IR 05000027/2018202

From kanterella
Jump to navigation Jump to search
Washington State University - U.S. Nuclear Regulatory Commission Security Inspection Report No. 50-027/2018-202 (Letter)
ML18284A360
Person / Time
Site: Washington State University
Issue date: 10/19/2018
From: Anthony Mendiola
Research and Test Reactors Oversight Projects Branch
To: Wall D
Washington State Univ
Bassett C, NRR/DLP, 415-1842
References
IR 2018202
Download: ML18284A360 (4)


Text

ber 19, 2018

SUBJECT:

WASHINGTON STATE UNIVERSITY - U.S. NUCLEAR REGULATORY COMMISSION SECURITY INSPECTION REPORT NO. 50-027/2018-202

Dear Dr. Wall:

From October 1-4, 2018, the U.S. Nuclear Regulatory Commission (NRC) conducted a security inspection at your Washington State University Training, Research, Isotopes, General Atomics

[TRIGA] Research Reactor facility located in the Nuclear Science Center. The inspection included a review of activities authorized for your facility.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations and compliance with the conditions of your license. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel. Based on the results of this inspection, no security concern or findings of non-compliance with NRC requirements were identified. No response to this letter is required.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) Section 2.390, Public inspections, exemptions, requests for withholding, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the NRCs document system (Agencywide Documents Access and Management System (ADAMS)).

ADAMS is accessible from the NRC Website at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, because of the security-related information contained in the inspection report, and in accordance with 10 CFR 2.390(d), a copy of the report will not be available for public inspection. Should you have any questions concerning this inspection, please contact Craig Bassett at 240-535-1842.

Sincerely,

/RA/

Anthony J. Mendiola, Chief Research and Test Reactors Oversight Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No.50-027 License No. R-76 cc: See next page

Washington State University Docket No.50-027 cc:

Director Division of Radiation Protection Department of Health 7171 Cleanwater Lane, Bldg #5 P.O. Box 47827 Olympia, WA 98504-7827 Mr. David Clark, Director Washington State University Radiation Safety Office P.O. Box 641302 Pullman, WA 99164 1302 Dr. Ken Nash Chair Washington State University Reactor Safeguards Committee Nuclear Radiation Center P.O. Box 641300 Pullman, WA 99164 1300 Mr. Corey Hines, Associate Director Washington State University Nuclear Science Center P.O. Box 641300 Pullman, WA 99164-1300 Test, Research and Training Reactor Newsletter P.O. Box 118300 University of Florida Gainesville, FL 32611-8300

ML18284A360 Ltr.; ML18284A361 Ltr/Report; ML18284A362 Pkg.

  • concurrence via e-mail NRC-002 OFFICE NRR/DLP/PROB/IN* NRR/DLP/PROB/LA NRR/DLP/PROB/BC NAME CBassett NParker AMendiola DATE 10/17/2018 10/17/2018 10/19/2018