AEP-NRC-2020-17, Unit 2, Changes Made to the Cyber Security Plan, Revision 2

From kanterella
Jump to navigation Jump to search
Unit 2, Changes Made to the Cyber Security Plan, Revision 2
ML20066F478
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/04/2020
From: Scarpello M
American Electric Power, Indiana Michigan Power Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
AEP-NRC-2020-17
Download: ML20066F478 (3)


Text

m INOIANA Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390 Indiana Michigan Power MICHIGAN Cook Nuclear Plant POWER One Cook Place Bridgman, Ml 49106 A unit ofAmerican Electric Power lndianaMichiganPower.com March 4, 2020 - AEP-NRC-2020-17 10 CFR 50.54(p )(2)

Docket Nos.: 50-315 50-316 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Donald C. Cook Nuclear Plant Unit 1 and Unit 2 CHANGES MADE TO THE DONALD C. COOK NUCLEAR PLANT CYBER SECURITY PLAN, REVISION 2 Pursuant to the provisions of 10 CFR 50.54(p)(2), Indiana Michigan Power Company (l&M), licensee for Donald C. Cook Nuclear Plant (CNP) Unit 1 and Unit 2, is submitting Revision 2 to the "Donald C.

Cook Nuclear Plant Cyber Security Plan," which became effective on February 26, 2020.

The enclosure to this letter provides a list of the changes made to the CNP Cyber Security Plan in Revision 2, and the revised Cyber Security Plan.

The changes incorporated into this revision are consistent with 10 CFR 50.54(p ), do not decrease the effectiveness of the cyber security plan, and do not require U. S. Nuclear Regulatory Commission approval prior to implementation.

The enclosure containing the revision of the CNP Cyber Security Plan contains Security Related Information and should be withheld from public disclosure under the provisions of 10 CFR 2.390.

This letter contains no new regulatory commitments. Should you have any questions, please contact me at (269) 466-2649.

e;.Yiti Michael K. Scarpello Regulatory Affairs Director MBE/mll Notice
When separated from Security Related Information enclosure(s), this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390 U. S. Nuclear Regulatory Commission AEP-NRC-2020-17 Page 2

Enclosure:

List of Changes Affecting the Donald C. Cook Nuclear Plant Cyber Security Plan, Revision 2 and Donald C. Cook Nuclear Plant Cyber Security Plan, Revision 2 c: w/o enclosure:

R. J. Ancona, MPSC R. F. Kuntz, NRC Washington, D.C.

EGLE - RMD/RPS NRC Resident Inspector D. J. Roberts, NRC Region Ill A. J. Williamson, AEP Ft. Wayne Notice: When separated from Security Related Information enclosure(s), this document is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390 ENCLOSURE TO AEP-NRC-2020-17 LIST OF CHANGES AFFECTING THE DONALD C. COOK NUCLEAR PLANT CYBER SECURITY PLAN, REVISION 2 AND DONALD C. COOK NUCLEAR PLANT CYBER SECURITY PLAN, REVISION 2 Any person responsible for the unauthorized disclosure of this information Is subject to CIVIL and CRIMINAL Sanctions Notice: When separated from Security Related Information contained within this enclosure(s),

this page is decontrolled provided the transmittal document does not otherwise warrant protection from unauthorized disclosure.

Security Related Information Withhold From Public Disclosure Under 10 CFR 2.390