L-16-366, LER 16-03-001 for Perry Nuclear Power Plant Loss of Safety Related Electrical Bus Results in a Loss of Shutdown Cooling
From kanterella
(Redirected from ML16364A210)
Jump to navigation
Jump to search
ML16364A210 | |
Person / Time | |
---|---|
Site: | Perry |
Issue date: | 12/21/2016 |
From: | Hamilton D FirstEnergy Nuclear Operating Co |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
L-16-366 LER 16-003-01 | |
Download: ML16364A210 (6) | |
Similar Documents at Perry | |
---|---|
Category:Letter type:L
MONTHYEARL-23-207, License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2024-01-24024 January 2024
[Table view]License Amendment Request (LAR) for Adoption of TSTF-264-A Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs L-24-017, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2024-01-24024 January 2024 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-171, CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency2023-12-0808 December 2023 CFR 50.55a Request Number VR-9. Revision 0, Feedwater Check Valve Exercising Test Frequency L-23-244, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-12-0606 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation L-23-238, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 202023-11-10010 November 2023 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 20 L-23-052, Submittal of the Updated Safety Analysis Report, Revision 232023-10-27027 October 2023 Submittal of the Updated Safety Analysis Report, Revision 23 L-23-206, Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD2023-09-12012 September 2023 Ohio National Pollutant Discharge Elimination System (NPDES) Permit 3IB00016 MD L-23-205, Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-09-12012 September 2023 Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-172, Quality Assurance Program Manual2023-08-31031 August 2023 Quality Assurance Program Manual L-23-001, License Amendment Request to Remove the Table of Contents from the Technical Specifications2023-08-0707 August 2023 License Amendment Request to Remove the Table of Contents from the Technical Specifications L-23-188, Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments2023-08-0707 August 2023 Energy Harbor Nuclear Corp., Supplement to Application for Order Consenting to Transfer of Licenses and Conforming License Amendments L-23-174, 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative2023-07-19019 July 2023 30-Day Voluntary Report in Accordance with Industry Groundwater Protection Initiative L-23-146, License Renewal Application for the Perry Nuclear Power Plant2023-07-0303 July 2023 License Renewal Application for the Perry Nuclear Power Plant L-23-051, Plan, Nineteenth Inservice Inspection Summary Report2023-06-22022 June 2023 Plan, Nineteenth Inservice Inspection Summary Report L-23-050, 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models2023-06-22022 June 2023 2022 Annual 10 CFR 50.46 Report of Changes to or Errors in Emergency Core Cooling System Evaluation Models L-22-249, License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener2023-06-0505 June 2023 License Amendment Request for Adoption of Technical Specification Task Force Traveler TSTF-276-A Revision 2, Change TS 3.8.1. AC Sources-Operating. to Clarify the Power Factor Requirements When Performing Diesel Gener L-23-134, Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-05-23023 May 2023 Response to NRC Regulatory Issue Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations L-23-065, Annual Financial Report2023-05-22022 May 2023 Annual Financial Report L-23-121, Annual Radiological Effluent Release Report2023-04-26026 April 2023 Annual Radiological Effluent Release Report L-23-122, Annual Radiological Environmental Operating Report2023-04-26026 April 2023 Annual Radiological Environmental Operating Report L-23-061, Submittal of the Decommissioning Funding Status Reports2023-03-31031 March 2023 Submittal of the Decommissioning Funding Status Reports L-23-049, Core Operating Limits Report for Operating Cycle 202023-03-30030 March 2023 Core Operating Limits Report for Operating Cycle 20 L-23-037, and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments2023-03-29029 March 2023 and Perry Nuclear Power Plant - Independent Spent Fuel Storage Installation Changes, Tests, and Experiments L-23-066, Annual Notification of Property Insurance Coverage2023-03-21021 March 2023 Annual Notification of Property Insurance Coverage L-23-085, 1 to Emergency Plan2023-03-10010 March 2023 1 to Emergency Plan L-23-057, Energy Harbor Nuclear Corp Retrospective Premium Guarantee2023-02-20020 February 2023 Energy Harbor Nuclear Corp Retrospective Premium Guarantee L-23-017, Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 192023-01-31031 January 2023 Mid-Cycle Revisions to the Core Operating Limits Report for Operating Cycle 19 L-22-271, Emergency Plan2022-12-20020 December 2022 Emergency Plan L-22-272, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023)2022-12-16016 December 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis (EPID L-2021-LLA-0067) and Withdrawal of Exemption Requests (EPIDs L-2021-LLE-0022 and L-2021-LLE-0023) L-22-263, Spent Fuel Storage Cask Registration2022-12-12012 December 2022 Spent Fuel Storage Cask Registration L-22-254, Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 222022-11-18018 November 2022 Emergency Plan for Perry Nuclear Power Plant, Including EAL Matrix Revision 22 L-22-250, Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 192022-11-0808 November 2022 Mid-Cycle Revision to the Core Operating Limits Report for Operating Cycle 19 L-22-221, Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-10-18018 October 2022 Supplement to Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-201, Submittal of Evacuation Time Estimates2022-09-12012 September 2022 Submittal of Evacuation Time Estimates L-22-050, Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual2022-08-0909 August 2022 Summary of Changes to the Energy Harbor Nuclear Corp. Quality Assurance Program Manual L-20-239, Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2022-08-0505 August 2022 Application to Revise the Technical Specifications to Adopt TSTF-541, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position L-22-171, Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-0632022-07-14014 July 2022 Response to Request for Additional Information Regarding Proposed Inservice Inspection Alternative IR-063 L-22-099, Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis2022-06-0101 June 2022 Supplement to License Amendment Request to Revise the Methodology Used for Flood Hazard Analysis L-22-104, Annual Radiological Environmental Operating Report2022-04-28028 April 2022 Annual Radiological Environmental Operating Report L-22-110, Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement2022-04-28028 April 2022 Response to Request for Additional Information Re 10CFR50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirement L-22-105, Annual Radiological Effluent Release Report2022-04-27027 April 2022 Annual Radiological Effluent Release Report L-22-082, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-23023 March 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations L-22-056, Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage2022-03-22022 March 2022 Energy Harbor Nuclear Corp., Annual Notification of Property Insurance Coverage L-22-052, Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines2022-03-16016 March 2022 Deviation from BWRVIP-42 Revision 1-A, BWR Vessel and Internals Project, Low Pressure Coolant Injection (LPCI) Coupling Inspection and Flaw Evaluation Guidelines L-22-073, Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant2022-03-16016 March 2022 Submittal of the Decommissioning Funding Status Report for Perry Nuclear Power Plant L-22-023, Retrospective Premium Guarantee2022-02-17017 February 2022 Retrospective Premium Guarantee L-21-280, 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements2022-01-0505 January 2022 10 CFR 50.55a Request Number VR-12, Revision 0, Request for Relief from Containment Isolation Valve ASME OM Code Requirements L-21-282, Proposed Inservice Inspection Alternative IR-0632022-01-0505 January 2022 Proposed Inservice Inspection Alternative IR-063 L-21-259, 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing2021-12-28028 December 2021 10 CFR 50.55a Requests Number VR-10 and VR-11, Inservice Valve Testing L-21-287, Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter)2021-12-20020 December 2021 Submittal of Revision 22 to Updated Safety Analysis Report (Supplement Letter) 2024-01-24 Category:Licensee Event Report (LER) MONTHYEAR05000440/LER-2017-0062017-12-0101 December 2017
[Table view]Loss of Safety Function due to the Inoperability of Both Trains of Motor Control Center Ventilation, LER 17-006-00 for Perry Nuclear Power Plant Regarding Loss of Safety Function due to the Inoperability of Both Trains of Motor Control Center Ventilation 05000440/LER-2017-0042017-10-0404 October 2017 Loss of Safety Function for High Pressure Core Spray Suppression Pool Level Instrumentation, LER 17-004-00 for Perry re Loss of Safety Function for High Pressure Core Spray Suppression Pool Level Instrumentation 05000440/LER-2017-0052017-10-0404 October 2017 Controller Malfunction results in Momentary Degradation of Secondary Containment Pressure, LER 17-005-00 for Perry Nuclear Power Plant Regarding Controller Malfunction Results in Momentary Degradation of Secondary Containment Pressure 05000440/LER-2017-0022017-06-27027 June 2017 Loss of Safety Function Due to Main Turbine Bypass Valve Opening, LER 17-002-00 for Perry Nuclear Power Plant Regarding Loss of Safety Function Due to Main Turbine Bypass Valve Opening 05000440/LER-2017-0032017-06-26026 June 2017 Annulus Exhaust Gas Treatment System Loss of Safety Function, LER 17-003-00 for Perry Nuclear Power Plant Regarding Annulus Exhaust Gas Treatment System Loss of Safety Function 05000440/LER-2016-0042017-02-24024 February 2017 Loss of Safety Function Due to Two Inoperable Standby Liquid Control Subsystems, LER 16-004-00 for Perry Regarding Loss of Safety Function Due to Two Inoperable Standby Liquid Control Subsystems L-16-366, LER 16-03-001 for Perry Nuclear Power Plant Loss of Safety Related Electrical Bus Results in a Loss of Shutdown Cooling2016-12-21021 December 2016 LER 16-03-001 for Perry Nuclear Power Plant Loss of Safety Related Electrical Bus Results in a Loss of Shutdown Cooling L-16-365, LER 16-01-001 for Perry, Unit 1, Regarding Pressure Boundary Leakage, Level 8 Automatic SCRAM, and APRM Loss of Safety Function2016-12-21021 December 2016 LER 16-01-001 for Perry, Unit 1, Regarding Pressure Boundary Leakage, Level 8 Automatic SCRAM, and APRM Loss of Safety Function ML16138A3342016-05-17017 May 2016 ASP Analysis - Reject Perry Nuclear Power Plant, Unit 1 (440-2014-005) ML16138A3362016-05-17017 May 2016 ASP Analysis - Reject Perry Nuclear Power Plant, Unit 1 (440-2014-004) 05000440/LER-2016-0032016-04-0808 April 2016 Loss of Safety Related Electrical Bus Results in a Loss of Shutdown Cooling, LER 16-003-00 for Perry Regarding Loss of Safety Related Electrical Bus Results in a Loss of Shutdown Cooling 05000440/LER-2016-0022016-04-0808 April 2016 Manual Reactor SCRAM Due to Spurious Opening of Safety Relief Valves, LER 16-002-00 for Perry Regarding Manual Reactor SCRAM Due to Spurious Opening of Safety Relief Valve 05000440/LER-2016-0012016-03-23023 March 2016 Pressure Boundary Leakage, Level 8 Automatic SCRAM, and APRM Loss of Safety Function, LER 16-001-00 for Perry Nuclear Power Plant Regarding Drywell Leakage, Level 8 Automatic SCRAM and APRM Loss of Safety Function L-13-194, LER 13-S02-01 for Perry, Unit 1 Regarding Security Weapon Left Unattended2013-06-25025 June 2013 LER 13-S02-01 for Perry, Unit 1 Regarding Security Weapon Left Unattended L-13-143, LER 13-S02-00, for Perry Nuclear Power Plant, Unit 1, Regarding Security Weapon Left Unattended2013-04-30030 April 2013 LER 13-S02-00, for Perry Nuclear Power Plant, Unit 1, Regarding Security Weapon Left Unattended L-13-119, LER 13-S01-00 for Perry Nuclear Power Plant, Unit 1, Regarding Local Power Range Monitors Delivered to the Incorrect Address2013-03-15015 March 2013 LER 13-S01-00 for Perry Nuclear Power Plant, Unit 1, Regarding Local Power Range Monitors Delivered to the Incorrect Address L-12-114, LER 12-S02-00, for Perry Nuclear Power Plant, Unit 1, Regarding Potential Vulnerability in a Safeguards Security System2012-03-22022 March 2012 LER 12-S02-00, for Perry Nuclear Power Plant, Unit 1, Regarding Potential Vulnerability in a Safeguards Security System L-12-083, LER 12-S01-00, Latent Software Error Resulted in Improperly Authorized Visitor Access Into Protected Area2012-02-29029 February 2012 LER 12-S01-00, Latent Software Error Resulted in Improperly Authorized Visitor Access Into Protected Area L-08-052, LER 07-04-001 for Perry Nuclear Power Plant Re Automatic Reactor Protection System Actuation Due to Feedwater Control Power Supply Failure2008-02-15015 February 2008 LER 07-04-001 for Perry Nuclear Power Plant Re Automatic Reactor Protection System Actuation Due to Feedwater Control Power Supply Failure ML0533301242005-11-18018 November 2005 LER 05-03-00 for Perry Nuclear Power Plant Lack of Suction Flow Path Causes High Pressure Core Spray to Be Inoperable ML0509602632004-12-17017 December 2004 Final Precursor Analysis - Perry Grid Loop 2017-06-27 |