Finding | |
---|---|
Title | Failure to Follow Operability Procedure Results in Potential Inoperability of the 2A-A Auxiliary Feedwater Pump |
Description | The NRC identified a SL IV NCV of 10 CFR 50, Appendix B, Criterion V, Instructions, Procedures, and Drawings, at Watts Bar Unit 2 for the licensees failure to follow procedure OPDP-8, Operability Determination Process and Limiting Condition for Operation Tracking, Revision 22. Specifically, the 2A-A motor-driven auxiliary feedwater pump (MDAFW) was potentially inoperable in mode 3 due to inadequate compensatory measures that were being controlled outside of the operability process. The issue was corrected and the pump returned to operable status on April 19, 2016. The issue was entered into the licensees corrective action program as CR 1163431. The performance deficiency was more than minor because it represented an improper or uncontrolled work practice that could impact quality or safety, involving safety-related SSCs. Specifically, failure to appropriately use the operability process when measures must be established to compensate for degraded or nonconforming conditions can lead to SSC inoperability. As described in IMC 2517, the significance of this issue was determined using traditional enforcement, because the cornerstone associated with this finding was not being assessed by the reactor oversight process (ROP). The inspectors determined this finding to be of very low safety significance, SL IV because it represented a failure to meet a regulatory requirement, specifically a quality assurance (QA) criteria to follow quality-related procedures, which had more than minor safety significance. The finding was assigned a cross-cutting aspect of Work Management in the Human Performance area because the minor maintenance work order created to compensate for the oil loss from the 2A-A MDAFW pump was never reviewed by operations, which could have identified the out of process error. [H.5]. |
Site: | Watts Bar |
---|---|
Report | IR 05000391/2016002 Section 1R15 |
Date counted | Jun 30, 2016 (2016Q2) |
Type: | TEV: Severity level IV |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.15 |
Inspectors (proximate) | A Blamey A Lerch C Young D Dumbacher D Jones G Callaway J Eargle J Hamman J Jandovitz J Nadel L Micewski N. Pitoniak R Fanner S Sanchez |
Violation of: | 10 CFR 50 Appendix B Criterion V |
CCA | H.5, Work Management |
INPO aspect | WP.1 |
' | |