Category:Report
MONTHYEARML21246A2642021-05-18018 May 2021 Triga Pipe Filled Cyl Surface External Dose Case Summary of Case 1 ML21246A2652021-05-0505 May 2021 Triga Sr-90/Cs-137 Ratio Tables ML21246A2582021-05-0404 May 2021 Resrad Triga Buried Pipe Surface Soil - Scenario 2 New Sr-90 Ratio ML21246A2682021-02-25025 February 2021 Attachment L Page 1 Su 1 and Su 12 Volumetric Sample Results ML21246A2562021-02-0303 February 2021 GA-12-CONC-33-2 - General Atomics Spectrum Analysis Report ML21246A2662020-09-23023 September 2020 Triga Buried Pipe Surface Soil - Scenario 2 Final 9-23-20 ML21246A2632020-09-23023 September 2020 Triga Final Buried Pipe Scenario 1 ML21246A2592020-09-23023 September 2020 Case Summary of Scenario 3 Worker External Exposure ML20161A1892020-06-0808 June 2020 General Atomics 050-00163, Soil Sample Results 2020 ML20049A0392020-02-0505 February 2020 Submittal of General Atomics Triga Reactor Facility Final Status Survey Plan (Fssp), Revision 2, Dated February 5, 2020 ML21246A2602019-12-12012 December 2019 Ta 11 Client Soil Sample Results ML21246A2672019-11-26026 November 2019 5339-SR-01-0 Independent Confirmatory Survey Summary and Results for the General Atomics Triga Reactor Facility Building G21 and Associated Land Area, San Diego, California ML19337D3822019-11-26026 November 2019 General Atomics Confirmatory Survey Report from Orau ML21246A2612019-11-0404 November 2019 Ta Client Pipe Scale Results ML21246A2722019-10-25025 October 2019 Ga Gamma Spectrum Analysis Outside Pipe Scale Report ML19266A5092019-09-17017 September 2019 General Atomics Triga Reactor Facility Final Status Survey Plan, Revision 1 ML21246A2532019-08-19019 August 2019 Ga Gamma Spectrum Analysis Pipe Inner Scale Report ML19247C5492019-08-0202 August 2019 Orise Confirmatory Survey Plan - General Atomics Triga Reactor Facility ML15317A3402015-10-15015 October 2015 Oak Ridge Associated Universities (Orau), Letter Report for Analytical Results for Six (Four Concrete, One Metal, and One Soil) Samples Associated with General Atomics in San Diego, CA 2021-05-05
[Table view] Category:Technical
MONTHYEARML21246A2642021-05-18018 May 2021 Triga Pipe Filled Cyl Surface External Dose Case Summary of Case 1 ML21246A2652021-05-0505 May 2021 Triga Sr-90/Cs-137 Ratio Tables ML21246A2582021-05-0404 May 2021 Resrad Triga Buried Pipe Surface Soil - Scenario 2 New Sr-90 Ratio ML21246A2682021-02-25025 February 2021 Attachment L Page 1 Su 1 and Su 12 Volumetric Sample Results ML21246A2562021-02-0303 February 2021 GA-12-CONC-33-2 - General Atomics Spectrum Analysis Report ML21246A2662020-09-23023 September 2020 Triga Buried Pipe Surface Soil - Scenario 2 Final 9-23-20 ML21246A2632020-09-23023 September 2020 Triga Final Buried Pipe Scenario 1 ML21246A2592020-09-23023 September 2020 Case Summary of Scenario 3 Worker External Exposure ML20049A0392020-02-0505 February 2020 Submittal of General Atomics Triga Reactor Facility Final Status Survey Plan (Fssp), Revision 2, Dated February 5, 2020 ML21246A2602019-12-12012 December 2019 Ta 11 Client Soil Sample Results ML19337D3822019-11-26026 November 2019 General Atomics Confirmatory Survey Report from Orau ML21246A2672019-11-26026 November 2019 5339-SR-01-0 Independent Confirmatory Survey Summary and Results for the General Atomics Triga Reactor Facility Building G21 and Associated Land Area, San Diego, California ML21246A2612019-11-0404 November 2019 Ta Client Pipe Scale Results ML21246A2722019-10-25025 October 2019 Ga Gamma Spectrum Analysis Outside Pipe Scale Report ML19266A5092019-09-17017 September 2019 General Atomics Triga Reactor Facility Final Status Survey Plan, Revision 1 ML21246A2532019-08-19019 August 2019 Ga Gamma Spectrum Analysis Pipe Inner Scale Report ML19247C5492019-08-0202 August 2019 Orise Confirmatory Survey Plan - General Atomics Triga Reactor Facility 2021-05-05
[Table view] |