1466 January 2020T9S900D970-CMP, Rev a, Triga Inl Software Configuration Management Plan - Redacted
ML20017A1456 January 2020T9S900SQAP, Rev B, Software Quality Assurance Plan - Redacted
ML21246A26012 December 2019Ta 11 Client Soil Sample Results
ML19347A42610 December 2019General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C)Post Accident Monitoring
ML21246A2614 November 2019Ta Client Pipe Scale Results
ML21246A27225 October 2019Ga Gamma Spectrum Analysis Outside Pipe Scale Report
ML20072H33618 September 2019Amended General Atomics Quality Assurance Topical ReportNondestructive Examination
ML19266A50917 September 2019General Atomics Triga Reactor Facility Final Status Survey Plan, Revision 1
ML21246A25517 September 2019Letter to M. Doell, NRC, from M. Grogan, Ga - Submittal of General Atomics Triga Reactor Facility Final Status Survey Plan (Fssp), Revision 1
ML21246A25319 August 2019Ga Gamma Spectrum Analysis Pipe Inner Scale Report
ML19247C58615 July 2019Triga Reactor Facility Final Status Survey Plan - July 2019
ML21246A26918 April 2019DDI-001-JSG-19 Final Update to 06/30/2019 and Application of Radionuclide Scaling Factors for Bldg. 21 04-18-2019 - Signed
ML19079A24618 March 2019Submittal of General Atomics Triga Mark 1 and Mark F Annual Reports for Calendar Year 2018 (3 Copies Each)
ML18303A12419 March 2018General Atomics Triga Mark I and Mark F Annual Reports for 2017
ML17292A05312 October 201730441R00045, Rev. B, Reactor-Based Molybdenum-99 Supply System Project, Target Cooling System Flow Test Report. Redacted Version
ML17249A08026 July 2017General Atomics - Submittal of Request to Withhold Certain Information from Public Disclosure Under 10CFR2.390
ML18303A17217 March 2017General Atomics Triga Mark I and Mark F Annual Reports for 2016
ML17132A2467 February 2017Redacted Attachment 8: General Atomics 30441R00017, Rev. C, Reactor-Based Molybdenum-99 Supply System Project, Ansys Target Cartridge, Housing Structural Analysis Design Calculation Report.Finite Element Analysis
Fuel cladding
Flow Induced Vibration
ML17132A24527 January 2017Redacted Attachment 7: General Atomics 30441R00032, Rev. B, Reactor-Based Molybdenum-99 Supply System Project, Relap Accident Analysis and Fraptran Target Rod Transient Analysis Design Calculation Report.Coatings
Power change
ML17089A23727 January 201730441R00017, Revision C, Ansys Target Cartridge, Housing Structural Analysis Design Calculation Report.Finite Element Analysis
Fuel cladding
Flow Induced Vibration
ML17089A23527 January 201730441R00032, Revision B, Relap Accident Analysis and Fraptran Target Rod Transient Analysis Design Calculation ReportCoatings
Power change
ML17089A23127 January 201730441R00022, Revision B, Source Term Analysis Design Calculation Report.
ML17132A24324 January 2017Redacted Attachment 5: General Atomics 30441R00022, Rev. B, Reactor-Based Molybdenum-99 Supply System Project, Source Term Analysis Design Calculation Report.
ML17132A24419 January 2017Redacted Attachment 6: General Atomics 30441R00031, Rev. B, Reactor-Based Molybdenum-99 Supply System Project, Mo-99 Target Assembly Nuclear Design for Once-Through Operation.
ML18022A26011 January 201730441R00030, Revision a, Mo-99 Target Cooling System Eismic Analysis Design Calculation Report.Earthquake