IR 1320145; B2F26 2PR 01J Cannot Be Started Following the Loss of Units SATs
ML12268A159
Person / Time
Site: Byron Constellation icon.png
Issue date: 01/30/2012
From:
Exelon Generation Co
To:
NRC/RGN-III
References
FOIA/PA-2012-0287
Download: ML12268A159 (2)


Text

AR 01320145 Report Aft Fac: Byron AR Type: CR Status: APPROVED Aft Unit: 00 Owed To: ACAPALL Due Date: 02/29/2012 Aff System: PR Event Date: 01/30/2012 CR / Disc Date: 01/30/2012 LevellClass:

How H02 Orig Date: 01/30/2012 Discovered:

WR/PIMS Equip Tag: -

AR:

Action Request Details

Subject:

2PR01J CAN NOT BE STARTED FOLLOWING THE LOSS OF UNIT 2 SAT'S

==

Description:==

Originator: Ib)(I)Supv Contacted:E l Condition

Description:

2PRO13 can not be started following the loss of Unit 2 SAT's Immediate actions taken:

Initiated IR Recommended Actions:

Investigate Repaire What activities, processes, or procedures were Involved?

Loss of Unit 2 SAT's Why did the condition happen?

Unknown What are the consequences?

LCO Entry for OBOL 11. b Were any procedural requirements impacted?

LCO entry Were there any adverse physical conditions?

LCO Entry List of knowledgeable individuals:

(b)(6) I Repeat or similar condition?

Unknown flohoRacie.

CT

Reportable Basis:

FunctionalityBasis:

Assignments Assign #: o1 Assigned Status: AWAIT/C To:

Aft Fac: Byron Prim Grp: ACAPALL Due Date: 02/04/2012 Assign Type: TRKG Sec Grp: Orig Due Date:

Priority:

Schedule Ref:

Unit Condition:

Subject/Description: 2PR01J CAN NOT BE STARTED FOLLOWING THE LOSS OF UNIT 2 SAT'S 2PR01J