Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML23278A046 | 2 October 2023 | General Atomics, Request to Terminate Certificate of Compliance No. 9226 for the GA-4 Shipping Package; Package Identification No. USA/9226/B(U)F-85 | |
ML21302A107 | 15 October 2021 | Enclosure 4 - Affidavit for Proprietary Information | |
ML21246A270 | 18 May 2021 | Email from P. Pater, Ga, to M. Doell, NRC - Ga Triga Fssr Clarification Items | |
ML21246A264 | 18 May 2021 | Triga Pipe Filled Cyl Surface External Dose Case Summary of Case 1 | |
ML21246A265 | 5 May 2021 | Triga Sr-90/Cs-137 Ratio Tables | |
ML21246A258 | 4 May 2021 | Resrad Triga Buried Pipe Surface Soil - Scenario 2 New Sr-90 Ratio | |
ML21316A037 | 27 April 2021 | Enclosure 4 - Affidavit for Proprietary Information | |
ML21246A271 | 26 February 2021 | Email from P. Pater, Ga, to M. Doell, NRC - Preliminary NRC Musings on the Ga Fssr | |
ML21246A268 | 25 February 2021 | Attachment L Page 1 Su 1 and Su 12 Volumetric Sample Results | |
ML21056A091 | 19 February 2021 | General Atomics, Request for Renewal of Certificate of Compliance for the TRIGA-1 Shipping Casks | |
ML21036A301 | 4 February 2021 | Enclosure 4: General Atomics - Affidavit | |
ML21246A256 | 3 February 2021 | GA-12-CONC-33-2 - General Atomics Spectrum Analysis Report | |
ML21012A276 | 31 December 2020 | Attachment G - General Atomics Triga Reactor Fssr Gamma Spectroscopy Results | |
ML21012A275 | 31 December 2020 | Attachment a - General Atomics Triga Reactor Fssr Survey Unit Map | |
ML21012A274 | 31 December 2020 | Final Status Survey Report (Fssr) for the General Atomics Triga Reactor Facility | |
ML21012A273 | 14 December 2020 | General Atomics Triga Reactor Facility Final Status Survey Report -Cover Letter | |
ML20318A349 | 10 November 2020 | Enclosure 5 - Affidavit for Proprietary Information | |
ML21246A266 | 23 September 2020 | Triga Buried Pipe Surface Soil - Scenario 2 Final 9-23-20 | |
ML21246A263 | 23 September 2020 | Triga Final Buried Pipe Scenario 1 | |
ML21246A259 | 23 September 2020 | Case Summary of Scenario 3 Worker External Exposure | |
ML20049A039 | 5 February 2020 | Submittal of General Atomics Triga Reactor Facility Final Status Survey Plan (Fssp), Revision 2, Dated February 5, 2020 | |
ML20035F640 | 31 January 2020 | E-mails Providing Clarification Related to Withholding from Public Disclosure of Documents Submitted by General Atomics Related to the University of Massachusetts Lowell | |
ML20017A155 | 8 January 2020 | Request by General Atomics to Withhold Certain Information from Public Disclosure Under 10CFR2.390 | |
ML20017A151 | 6 January 2020 | E117-1017, Rev 1, Operations and Maintenance Manual NMP-1000 Linear Power Channel - Redacted | |
ML20017A147 | 6 January 2020 | T9S900D970-SWP-2, Rev a, Triga Inl Channels Software Development Plan - Redacted | |
ML20017A146 | 6 January 2020 | T9S900D970-CMP, Rev a, Triga Inl Software Configuration Management Plan - Redacted | |
ML20017A145 | 6 January 2020 | T9S900SQAP, Rev B, Software Quality Assurance Plan - Redacted | |
ML21246A260 | 12 December 2019 | Ta 11 Client Soil Sample Results | |
ML19347A426 | 10 December 2019 | General Atomics - Reportable Occurrence Under 10CFR21: Reported Failure in Analog High Range Radiation Monitor (RP-2C) | Post Accident Monitoring |
ML21246A261 | 4 November 2019 | Ta Client Pipe Scale Results | |
ML21246A272 | 25 October 2019 | Ga Gamma Spectrum Analysis Outside Pipe Scale Report | |
ML20072H336 | 18 September 2019 | Amended General Atomics Quality Assurance Topical Report | Nondestructive Examination |
ML19266A509 | 17 September 2019 | General Atomics Triga Reactor Facility Final Status Survey Plan, Revision 1 | |
ML21246A255 | 17 September 2019 | Letter to M. Doell, NRC, from M. Grogan, Ga - Submittal of General Atomics Triga Reactor Facility Final Status Survey Plan (Fssp), Revision 1 | |
ML21246A253 | 19 August 2019 | Ga Gamma Spectrum Analysis Pipe Inner Scale Report | |
ML19247C586 | 15 July 2019 | Triga Reactor Facility Final Status Survey Plan - July 2019 | |
ML21246A269 | 18 April 2019 | DDI-001-JSG-19 Final Update to 06/30/2019 and Application of Radionuclide Scaling Factors for Bldg. 21 04-18-2019 - Signed | |
ML19079A246 | 18 March 2019 | Submittal of General Atomics Triga Mark 1 and Mark F Annual Reports for Calendar Year 2018 (3 Copies Each) | |
ML18303A124 | 19 March 2018 | General Atomics Triga Mark I and Mark F Annual Reports for 2017 | |
ML17292A053 | 12 October 2017 | 30441R00045, Rev. B, Reactor-Based Molybdenum-99 Supply System Project, Target Cooling System Flow Test Report. Redacted Version | |
ML17249A080 | 26 July 2017 | General Atomics - Submittal of Request to Withhold Certain Information from Public Disclosure Under 10CFR2.390 | |
ML18303A172 | 17 March 2017 | General Atomics Triga Mark I and Mark F Annual Reports for 2016 | |
ML17132A246 | 7 February 2017 | Redacted Attachment 8: General Atomics 30441R00017, Rev. C, Reactor-Based Molybdenum-99 Supply System Project, Ansys Target Cartridge, Housing Structural Analysis Design Calculation Report. | Finite Element Analysis Fuel cladding Flow Induced Vibration |
ML17132A245 | 27 January 2017 | Redacted Attachment 7: General Atomics 30441R00032, Rev. B, Reactor-Based Molybdenum-99 Supply System Project, Relap Accident Analysis and Fraptran Target Rod Transient Analysis Design Calculation Report. | Coatings Power change |
ML17089A237 | 27 January 2017 | 30441R00017, Revision C, Ansys Target Cartridge, Housing Structural Analysis Design Calculation Report. | Finite Element Analysis Fuel cladding Flow Induced Vibration |
ML17089A235 | 27 January 2017 | 30441R00032, Revision B, Relap Accident Analysis and Fraptran Target Rod Transient Analysis Design Calculation Report | Coatings Power change |
ML17089A231 | 27 January 2017 | 30441R00022, Revision B, Source Term Analysis Design Calculation Report. | |
ML17132A243 | 24 January 2017 | Redacted Attachment 5: General Atomics 30441R00022, Rev. B, Reactor-Based Molybdenum-99 Supply System Project, Source Term Analysis Design Calculation Report. | |
ML17132A244 | 19 January 2017 | Redacted Attachment 6: General Atomics 30441R00031, Rev. B, Reactor-Based Molybdenum-99 Supply System Project, Mo-99 Target Assembly Nuclear Design for Once-Through Operation. | |
ML18022A260 | 11 January 2017 | 30441R00030, Revision a, Mo-99 Target Cooling System Eismic Analysis Design Calculation Report. | Earthquake |