MONTHYEARML20056G3571993-08-20020 August 1993 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS 3/4.6.1.5, Primary Containment Structural Integrity & Adding TS Administration Controls Section 6.2.F.6,requiring That ISI Program for Post Tensioning Tendons Be Established Project stage: Request ML20058H6491993-12-0202 December 1993 Requests Addl Info Re TS Change Deleting Section 3/4.6.1.5, Primary Containment Structural Integrity, for Plant Units 1 & 2 Project stage: Other 1993-12-02
[Table View] |
|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20210R3501999-08-13013 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,allowing Performance of CRDM & Ni Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling, While Fuel Is in Reactor Vessel ML20210Q3951999-08-0606 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3/4.6.4, Vacuum Relief, by Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers ML20209G3551999-07-14014 July 1999 Application for Amends to Licenses NPF-11 & NPF-18 to Revise TS Allowing Both LaSalle County Units to Operate at Uprated Power Level of 3489 Mwt.Proprietary Rev 2 to NEDC-32701P, Power Uprate Sar..., Encl.Proprietary Encl Withheld ML20209D3881999-07-0707 July 1999 Suppl Application for Amends to Licenses NPF-11 & NPF-18, Changing Proposed Degradation Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable,Per 981109 Application ML20209D3171999-07-0707 July 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising MCPR Safety Limit & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20206T1331999-05-19019 May 1999 Application for Amends to Licenses NPF-11 & NPF-18, Relocating TS Section 3/4.4.4, Chemistry, to UFSAR to Be Consistent with NUREG-1433,rev 1 ML20206J6921999-05-0505 May 1999 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Basis for Evaluation of Vr Exhaust Plenum Masonry Walls for Plant.With One Oversize Drawing ML20195E0471998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value in TS 3/4.3.3 & TS Table 3.3.3-2 ML20195D9931998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Add Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer Valve Rooms ML20154M4551998-10-16016 October 1998 Application for Amends to Licenses NPF-11 & NPF-18,lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect.Proprietary Rev 1,suppl 1 to NEDC-31531P,encl.Proprietary Info Withheld ML20217B5721998-04-16016 April 1998 Supplemental Application for Amend to License NPF-11, Changing Leak & Break Detection Isolation Instrumentation. Util Response to RAI & Rev 1 to Calculation L-001443,encl ML20217J2731998-03-24024 March 1998 Application for Amends to Licenses NPF-11 & NPF-18,deleting License Condition 2.C.(30)(a) in Entirety & Revising TS 6.1-3 ML20203G4871997-12-12012 December 1997 Application for Amends to Licenses NPF-11 & NPF-18,modifying Bypass Logic for Msli Valve Isolation Actuation Instrumentation on Condenser Low Vacuum as Stated in Note of TS Tables 3.3.2-1 & 4.3.2.1-1 ML20199K5181997-11-24024 November 1997 Application for Amend to License NPF-11,adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for RWCU Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms. W/Environ Assessment Statement & Calculations ML20211P9171997-10-15015 October 1997 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Unnecessary Details from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3581997-09-26026 September 1997 Application for Amends to Licenses NPF-11 & NPF-18,adding Ventilation Filter Testing Program ML20141J5521997-08-12012 August 1997 Application for Amends to Licenses NPF-11 & NPF-18,proposing Deletion of Surveillance Requirement 4.7.1.3.c & Addressing Sedimentation Concerns in Intake Structure Under Svc Water Performance Monitoring Program,Iaw GL 89-13 ML20148Q4161997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Reflect Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation ML20148U2551997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases ML20141L0311997-05-27027 May 1997 Application for Amends to Licenses NPF-11 & NPF-18, Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administration Changes ML20137W5071997-04-14014 April 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing TS to Reflect Design Change to Trip Logic for Feedwater/Main Turbine Trip Sys Actuation Instrumentation for Reactor Vessel Water Level-High,Level 8 Trip Function ML20134A1781997-01-20020 January 1997 Application for Amends to Licenses NPF-11 & NPF-18, Requesting Relocation of Alarm Only Instrumentation Surveillance Requirements & Adding or Changing Action Statement for Selected TSs ML20135E6551996-12-0202 December 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising Section 3.4.2 SRV Configuration to Include Only 13 of Current 18 SRVs ML20129J4461996-10-31031 October 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Seismic Monitoring Instrumentation Requirements ML20116A9501996-07-15015 July 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising App A,Ts,Per 10CFR50.90 to Relocate Fire Protection Requirements of Listed TS Sections ML20113C8581996-06-21021 June 1996 Application for Amends to Licenses NPF-11 & NPF-18,including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0541996-04-16016 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Selected Response Time Testing Requirements ML20107A8351996-04-0808 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Reflecting Transition of Fuel Supplier from GE to Siemens Power Corp.Nonproprietary & Proprietary Versions of EMF-94-217,Rev 1 Repts Encl.Proprietary Rept Withheld ML20097D6451996-02-0909 February 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising TS to Support Elimination of MSIV Leakage Control Sys & Instead Use MSL Drains & Condenser to Process MSIV Leakage ML20096G3261996-01-18018 January 1996 Application for Amends to Licenses NPF-11 & NPF-18,changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High ML20095K6931995-12-21021 December 1995 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS LCO 3.4.2,Action Statement B ML20093D4251995-10-0202 October 1995 Application for Amend to License NPF-11,revising SRV Safety Function Lift Setting Tolerance.Nonproprietary & Proprietary Versions of GE SRV Setpoint Tolerance Relaxation Analysis Encl.Proprietary Analysis Withheld ML20091P8901995-08-28028 August 1995 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating MSIV Leakage Control Sys & Increasing MSIV Leakage Limits,Including Request for Exemption for MSIV Leakages from Acceptance Test Criteria in App J of 10CFR50 ML20084U2921995-06-0808 June 1995 Application for Amends to Licenses NPF-11,NPF-18,NPF-72, NPF-77,NPF-37 & NPF-66.Amends Would Revise SRs & Administrative Requirements Associated W/Edgs ML20084C2221995-05-23023 May 1995 Application for Amends to Licenses NPF-11 & NPF-18, Clarifying Described Equipment out-of-svc Options ML20083P6211995-05-19019 May 1995 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Requirement That Verifies Each Fire Protection Valve in Correct Position at Least Once Per 31 Days ML20082J9261995-04-11011 April 1995 Application for Amends to Licenses NPF-11 & NPF-18,extending Specific 18 Month TS Surveillance Requirements to Allow Surveillance Testing ML20087H7851995-03-31031 March 1995 Application for Amend to License NPF-18,revising SRV Safety Function Lift Setting Tolerances.Nonproprietary & Proprietary GE SRV Setpoint Relaxation Analysis Encl. Proprietary GE SRV Setpoint Relaxation Analysis Withheld ML20078H1441995-01-30030 January 1995 Application for Amend to License NPF-18,requesting Emergency Amend to TS 3.3.1,for One Time Extension of Functional Test for Main Steam Line Isolation Valve - Closure Scram Functional Unit in RPS ML20077S2901995-01-13013 January 1995 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Pressure Alarm Setpoint Allowable Values for ECCS & RCIC Sys Keep Filled Pressure Instrumentation Channels ML20078R7031994-12-14014 December 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Minimize Unnecessary Testing & Excessively Restrictive AOT for Certain Actuation Instrumentation. Rev 3 to MDE-83-0485 & Rev 1 to RE-025 Encl.Encls Withheld ML20078B9491994-10-24024 October 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3.6.Exemption Requests from 10CFR50,App J Requirements Encl ML20069J7671994-06-0909 June 1994 Application for Amends to Licenses NPF-11 & NPF-18, Implementing Partial Application of GE ARTS Program.Ge Proprietary Rept NEDC-31531P, ARTS Improvements Program Analysis... Encl.Rept Withheld (Ref 10CFR2.790(b)) ML20065A1871994-03-22022 March 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS 3/4.6.1.5, Primary Containment Structural Integrity ML20063F3081994-01-28028 January 1994 Application for Exigent Amends to Licenses NPF-11 & NPF-18, Revising TS 3.3.1 & 3.3.4 to Extend Surveillance Test Interval from Monthly to Quarterly.Ge Proprietary TS Improvement Analysis Encl.Ge Proprietary Analysis Withheld ML20063E1631994-01-24024 January 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting Requirement for Response Time Testing Where Required Time Corresponds to Diesel Start Time from TS Table 3.3.2-3,per Line Item 5 of GL 93-05 & NUREG-1366 ML20063B2311994-01-21021 January 1994 Suppl to 931228 Application for Amends to Licenses NPF-11 & NPF-18,changing TS Bases Section B 3/4 2-6 to Include Ref to Plant LOCA Analysis Performed by GE ML20058K3371993-12-10010 December 1993 Application for Exigent Amend to License NPF-11,revising TS 3.4.2, Safety Relief Valves, Adding Footnote to Exempt Safety/Relief Valves 1B21-F013B & 1B21-F013F from Requirements of TS 4.0.3 ML20058A8661993-11-17017 November 1993 Application for Emergency Amends to Licenses NPF-11 & NPF-18,requesting NRC Approval of USQ Re Existing Condition for Which Operator Action Proposed for Tripping Mechanical Vacuum Pump in Place of Automatic Trip ML20058A2591993-11-10010 November 1993 Application for Amends to Licenses NPF-37,NPF-66,NPF-72, NPF-77,DPR-39,DPR-48,NPF-11 & NPF-18 Re Limitations on Radioactive Matl Released in Liquid Effluents,New 10CFR21 & Radioactive Matl Released in Gaseous Effluents 1999-08-06
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20210R3501999-08-13013 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,allowing Performance of CRDM & Ni Replacement to Not Be Considered Core Alterations During Operational Condition 5,Refueling, While Fuel Is in Reactor Vessel ML20210Q3951999-08-0606 August 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3/4.6.4, Vacuum Relief, by Removing Specific Operability Requirements Related to Position Indication for Suppression chamber-drywell Vacuum Breakers ML20209G3551999-07-14014 July 1999 Application for Amends to Licenses NPF-11 & NPF-18 to Revise TS Allowing Both LaSalle County Units to Operate at Uprated Power Level of 3489 Mwt.Proprietary Rev 2 to NEDC-32701P, Power Uprate Sar..., Encl.Proprietary Encl Withheld ML20209D3171999-07-0707 July 1999 Application for Amends to Licenses NPF-11 & NPF-18,revising MCPR Safety Limit & Adding Approved Siemens Power Corp Methodology List of TRs for COLR ML20209D3881999-07-0707 July 1999 Suppl Application for Amends to Licenses NPF-11 & NPF-18, Changing Proposed Degradation Voltage Low Limit Setpoint & Adding High Limit Setpoint & Allowable,Per 981109 Application ML20206T1331999-05-19019 May 1999 Application for Amends to Licenses NPF-11 & NPF-18, Relocating TS Section 3/4.4.4, Chemistry, to UFSAR to Be Consistent with NUREG-1433,rev 1 ML20206J6921999-05-0505 May 1999 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Basis for Evaluation of Vr Exhaust Plenum Masonry Walls for Plant.With One Oversize Drawing ML20195E0471998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Modify Degraded Voltage Second Level Undervoltage Relay Setpoint & Allowable Value in TS 3/4.3.3 & TS Table 3.3.3-2 ML20195D9931998-11-0909 November 1998 Application for Amends to Licenses NPF-11 & NPF-18,to Add Automatic Primary Containment Isolation on Ambient & Differential Temperature to High for RWCU Sys Pump,Pump Valve,Holdup Pipe & Filter/Demineralizer Valve Rooms ML20154M4551998-10-16016 October 1998 Application for Amends to Licenses NPF-11 & NPF-18,lowering Power Level Below Which TCV & TSV Closure Scram Signals & EOC-RPT Signal Are Not in Effect.Proprietary Rev 1,suppl 1 to NEDC-31531P,encl.Proprietary Info Withheld ML20217B5721998-04-16016 April 1998 Supplemental Application for Amend to License NPF-11, Changing Leak & Break Detection Isolation Instrumentation. Util Response to RAI & Rev 1 to Calculation L-001443,encl ML20217J2731998-03-24024 March 1998 Application for Amends to Licenses NPF-11 & NPF-18,deleting License Condition 2.C.(30)(a) in Entirety & Revising TS 6.1-3 ML20203G4871997-12-12012 December 1997 Application for Amends to Licenses NPF-11 & NPF-18,modifying Bypass Logic for Msli Valve Isolation Actuation Instrumentation on Condenser Low Vacuum as Stated in Note of TS Tables 3.3.2-1 & 4.3.2.1-1 ML20199K5181997-11-24024 November 1997 Application for Amend to License NPF-11,adding Automatic Primary Containment Isolation on Ambient & Differential Temp High for RWCU Pump,Pump Valve,Holdup Pipe & F/D Valve Rooms. W/Environ Assessment Statement & Calculations ML20211P9171997-10-15015 October 1997 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Unnecessary Details from Accident Monitoring Instrumentation Surveillance Requirements ML20217C3581997-09-26026 September 1997 Application for Amends to Licenses NPF-11 & NPF-18,adding Ventilation Filter Testing Program ML20141J5521997-08-12012 August 1997 Application for Amends to Licenses NPF-11 & NPF-18,proposing Deletion of Surveillance Requirement 4.7.1.3.c & Addressing Sedimentation Concerns in Intake Structure Under Svc Water Performance Monitoring Program,Iaw GL 89-13 ML20148U2551997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing Definition of Channel Calibration & Correcting Miscellaneous Errors in TS & Bases ML20148Q4161997-07-0101 July 1997 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Reflect Improvements Made to Control Room Ventilation Air Intake Radiation Monitoring Sys Logic to Reduce Spurious Actuation of Emergency Filtration Mode of Operation ML20141L0311997-05-27027 May 1997 Application for Amends to Licenses NPF-11 & NPF-18, Incorporating Restructured Station Organization,Change to Submittal Frequency of Radiological Effluent Release Rept & Other Administration Changes ML20137W5071997-04-14014 April 1997 Application for Amends to Licenses NPF-11 & NPF-18,changing TS to Reflect Design Change to Trip Logic for Feedwater/Main Turbine Trip Sys Actuation Instrumentation for Reactor Vessel Water Level-High,Level 8 Trip Function ML20134A1781997-01-20020 January 1997 Application for Amends to Licenses NPF-11 & NPF-18, Requesting Relocation of Alarm Only Instrumentation Surveillance Requirements & Adding or Changing Action Statement for Selected TSs ML20135E6551996-12-0202 December 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising Section 3.4.2 SRV Configuration to Include Only 13 of Current 18 SRVs ML20129J4461996-10-31031 October 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Seismic Monitoring Instrumentation Requirements ML20116A9501996-07-15015 July 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising App A,Ts,Per 10CFR50.90 to Relocate Fire Protection Requirements of Listed TS Sections ML20113C8581996-06-21021 June 1996 Application for Amends to Licenses NPF-11 & NPF-18,including Extension of 18 Month Surveillance Interval & One Time Change to TS to Extend AOT for Each Subsystem of CR & Auxiliary Electric Equipment Room Emergency Filtration Sys ML20107F0541996-04-16016 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating Selected Response Time Testing Requirements ML20107A8351996-04-0808 April 1996 Application for Amends to Licenses NPF-11 & NPF-18, Reflecting Transition of Fuel Supplier from GE to Siemens Power Corp.Nonproprietary & Proprietary Versions of EMF-94-217,Rev 1 Repts Encl.Proprietary Rept Withheld ML20097D6451996-02-0909 February 1996 Application for Amends to Licenses NPF-11 & NPF-18,revising TS to Support Elimination of MSIV Leakage Control Sys & Instead Use MSL Drains & Condenser to Process MSIV Leakage ML20096G3261996-01-18018 January 1996 Application for Amends to Licenses NPF-11 & NPF-18,changing Setpoints for Automatic Primary Containment Isolation on MSL Tunnel Differential Temp High & Deleting Automatic Isolation Function on MSL Tunnel Temp High ML20095K6931995-12-21021 December 1995 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS LCO 3.4.2,Action Statement B ML20093D4251995-10-0202 October 1995 Application for Amend to License NPF-11,revising SRV Safety Function Lift Setting Tolerance.Nonproprietary & Proprietary Versions of GE SRV Setpoint Tolerance Relaxation Analysis Encl.Proprietary Analysis Withheld ML20091P8901995-08-28028 August 1995 Application for Amends to Licenses NPF-11 & NPF-18, Eliminating MSIV Leakage Control Sys & Increasing MSIV Leakage Limits,Including Request for Exemption for MSIV Leakages from Acceptance Test Criteria in App J of 10CFR50 ML20084U2921995-06-0808 June 1995 Application for Amends to Licenses NPF-11,NPF-18,NPF-72, NPF-77,NPF-37 & NPF-66.Amends Would Revise SRs & Administrative Requirements Associated W/Edgs ML20084C2221995-05-23023 May 1995 Application for Amends to Licenses NPF-11 & NPF-18, Clarifying Described Equipment out-of-svc Options ML20083P6211995-05-19019 May 1995 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Requirement That Verifies Each Fire Protection Valve in Correct Position at Least Once Per 31 Days ML20082J9261995-04-11011 April 1995 Application for Amends to Licenses NPF-11 & NPF-18,extending Specific 18 Month TS Surveillance Requirements to Allow Surveillance Testing ML20087H7851995-03-31031 March 1995 Application for Amend to License NPF-18,revising SRV Safety Function Lift Setting Tolerances.Nonproprietary & Proprietary GE SRV Setpoint Relaxation Analysis Encl. Proprietary GE SRV Setpoint Relaxation Analysis Withheld ML20078H1441995-01-30030 January 1995 Application for Amend to License NPF-18,requesting Emergency Amend to TS 3.3.1,for One Time Extension of Functional Test for Main Steam Line Isolation Valve - Closure Scram Functional Unit in RPS ML20077S2901995-01-13013 January 1995 Application for Amends to Licenses NPF-11 & NPF-18,to Revise Pressure Alarm Setpoint Allowable Values for ECCS & RCIC Sys Keep Filled Pressure Instrumentation Channels ML20078R7031994-12-14014 December 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TSs to Minimize Unnecessary Testing & Excessively Restrictive AOT for Certain Actuation Instrumentation. Rev 3 to MDE-83-0485 & Rev 1 to RE-025 Encl.Encls Withheld ML20078B9491994-10-24024 October 1994 Application for Amends to Licenses NPF-11 & NPF-18,revising TS Section 3.6.Exemption Requests from 10CFR50,App J Requirements Encl ML20069J7671994-06-0909 June 1994 Application for Amends to Licenses NPF-11 & NPF-18, Implementing Partial Application of GE ARTS Program.Ge Proprietary Rept NEDC-31531P, ARTS Improvements Program Analysis... Encl.Rept Withheld (Ref 10CFR2.790(b)) ML20065A1871994-03-22022 March 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting TS 3/4.6.1.5, Primary Containment Structural Integrity ML20063F3081994-01-28028 January 1994 Application for Exigent Amends to Licenses NPF-11 & NPF-18, Revising TS 3.3.1 & 3.3.4 to Extend Surveillance Test Interval from Monthly to Quarterly.Ge Proprietary TS Improvement Analysis Encl.Ge Proprietary Analysis Withheld ML20063E1631994-01-24024 January 1994 Application for Amends to Licenses NPF-11 & NPF-18,deleting Requirement for Response Time Testing Where Required Time Corresponds to Diesel Start Time from TS Table 3.3.2-3,per Line Item 5 of GL 93-05 & NUREG-1366 ML20063B2311994-01-21021 January 1994 Suppl to 931228 Application for Amends to Licenses NPF-11 & NPF-18,changing TS Bases Section B 3/4 2-6 to Include Ref to Plant LOCA Analysis Performed by GE ML20059E2681993-12-30030 December 1993 Amends 57,57,45,45,93,77,152 & 140 to Licenses NPF-37, NPF-66,NPF-72,NPF-77,NPF-11,NPF-18,DPR-39 & DPR-48, Respectively.Amends Change Instantaneous Limits for Radioactive Liquid & Gaseous Effluent Release Rates ML20058K3371993-12-10010 December 1993 Application for Exigent Amend to License NPF-11,revising TS 3.4.2, Safety Relief Valves, Adding Footnote to Exempt Safety/Relief Valves 1B21-F013B & 1B21-F013F from Requirements of TS 4.0.3 ML20058A8661993-11-17017 November 1993 Application for Emergency Amends to Licenses NPF-11 & NPF-18,requesting NRC Approval of USQ Re Existing Condition for Which Operator Action Proposed for Tripping Mechanical Vacuum Pump in Place of Automatic Trip 1999-08-06
[Table view] |
Text
\
[
- Crmm:nw alth Edisen 1400 Opus Place Downers Grove, Illinois 60515 10 CFR 50.90 August 20,1993 Dr. Thomas E. Murley, Director Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission i Washington, D.C. 20555 Attn: Document Control Desk e
Subject:
LaSalle County Station Units 1 and 2 Application for Amendment to Facility Operating Licenses NPF-11 and NPF-18, Appendix A, Technical Specifications ;
Deleting 3/4.6.1.5, " Primary Containment Structural Integrity" NRC Docket Nos 50-373 and 50-374 Dr. Murley:
Pursuant to 10 CFR 50.90, Commonwealth Edison Company (CECO) proposes i to amend Appendix A, Technical Specification of Facility Operating Licenses i NPF-11 and NPF-18. The purpose of this amendment request is to delete ;
Technical Specification Section 3/4.6.1.5, Primary Containment Structural i Integrity, which includes the Surveillance Requirements for the Primary .!
Containment Tendons. In place of this specification, Technical Specification Administrative Controls, Section 6.2.F.6 is being added to require a program to be established, implemented, and maintained. The program is titled, " Inservice Inspection Program for Post Tensioning Tendons". The program will be based on Regulatory Guide 1.35, Rev. 3, which will allow the Unit 1 and 2 primary containments to be tested as one containment, alternating the tests between the two containments. In order to satisfy the Regulatory Guide conditions for ;
alternating the tests, this amendment request also provides justification for an exception to the Regulatory Guide 1.35 exemption condition ofless than two years between the Initial Structural Integrity Tests (ISITs) for Unit 1 and 2. !
l CECO requests approval of this amendment request by October 15,1993 in order to support the current refuel outage planning for LaSalle Unit 2. If this amendment request is not approved prior to startup from the upcoming refuel !
outage for LaSalle Unit 2 (currently scheduled to be completed in November of l 1993), a separate forced shutdown would be required in 1994 in order to satisfy current Technical Specification requirements associated with Post Tensioning ;
I k:inla\dresden\ tendons.wpf\1 9309030038 930820 ADOCK05000373[p PDR a, I p PDR g gi I
I) i
_ _ . _ . . J
~
Dr. Murley August 20,1993 l Tendons. It is requested that the proposed changes be made effective upon [
issuance. ;
i I
The proposed amendment has been reviewed and approved by CECO On-Site and Off-Site Review committees in accordance with company procedures. l l
t To the best of knowledge and belief, the statements contained above are true l and correct. In some response these statements are not based on my personal }
knowledge, but obtained information furnished by other Commonwealth Edison employees, contractor employees, and consultants. Such information has been :
reviewed in accordance with company practice, and I believe it to be reliable.
Commonwealth Edison is notifying the State ofIllinois of this application for I amendment by transmitting a copy of this letter and its attachment to the i designated state oflicial. [
Please direct any questions you may have concerning this submittal to this !
office. !
Sincerely, state cf . county ofgP l re me on tnisE'4 d3V -
i sicped bep290 bl ot?'m 'kT gfJpgs,y-l__
Notary Pub!!c ~
~W Peterf L.j~Piet ~f l i
i
> Nuclear Licensing Administrator
. Attachments / Appendices: N' 1 l
i A. Description of Safety Analysis of the Proposed Changes l i
B. Marked-up Technical Specification Pages C. Evaluation of Significant Hazards Consideration
{
D. Environmental Assessment ,
E. Comparison of Current Technical Specification Requirements to the i Proposed Technical Specification requirements and the Inservice Inspection Program for Post Tensioning Tendons.
Appendix A. Justification for Exceptions to Regulatory Guide 1.35, Rev. 3. ;
Appendix B. Summary of the " Inservice Inspection Program for Post !
Tensioning Tendons.
l cc: J. B. Martin - Regional Administrator - RIII - - ~ ~ = ,
0 J. L. Kennedy - Project Manager - NRR [
D. Hills - Senior Resident Inspector - LCNPS f<ow$$$'g,{Pg[
3 m t smE or was Office of Nuclear Facility Safety - IDNS [a cancs EmmEs k:\nlaidresdenitendons.wpf2 ,
s
ATTACHNENT A DESCRIPTION OF SAFETY ANALYSIS OF THE PROPOSED CHANGES Desuiudon of the Prvuosed Chance i This Technical Specification Amendrnent Request deletes 3/4.6.1.5, Primary Containment Structural Integrity, which includes the Surveillance Requirements for the .
Primary Containnunt Tendons. In place of this specification, Technical Specification Administrative Controls, Section 6.2.F.6 is being added to require a program to be established, implemented, and nuintained. The program is titled, " Inservice Inspection Program for Post Tensioning Tendons". The program will be based on Regulatory Guide 1.35, Rev. 3, with an exemption to the condition requiring the containment ISITs to have been performed within two years to allow Commonwealth Edison Co. LaSalle County Station (LaSalle) Unit 1 and 2 primary containments to be tested as one containment, attemating the tests between the two containments. Also, a Surveillance Requirement is being added to specification 3/4.6.1.1 to verify the structural integrity of the Primary Containment in accordance with the Inservice Inspection Program for Post Tensioning Tendons.
Descrip6on of the Curmnt Operatina License / Technical Soecification Reauiement The Primary Containment Structural integrity Technical Specification provides operability requirements for the structure, primarily based on inservice inspection (ISI) and testing of containment tendons in accordance with Surveillance Requirement 4.6.1.5. Both Unit 1 and Unit 2 Technical Specifications require all testing and inspections to be performed each tirne the structural integrity is required to be demonstrated per 4.6.1.5. The only portion of the specification unrelated to tendons is ,
Surveillance Requirement 4.6.1.5.c.1, which requires a visual inspection of accessible interior and exterior surfaces of the Primary Containment during shutdown for each Tyoe A leakage rate test. Action statements include unit shutdown requirernents if structural integrity is not met.
Bases for the Current Reauirement As stated in the Bases for spedfication 3/4.6.1.5, this specification ensures that the structural integrity of the containment will be maintained comparable to the original design standards for the life of the facility. The surveillance requirements for the tendon testing and inspection, visual examination of the interior and exterior surfaces i of the containment, and the Type A leakage test are sufficient to demonstrate this k\nlaWesden\ tendons wpf\1 l
1 l
l l
ATTACHNENT A (continued) capability. The actions require restoration of integrity and performance of engineering evaluations, based on degradation of tendons and the condition of the concrete. A Special Report to the NRC is required conceming actions taken and the results of the associated evaluations perforned The surveillances are based on the Guidelines set in Regulatory Guide 1.35, Revision 2, January,1976 and proposed Revision 3 to Regulatory Guide 1.35, April,1979.
Descriotion of the Need for Amendina the Technical Specification Regulatory Guide 1.35, Rev.3, has exceptions to the ISI frequency of 1, 3, 5 and every 5 years thereafter for twin unit containments. The exception allows the units to be tested attemately, so that tests are performed (except for visual inspections and grease samples) every 10 years for each unit with approximately 5 years between the tests for the units combined. In order to implement this change in frequency, Surveillance Requirement 4.6.1.5 needs to be amended. One of the conditions listed in Regulatory Guide 1.35, Rev. 3, for treating the LaSalle Unit 1 an Unit 2 Primary Containments as twin containtmnts requires an exception:
"1.5.b. Their (the containments) ISITs were performed within two years of each other."
The ISITs for the LaSalle Unit 1 and Unit 2 Primary Containments were approximately 4.5 years apart. Hovever, complete ISIS of Unit 1 and Unit 2 performed to date demonstrate that this 2 year limit on ISITs is not a factor influencing LaSalle Unit 1 and Unit 2 tendon integrity. The bases for time between the ISITs and justification for this exception are provided in Appendix A. This exception and Technical Spedfication change is requested based on demonstrated tendon integrity during the past ISIS of the two units, and the Person-Rem and cost reduction that will result from the requested change.
Review of specification 3/4.6.1.5 detemined that this specification is redundant to specification 3/4.6.1.1, relative to containment structure integrity. Technical Specification 3.6.1.1, Primary Containment integrity, provides assurance of structural ,
integrity as vell as other aspects of the primary containment, including penetrations j and air lock operability. Specification 3.6.1.5 is thus redundant to specification 3.6.1.1 Surveillance Requirement 4.6.1.5, for monitoring tendon integrity and the evaluation, l corrective actions, and reporting requirements can be relocated to a program required k.\nla\dresden\ tendons wpfi2 l
i ATTACHVENT A (continued) by Technical Specification Administrative Controls section 6.2.F., except for :
Surveillance Requirement 4.6.1.5.c.1, visual inspection of Primary Containment surfaces.
The current Surveillance Requirement 4.6.1.5.c.1 is as follows: .
t
" Primary Containment Surfaces - The structural integrity of the exposed accessible interior and exterior surfaces of the primary containment shall be determined during !
the shutdown for, and prior to, each Type A containment leakage rate test by a visual inspection of these surfaces and verifying no apparent changes in i appearance or other abnormal degradation, e.g., widespread cracking, spalling and/or grease leakage."
This surveillance mixes two required inspections, one per Regulatory Guide 1.35, Rev. '
3, section C.3.1, which is as follows:
"The exterior surface of the containment should be visually examined to detect areas of large spall, severe scaling, D-cracking in an area of 25 square feet or more, other surface deterioration or disintegration, or grease leakage "
10 CFR 50, Appendix J:
Section lilA1, requires a Type A test pretest containment inspection as follows: j
"(a) Containment inspection in accordance with VA shall be performed as a prerequisite to the performance of Type A tests." :
Section V.A, Containment inspection, requires the following: j l "A general inspection of the accessible interior and exterior surfaces of the - !
containment structures and components shall be performed prior to any Type A test i to uncover any evidence of structural deterioration which may affect either the l containment structural integrity or leak-tightness if there is evidence of structural :
deterioration, Type A tes's shall not be performed until corrective action is taken in accordance with repair procedures, nondestructive examinations, and tests as j specified in the applicable code specified in @ 50.55a at the commencenwnt of )
repair work. Such structural deterioration and corrective actions taken shall be reported as part of the test report, submitted in accordan with V.B."
k-\rdakiresden\ tendons wpf\3
~
AUAC_BNENT A (continued)
The two inspections were apparentiy combined to make surveillance requirement 4.6.1.5.c.1. As can be seen from the above requirements for the inspections, the inspections differ in scope, inspection description, inspection frequency, actions, and acceptance criteria. We exterior inspection required by Regulatory Guide 1.35 is being induded in the Inservice inspection Program for Post Tensioning Tendons. We interior add exterior inspection required by 10 CFR 50, App. J will be induded in the surveillance procedure for Type A tests.
Descjption of the Amended Technical Specdicajon Reauimment Technical Specification 3/4.6.1.5 is being deleted, induding deletion of the associated Tables 4.6.1.5-1, Tendon Surveillance, and 4.6.1.5-2, Tendon Uft-off Force, and the associated Bases section, B 3/4.6.1.5. The following items are being added:
- 1. Section 6.2.F.6, inservice inspection Program for Post Tensioning Tendons, is being added to Technical Specification Administrative Controls section 6.2.F.
Bis program will indude testing and inspection requirements, frequency requirements, corrective actions, evaluation and reporting requirements for the primary containment tendons, in accordance with Regulatory Guide 1.35, Revision 3. Re visual inspection of the exterior concrete surfaces for signs of degradation is being induded in the program, to be performed as part of the required visual inspections given in Regulatory Guide 1.35, Rev. 3. The current requirement for the accessible interior and exterior surfaces of the containment structures and components during the shutdown for and prior to, each Type A containment leakage rate test, as required by 10 CFR 50, Appendix J, will be induded as a prerequisite in the Type A test procedure.
- 2. A Surveillance Requirement is being added to specification 3/4.6.1.1 to verify the structural integrity of the Primary Containment in accordance with the Inservice inspection Program for Post Tensioning Tendons. Re exception to Regulatory Guide 1.35, Rev. 3 allowing the Unit 1 and Unit 2 Primary Containments to be treated as twin containments is being added to the Bases section for specification 3/4.6.1.1.
- 3. A requirement to perform On-site Review of changes to the Inspection Program for Post Tensioning Tendons is being added to the Administrative Controls section 6.1.G.2.b.
1 kWa\dresden\ tendons wpm i
l
ATTACHMENT A (continued)
- 4. A requirement to retain records for the life of the plant of prestressed concrete containment tendon sunteillances is being added to the Administrative Controls section 6.5.B.
Bases for the Amended Technical Specification Reouest Type A leakage test is sufficient to assure that Primary Containment integrity is maintained. The tendon ISI and associated visual inspection of the exterior concrete surfaces of the containment supplements the Type A test to verify integrity is maintained. As such the tendon testing and concrete inspections are adequately covered by a program requirenent in section 6.2.F. The program will include all of the elements of the testing and inspections required by 4.6.1.5 and provide acceptance criteria, the content and frequency of reporting, and remedial actions when one or more of the acceptance criteria are not met, except for 4.6.1.5.c.1.
The differences between the program and the current specification are presented in Attachment E. Attachment E also includes a comparison between Regalatory Guide 1.35, Rev. 3, and the proposed program, with the bases for treating the LaSalle Unit 1 and Unit 2 as twin containments for ISI of the tendons, even though the initial Structural Integrity Tests (ISITs) were not performed within 2 years of each other.
Dese proposed changes are consistent with NUREG - 1434, Rev. O, New Standard Technical Specifications sedion 5.7.2.10.
Schedule Dis Technical Specification change is requested to support the schedule for the Unit 2 tendon testing and inspection, which is scheduled to be performed during the LaSalle Unit 2 fifth refuel outage (L2R05), which begins September 5,1993. The critical date for the Unit 2 tendon tests is June 4,1994. If this amendment request is not approved (including granting of the exception to Regulatory Guide 1.35, Rev. 3, section C.1.5.b, twin containment condition of "lSITs within 2 years") 3 months prior to the critical date, a LaSalle Unit 2 forced outage will be required to perform scheduled testing. Since, LaSalle Unit 1 sixth refuel outage (L1R06) is scheduled from 3/5/94 to 5/15/94, a dual unit outage would occur, with the associated increase in shutdown risk, j as well as increased Person-Rem exposure.
kWa\dresden\ tendons wpf6