RBG-47956, Emergency Plan Revision 44

From kanterella
Jump to navigation Jump to search
Emergency Plan Revision 44
ML19156A160
Person / Time
Site: River Bend Entergy icon.png
Issue date: 05/28/2019
From: Schenk T
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RBG-47956
Download: ML19156A160 (2)


Text

r-1

-~1 Entergy Operations, Inc.

River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225-381-4177 Timothy Schenk Manager - Regulatory Assurance 10 CFR 50.54{q)

RBG-47956 May 28, 2019 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, DC 20555-0001

Subject:

River Bend Station Emergency Plan Revision 44 River Bend Station, Unit 1 NRC Docket No. 50-458 Renewed Facility Operating License No. NPF-47 In accordance with 10 CFR 50.4{b)(5), 10 CFR 50.54(q)(5), and 10 CFR 72.44(f), the River Bend Station Emergency Plan (EPlan) has been revised and is included in the Enclosure to this letter. Revision 44 of the EPlan became effective on May 16, 2019. A summary of the changes to the-EPlan is included with the Enclrn~ure to this letter.

In accordance with 10 CFR 50.54(q){3) and 10 CFR 72.44(f), a screening and evaluation of the changes to the EPlan wai:r performed. The screening and evaluation concluded that the changes do tiot reduce the effectiveness of the EPlan, and the EPlan continues to meet the standards of 10 CFR 50.47(b) and 10 CFR 50, Appendix E.

This letter does not contain any new commitments.

If you require additional information, please contact Mr. Tim Schenk at (225) 381-4177 or tschenk@entergy.com.

\

Tim Schenk TAS/baj

Enclosure:

River Bend Station Emergency Plan Revision 44

RBG-47956 Page 2 of 2 cc: NRC Regional Administrator - Region IV NRC Project Manager - River Bend Station NRC Senior Resident Inspector - River Bend Station NRC Director, Division of Spent Fuel Management, Office of Nuclear Material Safety and Safeguards Louisiana Department of Environmental Quality Public Utility Commission of Texas