Press Release-IV-08-019, NRC to Discuss 2007 Performance Assessment for Callaway Nuclear Plant

From kanterella
Jump to navigation Jump to search
Press Release-IV-08-019: NRC to Discuss 2007 Performance Assessment for Callaway Nuclear Plant
ML081370178
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/16/2008
From:
Office of Public Affairs Region IV
To:
Category:Press Release
References
Press Release-IV-08-019
Download: ML081370178 (2)


Text

NRC NEWS U.S. NUCLEAR REGULATORY COMMISSION Office of Public Affairs Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011-4125 Telephone: (817) 860-8128 No. IV-08-019 May 16, 2008

Contact:

Victor Dricks E-Mail: opa4@nrc.gov Phone: (817) 860-8128 NRC TO DISCUSS 2007 PERFORMANCE ASSESSMENT FOR CALLAWAY NUCLEAR PLANT The Nuclear Regulatory Commission staff will meet in Fulton, Mo., on May 29, with representatives of AmerenUE, to discuss the agency=s assessment of safety performance for last year at the Callaway nuclear plant.

The meeting, which will be open to the public, is scheduled to begin at 6:30 p.m. at the Burton Business Building, Classroom 6, William Woods University, One University Ave., in Fulton.

In addition to the performance assessment, the NRC staff will be available to answer questions from the public on the safety performance of Callaway, as well as the NRC=s role in ensuring safe plant operation.

AThe NRC continually reviews the performance of Callaway and the nation=s other commercial nuclear power facilities,@ NRC Region IV Administrator Elmo E. Collins said. AThis meeting will provide an opportunity for a discussion of our annual assessment of safety performance with the company and with local officials and residents who live near the plant.@

A letter sent from the NRC Region IV office to plant officials addresses the performance of the plant during 2007 and will serve as the basis for the meeting discussion. It is available on the NRC web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/LETTERS/call_2007q4.pdf .

The NRC utilizes color-coded inspection findings and performance indicators to assess nuclear power plant performance. The colors start with "green" and then increase to "white,"

"yellow" or "red," commensurate with the safety significance of the issues involved.

The NRC said Callaway operated safely during 2007 and will receive regular, or baseline inspections during 2008.

Routine inspections are performed by two NRC Resident Inspectors assigned to the plant and by inspection specialists from the Region IV Office in Arlington, Texas.

Current performance information for Callaway is available on the NRC web site at:

http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/CALL/call_chart.html .

NRC news releases are available through a free list serve subscription at the following Web address:

http://www.nrc.gov/public-involve/listserver.html . The NRC homepage at www.nrc.gov also offers a SUBSCRIBE link. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web site.